Report On Building and Programming a LEGO Mindstorm Robot - Research Paper Example

Only on StudentShare

Extract of sample
Report On Building and Programming a LEGO Mindstorm Robot

The very first Mindstorms Robotic invention Kit comprised of two motors, two touches of sensors and a single light sensor, and yet performed well, although many improvements made on the kit comprises a number of parts. There has been an increase in the uses of these robots in daily lives (Costlow 47). In fact, engineers use these models to build a model of an embedded system with computer controlled electromechanical parts. In reality, various real life systems have borrowed a lot from these robotic models by embedding them in different systems such as elevators and industrial robots. Increasingly, many of these appliances and equipment borrow from this idea. Therefore, schools have taken to teaching engineering practices using these tools. In a group, students undertook to build a robot. Following is the report compiled after they finished exercise.
Before starting the process of building and programming a LEGO, planning the procedure is the initial step of the whole process. Before commencing with the process, deciding what the group wanted to build was the first step (“Robotics Design Process”). All the required materials should be available and fully meet the requirements of the specific robot in mind. Although most of the items work for different robots, some require special parts. ...
Download paper

Summary

The LEGO Mindstorm series consists of hardware and software are kits used by people, students and engineers to create and customize programmable robots. This kit includes a programmable brick computer that acts as a control to the system…
Author : abigayleheaney

Related Essays

Sustainable building
Center of discussion in this paper is sustainable building as the one that has higher energy efficiency, does not or less produces or less contribute in producing the green house gases emissions and the building that makes no burden to the ecology and environment. The construction of such a building is practically possible by making smaller changes to the way we live and construct our houses. Sustainable building utilized the sustainable materials that are renewable. Moreover a structure that utilizes less resources and utilizes the sustainable resources like solar, wind, geothermal, etc to...
15 pages (3765 words) Assignment
Construction in Dubai
This paper illustrates that regardless of the dangers that await the working sector, the construction business is considered to be the backbone of Dubai's flourishing economy. Dubai has gathered much attention in recent years with their fascinating and innovative building ideas and architectural wonders, like the Dubai Skyline and the Burj al Arab, among others. Real estate and construction( 22.6%) are the largest contributors to Dubai's economy, and are considered amongst one of the key sources of employment, income and growth. Before jumping into attempting this building survey, we first...
10 pages (2510 words) Assignment
Bridge building
However, some simple bridges are set on the ground without first installation of the supporting systems it is of importance to note that when this is done underground preparation has to be done. Every edge of the bridge is always tested to make sure that there is stability. Shoring and underpinning techniques are important to ensure that we come up with a stable bridge. For more stability, excavation of the soil as well as the backfilling of the soil is important however, it is not necessary. Piers are always laced vertically on the edges of the bridge to make sure that the bridge gets the...
11 pages (2761 words) Essay
Report on the Perceived Advantages and Disadvantages of Building a Theme Park in a Neighbourhood
It also assesses the expectations, both positive and negative, of the neighborhood residents from the theme park to be constructed. Methodology This study is based on a close-ended, structured and non-disguised questionnaire designed to explore the perceived effect on local residents by the building of a local theme park. The questionnaire was given to the oldest member of each household to be completed and returned within a month. The respondents were informed about the purpose of the questionnaire, and that their responses were vital for planning the construction. Respondents were assured of...
6 pages (1506 words) Essay
Report
However some technical problems such as weight of the arm and unforeseen parameters of the robot going out of the maze were encountered in execution of the project. The objective of the project is to enable a robot to look for a ball and pick it up while avoiding black lines. The goal is divided into a logical sequence that enables the robot to achieve its goal. The sequence flow is as follows. The necessary parameters for the robot are set, these include the sensors and motors that enable the robot to move. The robot then looks for a ball. It then estimates and determines the distance to the...
6 pages (1506 words) Lab Report
CTV Building
The report produced by the Royal Commission had also officially identified the key players after the disaster. This report aims to evaluate the faults on the part of the key players and stakeholders leading to technical deficiencies in the design of the building. Gerald Shirtcliff was the CTV building’s site manager and he was later found to have faked his qualifications and therefore was not up to the mark. The head of the consultation firm, ARCL, Alan Reay was said to be “ultimately responsible” even though his designer and engineer David Harding was inexperienced in working with...
11 pages (2761 words) Assignment
CTV Building Collapse: Case Report
A number of investigations were carried out to figure out the causes of the building collapse and all the investigation reports pointed to poor building design and construction operations. The principal engineer Alan Reay employed an inexperienced engineer (David Harding) for the building design. In addition, Reay did not supervise the operations of Harding and hence many potential defects in the construction process had gone unidentified. To worsen the problem, the construction manager failed to properly guide the building’s foreman. The Christchurch City Council issued a permit for this...
8 pages (2008 words) Assignment
Got a tricky question? Receive an answer from students like you! Try us!