The building is located in a town center. 1.2 LIMITATIONS Limitations applied to the document are: No consideration for a detailed requirement for the Australian standards Construction safety act have not been looked at A complete architectural design for the structure not available and The provisions made for the disabled. 1.3 DESIGN DOCUMENTATION The report is based on the design brief and the set of preliminary drawings. Drawing1 Building illustration Drawing 2 Front Elevation of completed structure Drawing 3 Ground floor plan Drawing 4 Basement plan PART 2 BUILDING CHARACTERISTICS BCA Classification Class 7a: Car park and warehouse CLASS 7b: for storage, or display of goods or produce for sale by wholesale. Rise in Storey Five(5) Type of Construction Type A Effective Height Less than 25 meters. Fire Compartment Size Floor Area: 3600 square meters Volume: does not exceed the minimum stated in BCA PART 3: BCA ASSESSMENT 3.1 METHODOLODY The design provided is to be audited against the Deemed-to- Satisfy Provisions of the Building Code of Australia, 2010(BCA). The areas discussed have been assessed to meet the performance based solutions: 3.2.0 Fire Resistance For fire stability of the structure, the BCA requires its resistance and stability, the compartments and modes of separation as well as the allowances made for protection against fire. 3.2.1 Fire Resistance and Stability The structure constructed should remain stable during fire to allow evacuation. Its elements should resist any spread of fire. This must comply with the purpose of the structure, intensity of the fire, the fire systems in place, size of the fire compartment and any interventions made by the fire brigade. The material used for the building must limit smoke produced when the building is burning. The fumes produced should not be toxic so as to allow the occupants to evacuate the building. 3.2.2 Compartment and Separation The floor area should be greater than the atria. An open area should be available near the building. This is to be used for evacuation purposes, access by the fire fighting vehicles and free from any kind of storage with exceptions for electricity substation and a pump house. A fire wall constructed must meet the FRL requirements. The materials used should not easily collapse from the heat caused by fire. Since the lift will connect to more than two levels, it should be separated from the structure. 3.2.3 Protection of Openings(BCA VOL 1 195) The building should have a minimum of two exits with a direct access to a road or an open arena. The open space should be within the structure, be accessible and not used as a storage facility. The access road must be free from any obstruction for emergency vehicles, enable pedestrians to easily move between the building and the access road. The maximum area for atria is 5000 square meters. Wall openings should be protected by automatic doorways and windows. Elements of the structure should not allow fire to reach the exit, public corridors, and adjacent buildings. Heat and smoke that arise during fire should be limited to allow the time needed to exit the building, the purpose of the structure, and access to fire systems placed in the structure. 3.3.0 Accessibility and Egress The BCA requirements for access and egress look at the provisions made for escape exits to be constructed and considerations made for the disabled. 3.3.1 Provisions for Escape (BCA VOL 1 153) In general, not less than two exits must be ...Show more

Summary

Name: Instructor: Course: Date: BCA Compliance PART 1 BASIS OF ASSESSMENT 1.0 INTRODUCTION The purpose of this assessment is to audit the design of the building before costing to meet the BCA requirements. The building is to be used for commercial purposes located in a town center and should meet the BCA Vol…
Author : heidenreichkyli
BCA Compliance Engineering and Construction Essay essay example
Read Text Preview
Save Your Time for More Important Things
Let us write or edit the assignment on your topic
"BCA Compliance Engineering and Construction Essay"
with a personal 20% discount.
Grab the best paper

Check these samples - they also fit your topic

An organizational structure of an engineering and construction company
The report will cover the following: company structure; activities of each department; how the business will operate; business registration and licensing; contracts; taxation and capital purchases; occupational health and safety; environmental issues; administrative systems: OHS and worker cover; noise abatement; working hours; taxation; insurances and trading practices.
11 pages (2750 words) Assignment
Civil Engineering Construction
Types of bridges The early form of bridges were the beam bridges, arch bridges and the suspension bridges all constructed from natural resources like wood, vines and fallen tree trunks. (Hill James et al, n.d ) The modern day bridges essentially consist of a combination of all the three bridges but to a more refined scale using materials like steel and concrete.
10 pages (2500 words) Assignment
BCA Compliance for a Typical Location Requirements
When structures fail, they pose great danger to the lives of people, the property in and surrounding the structure and the available amenities. The main objectives of the BCA compliance are to protect people as well as property prone to loss due to structure failures.
6 pages (1500 words) Assignment
Construction Engineering
The duration taken for a constructed facility to get through the different stages, starting with the planning and ending with the disposal stage is the life cycle of the given facility. In the case of many construction facilities, they are designed to give service for a certain number of years – on the minimum, starting from 30 to 100 years and beyond.
7 pages (1750 words) Assignment
Construction Engineering
Designing a hospital in a major city of Canada is a great challenge for design firm. Designed hospitals must be safe seismically and also have advanced technological facilities incorporated under a single roof. Newly designed hospitals should also implement energy efficient techniques in order to make green building.
7 pages (1750 words) Assignment
Construction Engineering
). For calculating the operational feasibility of thermal power plant, following steps will be followed: Uninterruptable supply of fuel to the facility Capable of bearing the entire load for which it is being design. Must not be far away from the market so that if any part needs to be replaced urgently it can be carried out without shutting off the plant for longer times.
6 pages (1500 words) Assignment
Construction Engineering
The code of ethics training ensures that particular principles and guidelines govern the day-to-day activities of engineers. As a result, all the stakeholders in a project or construction program are satisfied with the services and products offered by engineers.
6 pages (1500 words) Assignment
Civil Engineering Construction
In fact, it is a device to transmit the load of the structure to the soil below. Foundation is provided for the following main purposes- Depending on the type of structure and the soil conditions prevalent, different types of foundations such as Strip Footing, Spread or Isolated Footing, Combined Footing, Strap or Cantilever Footing, Raft Foundation, Pile Foundation, Drilled Piers, Caisson, Well Foundation may be provided.
12 pages (3000 words) Assignment
Value and Risk Management - MSc Civil Engineering and Construction Management
We could not but consent to this request as we knew the importance of such a project, considering that we have initiated a brief visit to the site and scanned a few
14 pages (3500 words) Assignment
BCA Compliance for atypical location requirements
The main objectives of the BCA compliance are to protect people as well as property prone to loss due to structure failures. Under the category of functional statement, the load bearing capacity of the structure and any other factor that may expose the
6 pages (1500 words) Assignment
Hire a pro to write
a paper under your requirements!
Win a special DISCOUNT!
Put in your e-mail and click the button with your lucky finger
Your email
YOUR PRIZE:
Apply my DISCOUNT
Comments (0)
Click to create a comment