Procurement & Contracts Coursework

57). One of the key attributes of PPP is that it not only facilitates public-private partnerships during the construction phase, but it provides for post-construction services to be managed by a private agency. It has been argued that by taking this approach, the construction design is usually conducted contemplating subsequent services which ultimately lowers the cost of services. Moreover, the nature and duration of the PPP encourages a relationship of trust and facilitates the free flow of information (Hoppe & Schmitz, 2013). Likewise, Private Finance Initiative (PFI), project procurement, a form of PPP, is particularly important when the public budget is constrained by economic difficulties such as the current economic downturn. PFI is a method by which the public sector secures “value for money” and the private sector “service provider” assumes the risks associated with the project (Akintoye, Hardcastle, Beck, Chinyio, & Asenova, 2003, p. 461). Given that the global economic downturn has impacted the UK government’s ability to deliver and meet the demands for health services, a PFI-PPP procurement route is the more innovative and least costly option over traditional procurement routes. ...Show more

Summary

Procurement and NEC3 ECC Contract By Course Institution Date Task A: Procurement Report to the Ministry of Health, UK RE: Proposal for a PPP-PFI Procurement Route for the Hospital Expansion Project Date: Introduction Public-Private Partnerships (PPP) differ from conventional procurement routes…
Author : rodriguezlane
Save Your Time for More Important Things
Let us write a custom assignment on your topic
"Procurement & Contracts Coursework"
with a personal 20% discount.
Find out more

Related Essays

Baytree Procurement for MSA Project
These are part of the built environment that plays a key role in ensuring the safety and comfort of roads and highways users. Developers play a key role in the process. They design and build these facilities in conjunction with customers, communities, government agencies, rules and regulations, among others.
23 pages (5750 words) Essay
Byetree procurement strategy
Practically, MSA provides a safety function most especially for the drivers to stretch and relax their stressed muscles due to driving for at least 20 minutes for every two hours travel (Highways Agency, 2012). In the past few decades, it has been observed that most MSAs were put up only to provide the basic needs of motorist which are food, toilet/wash, and fuel, without much concern on the surrounding environment.
22 pages (5500 words) Essay
Procurement
The Procurement Law of 2006 was the government’s response to Sir Latham’s report that was published in 1994 and Sir Egan’s Report that was in itself published in 1998. The Procurement Law of 2006 was designed to prevent the occurrence of a pre-Latham and Egan report state of the construction industry in the United Kingdom.
10 pages (2500 words) Coursework
Contracts
The combination of the two frameworks shall be the recommended convergence of two frameworks designed at completing projects. AOS Development is a national housing development company in Edinburgh and has embarked on eighty housing units developments in Skye, Scotland.
12 pages (3000 words) Coursework
Materials and Corrosion
Very often corrosion results in the formation of oxides and salts and the overall physical properties of the materials affected by corrosion are changed rendering the material useless in most of the cases. The major types of corrosion are discussed in the following paragraphs.
7 pages (1750 words) Essay
Engineering - Construction Procurement
The Parish Council own the site, formerly a garage located adjacent to the village green in a conservation area. The Council has narrowed the choice of procurement down to traditional or design and build. Task Discuss the two alternative procurement routes, explaining their characteristics and relative advantages and disadvantages.
5 pages (1250 words) Essay
coursework 2
Acting on behalf of the employer, the administrator coordinates all the activities contained within the contract to ensure their successful and practical implementation (Ashworth 2006). Consequently, there are various activities that must be coordinated with the key concerns being cost and time.
5 pages (1250 words) Essay
NEC ECC Contracts
NEC ECC Contracts Project Under Consideration. This is a project concerning a 100 million ? Postgraduate Student Accommodation and Outreach Center Project in Malaysia. The project provides accommodations for 2100 postgraduate students, along with teaching activities and a continuous professional development course.
12 pages (3000 words) Assignment
Research Methods For Engineers (Factors Affecting Project Alliances in Construction Industry ((Australian Construction Industry ))))
There was little consultation and involvement of all stakeholders in any major construction project. This resulted in continuous conflicts and court battles designed to solve the perceived conflicts. To some point, these factors
15 pages (3750 words) Research Proposal
Marking Machine / Fluid Power Lab
When the cylinder finally reaches the forward end position, it activates switch 3 and air fills the valves and the adjusted time is elapsed. Valve 2 then passes the pressure signal to port 12 on valve 3 which then
1 pages (250 words) Lab Report
Find out how much would it cost
to get a custom paper written by a pro under your requirements!
Win a special DISCOUNT!
Put in your e-mail and click the button with your lucky finger
Your email
YOUR PRIZE:
Apply my DISCOUNT