Significance of Stakeholder Management in Construction Projects

Significance of Stakeholder Management in Construction Projects Dissertation example
Masters
Dissertation
Engineering and Construction
Pages 60 (15060 words)
Download 0
A SYSTEMATIC STAKEHOLDER MANAGEMENT APPROACH IN AVIATION CONSTRUCTION PROJECTS AUTHOR NAME A dissertation submitted in partial fulfillment of the requirements for the degree of MSc Construction Project Management School of the Built Environment Heriot-Watt University Edinburgh February 2012 DECLARATION I XYZ , confirm that this work submitted for assessment is my own and is expressed in my own words…

Introduction

Any uses made within it of the works of other authors in any form (e.g. ideas, equations, figures, text, tables, programmes) are properly acknowledged at the point of their use. A full list of the references employed has been included. Signatures Date: February, 2012 TABLE OF CONTENTS List of Tables List of Figures Acknowledgement Abstract Chapter 1: Introduction 1.1 Background/Rationale 1.2 Research Aim and Objectives 1.3 Research Scope 1.3.1 Sector Selection 1.3.2 Geographic Region 1.4 Research Hypothesis 1.5 Outline Research Methods 1.6 Research Structure Chapter 2: Literature Review 2.1 Introduction 2.1.1 Nature of Aviation Industry 2.1.2 Construction in Aviation 2.2. ...
Download paper
Not exactly what you need?

Related papers

BIM in Construction and Knowledge Management within Dubai
Any uses made within it of the works of other authors in any form (e.g. ideas, equations, figures, text, tables, programmes) are properly acknowledged at the point of their use. A full list of the references employed has been included.
Need to Get Topic and Proposal for a Dissertation for Msc Construction Project Management
Generally, there are five key stakeholders in every project: project manager, performing organization, team members, sponsor and end user. However, geographical differences and natural events directly affect the successful execution of the construction project and may involve a number of unique stakeholders like environmental and community groups being effected by the building process or its…
Egan's Justification for Recommending Health and Safety Improvements in Construction Industry
This clearly shows that the service provided in this sector is poor. Improvements in the health and safety construction sector, guarantee clients the best services, and it is obvious that the profit made will be up the scale. Egan argued that for the health, and safety construction sector to achieve its full potential, there was need for only people who are qualified to be employed. If the new…
Scheduling Management in Tunnel Construction Projects
45). Scheduling management Scheduling management is very important to any project because it entails helpful techniques applicable while managing activities involved in projects. Managers practice scheduling management before starting up a project, which involves. Pointing out the task that interests an individual, estimating the total period that the task will take, and distributing resources…
Construction Management
Different sizes of projects require different services, and so before one makes a decision on the system to use to require the services, size is one of the basic things to consider. This report is about the construction project that we undertook. Being the four of us, each member was given a different role and each member had to closely work together with the other members of the group in order to…
Construction Project Management (International projects. An analysis of about six construction projects which take place in two
Otherwise chances are high that if only the typical constrains of project management are considered, projects may not meet they objectives with these constrains. The problem becomes worse when a project is jointly undertaken by two nations. The purpose of this paper, therefore, is to analyze not more than six construction projects undertaken in two nations in order to identify factors that may be…
construction management
The schedule may specify the specific roles for the unskilled and skilled. For instance, starting time can be set at 7am and ending at 5pm. Similarly, construction manager is required to consider the pay rate of overtime schedule. The major role of the unskilled workers involves preparation of construction material mix, timely. The superintendent is responsible in carrying out the activities as…