Assignment: Engineering and Construction – The Case of CTV Building Student’s Name, I.D. Name of the University Assignment: Engineering and Construction – The Case of CTV Building Executive Summary …

Introduction

The report also aims at formulating and organising the most important recommendations for the future course of action in the field of construction safety engineering. The analysis portion of the paper has been divided into to major subsections. In subsection 2.1, personnel management issues primarily with relation to the recruitment process of a building construction team have been analysed. Contextually, it should be mentioned that the credibility of the engineering team (that had constructed the CTV Building in late 1980s) is still under various questions. In subsection 2.2, modern disaster management conception has been applied to the case of CTV Building collapse. Next, there is the section of summary and conclusion where the issue of fire safety arrangements in the building has been raised. Negligence to fire safety protocol has been diagnosed as a big problem in most of the building designs as seen in the case of CTV Building. Subsequently, three major recommendations (or groups of recommendations) have been provided at the end of the report. Table of Contents Executive Summary 1 Table of Contents 3 1. Introduction 4 2. Analysis 5 2.1 Issues regarding personnel management 10 2.2 Issues regarding disaster management 11 3. Summary and conclusions 12 4. Recommendations 13 References 15 ...
Download paper
Not exactly what you need?

Related papers

Engineering and Construction Assignment
3. 25 H 20 -6-200 B1 is the bar call up code, in this 25 is the bar no, H is the bar type/Class, 20 is the bar diameter, 6 is the earmark on the respective drawing, 200 is the spacing between the bars in mm and lastly B1 is the suffix. 4. The basic philosophy behind the bar shapes is to standardize the bending and shape process, this is done for several reasons, firstly this is done so that the…
3 pages (753 words)
CTV Building
The report produced by the Royal Commission had also officially identified the key players after the disaster. This report aims to evaluate the faults on the part of the key players and stakeholders leading to technical deficiencies in the design of the building. Gerald Shirtcliff was the CTV building’s site manager and he was later found to have faked his qualifications and therefore was not up…
11 pages (2761 words)
The Canterbury Television (CTV) Building-Case Analysis
Most of the earthquakes witnessed in recent times have had devastating effects. Therefore, architects are advised to ensure that modern buildings meet the building standards capable of withstanding seismic waves of reasonably high magnitude. New Zealand is one of the European countries that have suffered from a series of earthquakes in the recent past. One such earthquake occurred on 22 February…
6 pages (1506 words)
Collapse of CTV Building
The governments of several countries are motivating the organizations to follow proper business policies in order to improve countries’ business environment. This study will focus on the collapse of CTV building during the 2011 Christchurch earthquake. The study will try to find out several other reasons behind the collapse of this building. Collapse of CTV Building Introduction CTV Building was…
10 pages (2510 words)
The Canterbury Television (CTV) Building Incident-Case Analysis
One such earthquake occurred on 22nd February 2011 in New Zealand causing 184 deaths with property worth billions of dollars being destroyed. This happened when an earthquake measuring 6.3 on the Richter scale hit Christchurch. The fact that only the Canterbury Television (CTV) Building collapsed following the earthquake have raised a lot of questions regarding the design and construction of the…
8 pages (2008 words)
CTV Building Collapse: Case Report
A number of investigations were carried out to figure out the causes of the building collapse and all the investigation reports pointed to poor building design and construction operations. The principal engineer Alan Reay employed an inexperienced engineer (David Harding) for the building design. In addition, Reay did not supervise the operations of Harding and hence many potential defects in the…
8 pages (2008 words)
CTV Building in Christchurch
This paper approves that it is clear from the above discussion that the CTV building collapsed due to the inadequate quality of the structure and design. Moreover, several issues such as lack of an effective decision making process, poor supervision processes and unethical business and operation practices are responsible for this collapse. After the 2010 earthquake government of New Zealand…