Name: Instructor: Course: Date: BCA Compliance PART 1 BASIS OF ASSESSMENT 1.0 INTRODUCTION The purpose of this assessment is to audit the design of the building before costing to meet the BCA requirements. The building is to be used for commercial purposes located in a town center and should meet the BCA Vol…

Extract of sample
BCA Compliance Engineering and Construction Essay

The building is located in a town center. 1.2 LIMITATIONS Limitations applied to the document are: No consideration for a detailed requirement for the Australian standards Construction safety act have not been looked at A complete architectural design for the structure not available and The provisions made for the disabled. 1.3 DESIGN DOCUMENTATION The report is based on the design brief and the set of preliminary drawings. Drawing1 Building illustration Drawing 2 Front Elevation of completed structure Drawing 3 Ground floor plan Drawing 4 Basement plan PART 2 BUILDING CHARACTERISTICS BCA Classification Class 7a: Car park and warehouse CLASS 7b: for storage, or display of goods or produce for sale by wholesale. Rise in Storey Five(5) Type of Construction Type A Effective Height Less than 25 meters. Fire Compartment Size Floor Area: 3600 square meters Volume: does not exceed the minimum stated in BCA PART 3: BCA ASSESSMENT 3.1 METHODOLODY The design provided is to be audited against the Deemed-to- Satisfy Provisions of the Building Code of Australia, 2010(BCA). The areas discussed have been assessed to meet the performance based solutions: 3.2.0 Fire Resistance For fire stability of the structure, the BCA requires its resistance and stability, the compartments and modes of separation as well as the allowances made for protection against fire. ...
Download paper
Not exactly what you need?

Related Essays

BCA Compliance for a Typical Location Requirements
Under the category of functional statement, the load bearing capacity of the structure and any other factor that may expose the structure into extra pressures are taken into consideration during the design and construction processes. The sustainability, quality and durability of the structure need to be considered. The structure should be in a position to meet the required standards in relation to the location that it is situated. The ability of the building to withstand harsh conditions, withstand frequent harsh conditions without failure are vital to its performance characteristics. The…
6 pages (1506 words)
Engineering - Construction Procurement
Provide a reasoned recommendation based on your discussion. Introduction Understanding of procurement paths has led to analysis of traditional procurement route and development of other routes. With a variety of procurement routes available, clients have to critically analyse the best available option. There are different approaches to procuring projects. These approaches are complicated since they lack clarity and particular description of particular procurement routes. The common types of procurement routes available are; 1. Traditional arrangement, 2. Design and build, 3. Measurement, 4.…
5 pages (1255 words)
TMA T173 03 Engineering and Construction Essay
b. i. In your own words, give a brief description of what the standard covers. Standard is a measure of assurance to any specific area of application. It covers a number of elements such as uniformity, specialization, purpose, precision and accuracy. Uniformity of standard is a frame of reference that the users of a given object can agree to follow regarding the manufacturing and usage of that particular design as well as the object material (Callister, 2004, p. 503). Uniformity regards the conformity of products regarding their physical and chemical nature. Specialization involves the product…
3 pages (753 words)
Construction Engineering
When the constructed facility is offered proper management and maintenance, the facility may last 100 years or more; the facility is also capable of serving different functions within the specified time. The actual lifetime of a property is dependent on a number of factors, including the quality of design, the durability of the materials used for the construction, the quality of the facility and the technology used (Edwards, Bartlett and Dickie 2-7). Other factors determining the lifetime of the facility include the local climate and the location, extent of use and the damage caused by human…
7 pages (1757 words)
Construction Engineering
Following are the steps involved in designing new hospitals in Canada(Martin). First and foremost step is designing the patient care areas which may either be for a single patient or for multiple patients. These areas are designed for proper HVAC conditions so that least energy is consumed to maintain required environmental parameters. These areas are usually provided with a window or wall that is directly exposed to harsh weather conditions. Therefore, proper supply and exhaust outlets are provided in order to provide isolation from air borne infections. Rooms being designed for patients with…
7 pages (1757 words)
Construction Engineering
Whether or not a power plant can be built on a specific location is determine by carrying out technical surveys based on following recommendations. Supply of raw material to the place is convenient .i.e. the construction site is provided by roads to transport goods to that part of the area. Must have ample space to accommodate construction machinery. Must have proper area for dumping mud extracted from the construction site. Quebec is rich in places that are suitable for the construction of power plant. For the construction of such a facility in Quebec, following considerations are followed.…
6 pages (1506 words)
Construction Engineering
The essential ethics topics for training in construction industry include; a. The interest of stakeholders: The purpose of the project must meet the demands of the stakeholders in the project. Therefore, professionals are required to understand the need of the stakeholders and work towards their satisfaction. b. Conflict of interest: The decisions made must be professional and business oriented at the interest of the employer or profession. Any relationship that may be perceived to impair a project’s objectives must be checked. c. Compliance to legal issues: The actions of engineers must…