Report of the Field Week at Wiston

Surveys are very important while carrying out all types of construction and land planning. The various applications of surveys include the plotting of a land and marking of boundaries for planning and ownership purposes, the correct orientation of the building, the leveling of an unduly ground surface, for setting out gradient of a road or field, for marking the center line of the roads, railways and transmission lines, for setting out horizontal as well as vertical curves for various purpose etc. So surveying can be deemed of as the very first step of any type of construction work and it also defines the accuracy of the construction (Schofield and Breach, 2007). Incorrect surveys lead to various complications during the construction because the project drawings are made according to the surveys carried out. Moreover surveys are also very important in the economics of a project because the estimates of a project are based on the drawings prepared through surveying. ...
Download paper
Not exactly what you need?

Related Essays

Selected Engineering Field Research Paper
This is achieved by providing solutions for both consumer and commercial applications. Civil engineering is one of the oldest fields in engineering that arose out of the many challenges that humanity experienced in the early days. Civil engineers are concerned with overseeing the construction of tunnels, roads, bridges, airports and many other infrastructures. In the course of their job, civil engineers take account of several factors just to ensure that the final product meets the standards expected. This is done taking account of the fact that the products are normally expected to last for…
5 pages (1255 words)
Selected Engineering Field Research Paper
Engineering has over time evolved to be a broad field with very many specializations each concerned with different aspects of human life. Engineering is certainly the link between the theoretical science that man learns and discovers daily and the commercial applications of such discoveries. Great advances in engineering have certainly continued to be the order of the day as man grapples with a myriad challenges amidst increasingly diminishing resources and the growing need to make life simpler for humanity. Without doubt, great milestones have been undertaken but the motivation continues to…
5 pages (1255 words)
Heat Exchanger (HVAC field)
Examples of heat exchangers are; intercoolers, preheaters, oil coolers of heat engine, condensers, and evaporators in refrigeration units.Various types of heat exchangers have been developed to meet the widely varying applications and are classified according to; nature of heat exchange process, physical state of fluid, constructional and design specs and relative direction of fluid flow. According to the nature of the heat exchange process, heat exchangers are classified as; direct and indirect contact heat exchangers. Plate and shell heat exchanger, combines both the plate heat exchangers…
report 1
This plot is known as the grain distribution plot and will be used for purposes of this report. More often, a relatively distributed curve shows well graded or a soil which is poorly sorted whilst an extremely steep distribution curve, a curve with steep distribution shows poor grade or sufficiently sorted soil. Objectives of the experiment This lab was developed to determine the distribution of grain size for Concrete & Asphalt materials. This is achieved by determination of the coefficient of uniformity, as well as the coefficient of curvature, . These describe general slope and shape of the…
3 pages (753 words)
Report
However some technical problems such as weight of the arm and unforeseen parameters of the robot going out of the maze were encountered in execution of the project. The objective of the project is to enable a robot to look for a ball and pick it up while avoiding black lines. The goal is divided into a logical sequence that enables the robot to achieve its goal. The sequence flow is as follows. The necessary parameters for the robot are set, these include the sensors and motors that enable the robot to move. The robot then looks for a ball. It then estimates and determines the distance to the…
6 pages (1506 words)
Lean concept in manufacturing field
With the failure of MRP to offer enhanced system performance, the shift has focused to Just-in-time production systems which are driven by customer demand Hence, the jobs are “pulled through the system” with linkage between stages in the production process (Deleersnyder, et al., 1989). The Japanese system of Kanban is required in order to physically implement the pull production system. Kanban is often used in conjunction with Just-in-Time production whereby the right quantity must be manufactured at the appropriate level and at the right time. Literally translated as “a card”, the…
6 pages (1506 words)
Gullfaks Oil field
Oil exploration in the location where Gullfaks main field occupies started after the discovery of Brent Field in 1971. Hence, revealing the prospects of occurrence of Middle Jurassic Brent group sentiments, which are significant and highly rich hydrocarbon reservoirs. The first licensing that saw inception of drilling was in 1978 whereby the first well (34/10-1) managed to go through Jurassic section and encountered approximately 160 m width of oil-filled Brent sandstones region. This comprised of a column, which extends to the basement of Brent Group. Other four wells that followed the…
23 pages (5773 words)