Report on the Perceived Advantages and Disadvantages of Building a Theme Park in a Neighbourhood - Essay Example

Only on StudentShare
Author : msawayn

Summary

Report on the Perceived Advantages and Disadvantages of Building a Theme Park in a Neighborhood By Your name Subject Tutor name University Date Report on the Perceived Advantages and Disadvantages of Building a Theme Park in a Neighborhood Introduction This report provides an in-depth analysis of the perceived advantages and disadvantages of building a theme park in a neighborhood based on the responses obtained through a structured, non-disguised and closed-ended questionnaire…

Extract of sample
Report on the Perceived Advantages and Disadvantages of Building a Theme Park in a Neighbourhood

It also assesses the expectations, both positive and negative, of the neighborhood residents from the theme park to be constructed. Methodology This study is based on a close-ended, structured and non-disguised questionnaire designed to explore the perceived effect on local residents by the building of a local theme park. The questionnaire was given to the oldest member of each household to be completed and returned within a month. The respondents were informed about the purpose of the questionnaire, and that their responses were vital for planning the construction. Respondents were assured of the maintenance of confidentiality of the information they would provide and that it would be used solely for the purpose of this survey. The questionnaire had questions relating to the demographic data, such as gender, employment status and type of household of the residents. ...
Download paper

Related Essays

Sustainable building
Center of discussion in this paper is sustainable building as the one that has higher energy efficiency, does not or less produces or less contribute in producing the green house gases emissions and the building that makes no burden to the ecology and environment. The construction of such a building is practically possible by making smaller changes to the way we live and construct our houses. Sustainable building utilized the sustainable materials that are renewable. Moreover a structure that utilizes less resources and utilizes the sustainable resources like solar, wind, geothermal, etc to…
15 pages (3765 words)
Construction in Dubai
This paper illustrates that regardless of the dangers that await the working sector, the construction business is considered to be the backbone of Dubai's flourishing economy. Dubai has gathered much attention in recent years with their fascinating and innovative building ideas and architectural wonders, like the Dubai Skyline and the Burj al Arab, among others. Real estate and construction( 22.6%) are the largest contributors to Dubai's economy, and are considered amongst one of the key sources of employment, income and growth. Before jumping into attempting this building survey, we first…
10 pages (2510 words)
Advantages and Disadvantages of Design Build Project Delivery Method
It can be observed that convectional methods of project delivery have given way to more creative methods, and this has been done so to save time, save money, and to provide a more coordinated team approach with objective of reducing litigation. Each project delivery method has benefits as well as its own limitations. Design-built project delivery method constitutes one of the modern popular project construction methods (Darren, Pramen, Fasce & Masce 579). The premise of this method is that the owner hires one entity, which is a design-builder, and this design entity becomes the sole provider…
4 pages (1004 words)
Design-build and Design-Bid-Build Contracts: Their Advantages and Disadvantages
The design-build and design-bid-build are the two forms of contracting in this regard that are most commonly considered while planning for a construction project. While the design-build is a traditional method, the other is an alternative form of contracting involving greater complicacies. Also, these two systems have their respective advantages and disadvantages that can significantly affect the effective completion and quality of work. This particular study thus considers the concept of these two contracting systems and discusses about the advantages and disadvantages of both the systems of…
11 pages (2761 words)
Report On Building and Programming a LEGO Mindstorm Robot
The very first Mindstorms Robotic invention Kit comprised of two motors, two touches of sensors and a single light sensor, and yet performed well, although many improvements made on the kit comprises a number of parts. There has been an increase in the uses of these robots in daily lives (Costlow 47). In fact, engineers use these models to build a model of an embedded system with computer controlled electromechanical parts. In reality, various real life systems have borrowed a lot from these robotic models by embedding them in different systems such as elevators and industrial robots.…
CTV Building
The report produced by the Royal Commission had also officially identified the key players after the disaster. This report aims to evaluate the faults on the part of the key players and stakeholders leading to technical deficiencies in the design of the building. Gerald Shirtcliff was the CTV building’s site manager and he was later found to have faked his qualifications and therefore was not up to the mark. The head of the consultation firm, ARCL, Alan Reay was said to be “ultimately responsible” even though his designer and engineer David Harding was inexperienced in working with…
11 pages (2761 words)
CTV Building Collapse: Case Report
A number of investigations were carried out to figure out the causes of the building collapse and all the investigation reports pointed to poor building design and construction operations. The principal engineer Alan Reay employed an inexperienced engineer (David Harding) for the building design. In addition, Reay did not supervise the operations of Harding and hence many potential defects in the construction process had gone unidentified. To worsen the problem, the construction manager failed to properly guide the building’s foreman. The Christchurch City Council issued a permit for this…
8 pages (2008 words)