Sustainability in construction starts at the design stage of a project. Identify and explain the main constituents of sustainabl - Essay Example

Only on StudentShare
Masters
Essay
Engineering and Construction
Pages 6 (1506 words)

Summary

Sustainability in construction starts at the design stage of a project. Identify and explain the main constituents of sustainable design. Table of contents 1. Introduction ………………………………………………………………………3 2…

Extract of sample
Sustainability in construction starts at the design stage of a project. Identify and explain the main constituents of sustainabl

Conclusion………………………………………………………………………..8 References………………………………………………………………………….. 9 Appendix……………………………………………………………………………10 1. Introduction Sustainability is highly involved in the construction industry. Still, the use of the rules of sustainability in the construction projects has been a rather recent trend, if taking into consideration the effects of construction on the environment (Luff 2008). In addition, not all countries set sustainability as a term for accepting plans related to construction projects (Luff 2008). UK is one of the countries that first recognized the value of sustainability in construction. It should be noted that the promotion of sustainability in construction has a series of implications, meaning especially the cost involved and the availability of expertise professionals for developing construction projects based on sustainability. Current paper focuses on a particular aspect of sustainability, as related to construction: the sustainable design and its constituents. The literature published in regard to this subject has been reviewed in explore the particular issue. It is revealed that sustainable design is a complex and demanding process which can be completed successfully only if it is appropriately supported in all its phases. 2. ...
Download paper
Not exactly what you need?

Related Essays

Rail construction project failure
The rail transport in this country is underdeveloped with rail transportation accounting for less that 1% of the land transportation (Oluwakiyesi 2011). It has been found out that non-utilization of competent consultants and contractors, inconsistencies in government policies, defective cash flow, and inadequate monitoring are the major cause of failure of projects in this country (Ololusi & Otunola 2012). However, the government and other stakeholders have been very slow to react and thus the problem continues to be evident. Morocco on the other hand is an African country that has been able…
15 pages (3765 words)
Design and Construction of Motorway Project
Through utilization of these regulations, project managers could ensure that safety and health applications remain present throughout engineering project implementation period. While engineering projects remain essential for development of the country, the impacts of the implementation process for these projects could be catastrophic. The reduction of imminent risks within the projects remains essential towards safe implementation of the entire project (Bailey, 2002). The aim of this report remains identifying the imminent hazards within the project that could present a danger to people…
6 pages (1506 words)
Sustainability in construction
For example, the UK national Grid has planned to cut domestic emissions by 45% by 2029, while the European Union countries are in agreement to harness more than 20% of their energy from renewable sources by 2020; U.K’s target is15% (Huang & Infield, 2002). In addition, Scotland and UK have plans to reduce carbon dioxide emissions by 80% by 2050, and a proposed reduction of about 42% by 2020 to curb the climate change threat (Tecs Home Energy Survey Report, 2010). Therefore, as the two articles indicate, energy usage in both domestic and in industrial applications has led to an environmental…
6 pages (1506 words)
Risks management analysis during Construction stage and Operational stage of the Channel Tunnel Project
This serves to mitigate the risk of resource shortage for the project, through the application of the principle of maximizing utilization of the resources, to ensure that they fit into the project schedule. Program monitoring and control is yet another vital risk mitigation concept under the construction phase, which entails consistent and regular evaluation of every single aspect of the project and the timely correction of any errors, to ensure that the construction process progresses without safety threats (Yan-juan, Ding-li, & Jian-jun, 2009 p3). This calls for the full adoption and…
3 pages (753 words)
project design
However, packaging of ice cream on commercial basis was always a problem for mass producers. Initially they used to supply the product in cups but in the early 1900 manufacturers identified a strong need of introducing ice cream carriers which were less costly and more productive. John was too frustrated those days because of the increasing raw material cost. He has been into the ice cream manufacturing industry since last twenty years but now he was facing immense difficulty in meeting up all the business expenses while maintaining good profit margins. His company used to do business in the…
5 pages (1255 words)
Importance of Sustainability in Construction
In Life cycle CO2 assessment of concrete by compressive strength on construction site in Korea, Junghoon Park, Sungho Tae, and Taehyung Kim build on the reduction of life cycle carbon dioxide building emissions and its increasing importance. This article will provide a good basis for research into the construction of a sustainable building. Various aspects that support the article’s academic reliability include its appearance in a relevant academic journal, the Renewable and Sustainable Energy Reviews. In addition, the authors are academics at the School of architecture and architectural…
3 pages (753 words)
Project Administration in Construction
Good project managers attempt to make sure that the work is done right first time and that key accidents take place on the project. Whilst adherence to subsisting design decisions is the key concentration of quality regulation, there are exceptions to this standard. To begin with, unexpected circumstances, inaccurate design decisions or transformations needed by an owner in the facility purpose may need re-examination of design at the time of construction. Whilst these transformations might be influenced by the issue for quality, they stand for the occasions for re-design with all the…
4 pages (1004 words)