StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...
Free

Kitchen Remodeling Risk Management - Research Paper Example

Cite this document
Summary
This essay focuses on the brief analysis of the risk management, that can impact the process of the kitchen remodeling. The researcher aims at presenting the projected costs and value of a common kitchen remodeling plan and approximations for better urban regions…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER98% of users find it useful
Kitchen Remodeling Risk Management
Read Text Preview

Extract of sample "Kitchen Remodeling Risk Management"

Kitchen Remodeling Risk Management Summary of the process Project assumptions will include the projected costs and value of a common kitchen remodeling plan. Raised-up approximations for better urban regions and the moderated approximations where home values are lower than the coast-to-coast average need to be made. Project sketch will include the changing cupboards, floor tiles, countertops, sanitation fixtures, lighting and pieces of equipment. Using extraordinary, excellent grade supplies, construction and lasting detail. 1.1 Identifying risks This is amid the foremost choices that property-owners have to eventually deal with when developing a remodeling project (small kitchen in this case).

  What are the risks?  Value, span of time required, financial plan and standard of work are the key features that one has to consider when formatting such an acute process. 1.1.1 Project Based Risks 1.1.1.1 Initiating with an Unclear Remodeling Strategy Beginning the project earlier to creating a list of “wants,” “requirements,” and “desires”, there is a risk of overstepping the established kitchen remodeling budget. 1.1.1.2 Choosing the Wrong Dealer Homeowners too often are coaxed into choosing the wrong contractor and wind up desperate, exorbitant and annoyed. 1.1.

2 Product Based Risks 1.1.2.1 Choosing the Wrong Sink and faucet Faucet selection is an example of product based risk. If a faucet is selected that doesn’t have the same number of holes in the sink that current faucet has can cause problems plus if there is wayward spacing between those openings will surely need setting (Budget Kitchen Remodel, 2010). 1.1.3 Budget Risks For a small kitchen, finances for remodeling are usually limited. Amongst a small kitchen remodel, it’s very probable to lose sight of exactly how much money is being spent, crossing over the cost-effective boundaries, frequently and quite considerably (Admin, 2010). 1.2 Qualitative analysis Expenditures must be related to sensible completion of this qualitative analysis schedule; Thorough calculation of whole project price, counting breakouts for rents, materials, labor and all payments should reveal whether any item is going overboard Whether Thorough roll plan, split out in principal activities and significant milestones on weekly basis are being followed or not Broad list of textures, apparatuses, and fixtures with numbers must be updated for new items or items which are no longer needed any more Competence and capacity (water, power, air circulation) necessities for all new elements is working properly or not (it might need additional fixing, in case it’s not working) 1.

3 Planning responses to risk Having a financial cushion to take care of all the budgeting risks (in case uncertainties do happen) Having a backup plan if what had been listed initially in the project is not available or feasible any more. 1.4 Risk monitoring and controlling Either the person monitoring the remodel work or the service provider must take liability for each of the following tasks; Checking that scheduled kitchen remodeling will achieve home owner association provisions Assessment of tasks to be done; rereading value necessities and payment terms before work initiates Talking in detail all standards, presentations, strategy, method and cost distributions Evaluating sample and primary designs Providing conclusive plan(s), upgrades, detail sketches and production synopses Submitting final fee; recompensing with a check to assure that disbursement can be verified for tax obligations 1.

5 Mitigation ‘Low ball bidding’ can start, where the contractor will try to give the home owner the lowest affordable price just to save him the money. After the job has started, identifying short comings and rectifying them will cost additional expenditures. On the contrary, if an expense turns out to be unnecessary or something that can be removed from the plan will help in saving money and time, which is why milestones are vital for mitigation. 1.6 Project Review Once the project is underway, a weekly review needs to be performed.

Processes that are working according to plan must and should be continued and the ones that are costing too much money or are slowing down the remodeling need to be amended or removed. One mistake owners usually make is assuming they have to start from scratch, when all they probably need is to reface instead of altering their whole cabinet equipment (Budget Kitchen Remodel, 2010). Works Cited Admin. (2010, Sep 6). Is Your Small Kitchen Remodel Project At Risk For Budget Overruns? Retrieved Aug 14, 2011, from Renovation Ideas to Inspire You: http://www.

renovationideas.org/renovation-ideas/is-your-small-kitchen-remodel-project-at-risk-for-budget-overruns Budget Kitchen Remodel. (2010, Jan, Oct). Retrieved Aug 14, 2011, from Small Kitchen Remodel: http://www.smallkitchenremodel.net/tag/budget-kitchen-remodeling/

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Kitchen Remodeling Risk Management Research Paper”, n.d.)
Retrieved from https://studentshare.org/business/1579321-kitchen-remodeling-risk-management
(Kitchen Remodeling Risk Management Research Paper)
https://studentshare.org/business/1579321-kitchen-remodeling-risk-management.
“Kitchen Remodeling Risk Management Research Paper”, n.d. https://studentshare.org/business/1579321-kitchen-remodeling-risk-management.
  • Cited: 1 times

CHECK THESE SAMPLES OF Kitchen Remodeling Risk Management

Financing Plan to Raise Capital

The vast amounts of locations reflect the effective and efficient management which has led a small investment in a single cafe into an internationally recognized business expanding in just over 18 years.... With such growth, the management has decided to open more outlets for the restaurant.... It is also risky if there are no dividends payable at year end thus shareholders end up bearing the operational risk.... The information maybe whether the company is raising debt or equity, the risk the investors may face and the terms of the investment( share price, maturity dates or note amounts)....
4 Pages (1000 words) Research Paper

TCM Copper Concentrate Storage and Load-Out Facility Risk Review in British Colombia

During the transportation, concentrate loss occurs because of moisture content, which is a big risk.... It loses the equilibrium of the cargo, flowing in any one position, which creates a risk for the ship, losing its stability and increasing the chances of drowning (Spencer and Tilsley 3)....
23 Pages (5750 words) Assignment

Sports Bar Project Issues

Partnering is essential to enhance the viability of the business especially in finances and management.... The management will provide drinks and special foods to the team they support during their game nights.... Name: Instructor: Course: Date: Sports Bar A.... Project description Premier Sports bar is a new destination that offers customers with an opportunity to socialize, eat, and drink as they watch televised sports events....
8 Pages (2000 words) Essay

Sustainable Construction

The paper "Sustainable Construction" tells us about artificial lighting.... With all the environmental and energy depletion issues hounding our society today, there has been growing interest in sustainable development.... hellip; This paper discusses one approach to achieve sustainability in the built environment – the low energy artificial lighting design....
6 Pages (1500 words) Assignment

MGM465-0801A-05 Business Strategy - Phase 2 Individual Project

It is necessary to improve efficiency by shaking up the top-level management.... The factors responsible for home improvement were preference for larger and more luxurious living spaces, significant number of homeowners opting for remodeling of kitchen and bathrooms, and in many cases new homeowners opting for home improvement within first two years of purchase.... The total remodeling expenditure in USA in 2005 amounted to $280 billion of which $188 billion was for Home repairs and improvement....
4 Pages (1000 words) Essay

The Level of Knowledge of Food Borne Illness and Food Safety Practices mong EPA Employees

Food safety practices are usually taught by health care practitioners, dieticians and through media outlets that attempt to inform consumers, food handlers and at risk population's... It was determined that an investigation into food safety handling knowledge of employees would be beneficial in determining whether or not an educational… Two groups of participants were recruited, those with food safety education that occurred less than 10 years ago and those that had education longer than 10 years ago or no education at all....
32 Pages (8000 words) Essay

An Entrepreneurs Guide to Launching and Managing a New Business

The paper concerns the Antonius restaurant industry located at Cabo San Lucas in Mexico generated over $1.... 4 billion in sales in 2012.... Cabo San Lucas is one of the most beautiful cities in Mexico with several tourism sites.... Due to its increasing significance as the spa destination.... hellip; States entrepreneurs with just the strategic section of a business plan have 50 percent more profits, unlike those entrepreneurs who venture directly into a business without a business plan....
8 Pages (2000 words) Research Paper

Risk Management for the Anywhere Community Centre Fire

… The paper "risk management for the Anywhere Community Centre Fire" is a good example of a case study on management.... nbsp;Fire risk management is a function of probabilistic risk analysis that is taken into account during fire design prevention engineering.... Fire risk management provides an appropriate recommended level of health and safety that users of premises require.... The paper "risk management for the Anywhere Community Centre Fire" is a good example of a case study on management....
12 Pages (3000 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us