Construction Site Report The construction site that we visited was a Chinese Restaurant called Chilli Secret located on 9021 Leslie Street, unit 9, Richmondhill. The restaurant was undergoing renovation and revamping. Part of the work that was to be done within the restaurant was installing new fixtures and replacing the old furniture with a new set…

Extract of sample
Site study report

The company subcontracted to supply furniture was a Chinese firm called xxxx. We got to learn that the main reason the owner of the restaurant wanted it renovated and refurbished was so that it would look more attractive to customers. According to the owner of the restaurant, the restaurant looked dull, the floor looked old, the furniture were outdated and did not afford customers the kind of comfort that they deserved. By changing the outlook of the restaurant, it would look like it has been rebranded without having to change its name. The plan that had been developed by the construction company for the renovation of the site was a 2-D drawing made to scale. The floor plan outlined the arrangement of the restaurant in terms of furniture, and fixtures. It was quite evident that the new arrangement of the restaurant would be significantly different from the old one. Apart from the floor plan, the company had a 3-D model of what the restaurant would look like once it was completed and fully furnished. Instead of the old blue color, the restaurant would have a bright pinkish color. The floor would be finished using floor differently colored tiles in replacement of the concrete floor. According to the 3-D plan, the restaurant would have a reflected ceiling and that would host several colored lights. ...
Download paper

Related Essays

Advising the client,site and location analysis
While the initial construction of factories was solely based on their functionality as a mechanism for the mass production of goods, giving little consideration to the environmental or social ramifications of its existence, the architects of the MAS Intimates facility sought to counteract this trend by creating a structure that would allow every occupant to enjoy the fresh air, natural light, comfortable surroundings, and beautiful outdoor views of intact natural settings within their work environment (Holcim, 2008). Such considerations have allowed MAS Intimates to surpass the traditional…
9 pages (2259 words)
The durability of concrete
This research will begin with the definition of concrete, as a construction material. Concrete is a basic construction material, it is made of mainly four constituents, cement, fine aggregate(sand), coarse aggregate and water. With the addition of water to the cement and other components in dry form, this addition of water makes the concrete fluid and this flow able mixture enables us to pore in the desired shape and size which is dictated by the moulds and formwork. During this the water chemically bonds with the cement and hydration takes place. The ultimate strength of concrete is a factor…
12 pages (3012 words)
Personal health and safety at the construction site
A high level of risk is inherent in the construction work. The heavy equipment, channels of electric supplies, and mechanical operations all make construction work very risky from the point of view of safety. Almost a third of all fatalities in the construction projects happen during the execution of a project (hes.gov.uk, n.d.). If the CDM coordination is not done appropriately, the finished structure might be unsafe for use and maintenance, and lack its potential to deliver good value for investment to the client. Ideally, the CDM coordinator is appointed while the project is in its…
10 pages (2510 words)
Site Management and Safety
Construction workers often fall from height and lose their life, this is also the leading safety hazard, it is the duty of the architect, client, engineer, site manager and quantity surveyor to ensure that there is proper harness in place, it should be checked properly so that such fatalities can be avoided. Motor vehicle crash is another very dangerous construction site hazard, this can be avoided by following the paths laid in the beginning of the project, the architect is responsible for doing that. Everyone involved on a construction site must ensure that they wear their protective…
4 pages (1004 words)
Site Management and Engineering
For further safety of the site, an additional gate is placed just in front of the construction area, this is for occasional use. For instance movement of formwork when it is no longer required, this will not disrupt the movement at the entrance and in movement corridors, further making the site safe. The plant area is kept just in front of the construction area, as it will avoid to and fro movement of materials to construction site and save money, manpower and time. The junk area and storage area is kept at the corner end, this place will have minimum disturbance to corridor movement, will be…
6 pages (1506 words)
Report
However some technical problems such as weight of the arm and unforeseen parameters of the robot going out of the maze were encountered in execution of the project. The objective of the project is to enable a robot to look for a ball and pick it up while avoiding black lines. The goal is divided into a logical sequence that enables the robot to achieve its goal. The sequence flow is as follows. The necessary parameters for the robot are set, these include the sensors and motors that enable the robot to move. The robot then looks for a ball. It then estimates and determines the distance to the…
6 pages (1506 words)
Site layout on a confined site
The problem comes in the implementation. It is less often technical difficulties that delay a project, the project manager must know his business, and hire crews that understand the mechanics of their individual specialties. The problem often arises in the organization. In many cases, it is managerial issues that trigger challenges at the construction site more than some sort of technical failure. If management is the problem, then a novel strategy becomes the most probable solution. There are a wide range of problems and challenges that can afflict the construction site; these issues - in…
8 pages (2008 words)