Project Scope, Time, Cost, and Quality - Essay Example

Cite this document
Summary
The writer of the current essay seeks to describe the contribution of the capbility maturity model in evaluating and measuring the maturity of the software development process of organizations. Additionally, the paper will describe each of the five scale levels of the CMM…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER92.9% of users find it useful
Project Scope, Time, Cost, and Quality
Read Text Preview

Extract of sample "Project Scope, Time, Cost, and Quality"

Download file to see previous pages

In level one of the maturity model, the processes are ad hoc and chaotic. The project is completed and results are obtained but the success is not repeatable since much is attributed to the skills of the resources involved. Also often the project exceeds limits of time and budget and critical processes are overlooked to get the work done. To move from this level to the next, definite practices need to be put in place and the company should only accept projects that can be executed within its infrastructure.

In level two, some project management practices are in place and hence the results are repeatable. Also processes are adhered to even when time is critical and results are documented for future use. Process discipline and project specific standards helps in this level, but to move on to the next level, organization-wide fixed standards are essential, and they allow for project specific versions as a deviation. Requirement Management, Project Planning, Tracking and Oversight, Quality Assurance and Configuration Management are introduced at a project specific level.

In maturity level three, the process is now tailored for every aspect of the project. The measuring tools, standards and methodology are in place and the management has knowledge of the project status at all times. The key feature is that there is consistency in the processes and project quality is assured. To move on to the next level, statistical analysis will go a long way to predict performances accurately. Level 2 Quality management and processes are defined and managed at an organization level instead of at a project level.

PMMM Level 4 ManagedIn maturity level four, the measurements of the project management processes are very well defined and precise: statistical techniques are employed for even the sub processes as they are considered to impact the overall performance. The processes are maintained even when modifications are needed due to project uniqueness. The projects can now be quantitatively predicted as compared to the qualitative predictions in level three. Software Quality Management and Quality Process Management are introduced at this level.

PMMM Level 5 OptimizedIn maturity level five, continuous self-improvement processes are

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Project Scope, Time, Cost, and Quality Essay Example | Topics and Well Written Essays - 500 words”, n.d.)
Project Scope, Time, Cost, and Quality Essay Example | Topics and Well Written Essays - 500 words. Retrieved from https://studentshare.org/business/1531636-project-scope-time-cost-and-quality
(Project Scope, Time, Cost, and Quality Essay Example | Topics and Well Written Essays - 500 Words)
Project Scope, Time, Cost, and Quality Essay Example | Topics and Well Written Essays - 500 Words. https://studentshare.org/business/1531636-project-scope-time-cost-and-quality.
“Project Scope, Time, Cost, and Quality Essay Example | Topics and Well Written Essays - 500 Words”, n.d. https://studentshare.org/business/1531636-project-scope-time-cost-and-quality.
  • Cited: 0 times

CHECK THESE SAMPLES OF Project Scope, Time, Cost, and Quality

A Bachelors of Arts Degree in Management of Technology

Project management involves the planning and facilitation of projects with a goal to complete the job within budget, on time and to manage the ever-changing requirements and needs of projects (Schmidt, 2009).... After making us aware that you were pursuing a bachelors of Arts degree in Management of technology, in business, we agreed that the best options this gave you were either project consultancy or project management.... As a project consultant, you would be required to provide information to project teams of cross-functional nature on how to implement company directives, while also offering management and leadership services during their implementation (Wysocki, 2011)....
14 Pages (3500 words) Essay

The Relationship and Usefulness of Time, Cost and Quality behind the Success of Project

This paper aims to critically evaluate the relationship and usefulness of time, cost and quality behind the success of a project.... A trade-off relationship exists between the cost and the time required to complete the project.... There are two types of cost involved in a project, direct cost and indirect cost.... The team of project managers handles the various activities of the project that involves competing demands for cost, time, quality and risk, managing the expectation of the shareholders and identifying the requirement....
8 Pages (2000 words) Coursework

'Estimating Project Costs'

t the initial level of project when requirements are not vivid it is difficult to come up with accurate initial estimates of cost and time.... For successful accomplishment of each phase we are required to perform procedures associated with that phase and to produce quality oriented, customer focused… Though every phase has its own importance but from estimation perspective project planning is the most important phase.... Based on the requirements set forth by customer project manager opt for defining WBS(Work Break Down Structure) for the project that constitutes of cost is also the most important parameter of exclusive concern for higher level management, accountant, customer and other stakeholders of project and cost estimation is also performed during project planning phase....
4 Pages (1000 words) Assignment

Project Managment for Boeing 787 Dreamliner

One of the best tools to help project managers at any level is the Project Matrix technique, through which the manager makes trade-offs based on constraining, enhancing or accepting the main project criteria; time, cost and performance (Frame 2003, p.... roject managers have to make trade-offs among the scope, time and cost considerations in a bid to establish project priorities (Westland 2007, p.... First, the establishment of SMART Boeing 787 Dreamliner project objectives involves proper considerations on timelines; secondly, the work break-down structure of projects deeply embeds time considerations; lastly, the traditional relationship between time and cost translates to a situation where delaying the project increases the cost of the project....
4 Pages (1000 words) Essay

Case project analysis

However, the extent of the project scope statements varied substantially and depended on the number of details and relevant elements related to the project.... While the general scope of the project was defined in a right way, there were some obvious problems with cost estimate calculation of the project.... Thus, for example, the cost estimate was $US 220... For both projects there were used scope statements as tools of project planning process....
10 Pages (2500 words) Assignment

The Positional Risks in ACME Development Corporation ADC Project

The first risk factor I have covered in the project scope of work; I have provided the solution to this factor by having a clear scope by the consultation to all project designers.... This case study deals with the positional risks in ACME Development Corporation (ADC) project.... The author of this work describes the risks and the response to those risks for neutralizing them in the project development.... The writer suggests remembering the points according to the significance of the project factor, risk factor, and requirement....
14 Pages (3500 words) Case Study

Studying at Masters Level and Research Methods

If combined through this application, the system will be free from faults and will perform highly at a low cost.... The author of this paper "Studying at Masters Level and Research Methods" examines the database clustering core attributes, the main types, the intended system capabilities, the objectives and the costs, the software used in the architecture of the research, and other details....
15 Pages (3750 words) Assignment

The Proposed Four Storey with Basement Project

This report critically analyses the proposed project in terms of the designed drawings in the context of a program of works, project management, environmental impacts, sustainability, cost and value engineering, and BIM and Management facilities.... The proposed project has business offices already booked by clients and therefore needs to be in the shortest time possible.... Such a project requires a construction plan that ensures the client gets the product in due time....
21 Pages (5250 words) Report