Cost-Benefit Analysis of A Public Infrastructure Project - Assignment Example

Cite this document
Summary
Contents Contents 1 Cost-Benefit Analysis of a Public Infrastructure Project 2 1.0 Introduction 2 1.1Project description 3 1.2 Cost Identification 6 1.3Quantitative Benefits 6 1.4 Cost benefit analyses 6 1.5 Conclusion 8 References 10 Name Tutor Task Date Cost-Benefit Analysis of a Public Infrastructure Project 1.0 Introduction Infrastructure is a term used to describe an underlying foundation that is useful in the provision services and goods to enhance community continuance and growth…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER99% of users find it useful
Cost-Benefit Analysis of A Public Infrastructure Project
Read Text Preview

Extract of sample "Cost-Benefit Analysis of A Public Infrastructure Project"

Download file to see previous pages

Thus, to come up with a public infrastructure, several factors will be considered to look at both the advantage and causality in order to achieve the optimal benefit that is required. Public infrastructure is considered to be of good interest to the society if its final outcome benefits surpass the cost of implementing the total project. If the cost of implementing the infrastructure is more than the benefit the society is supposed to enjoy after its completion, then, the project is of no much benefit to the society.

To realize the cost benefit of a public infrastructure, a cost benefit analyses is carried out to investigate the benefit the society is expected to achieve once the said infrastructure is completed. If the result shows that the project has a positive benefit, then, the infrastructure should be implemented. If the result on the other side reveals that the benefits of the project upon completion reflect negative benefit, then, the project should be dropped (Campbell and Brown, 15). 1.1Project description The public infrastructure that is illustrated under this paper is of power plant construction nature which is located in Middle East and North African region.

This region has a high potential of solar and wind energy because it receives a lot of energy from sun in six hours than what a man consumes in one year and is home to top sites of wind potential. This project is expected to generate electricity by use of massive set up of solar and wind farms networks and connect the power to Europe through a Europe- Mediterranean electricity network. A high voltage direct current (HDVC) transmission cables will be used in the transmission of the power. The power plant will involve spreading of concentrating solar power systems, wind parks and photovoltaic systems in desert of North Africa in places like Sahara desert.

This means that the power plant will produce energy that is renewable instead of use of fossil fuel that is not renewable. This project will provide a substantial demand of electricity in Middle East and Northern Africa region and a 15% of electricity need in Europe. Thus, due to the fact that this project is expected to benefit those three regions, it has being dubbed as EUMENA which means European Union, Middle East and Northern Africa. Investment under this public infrastructure is expected to cost up to 400 billion pounds by 2050.

Under this project, Europe is expected to lead in fighting climate change and economies of the Northern African countries and Europe, grow due to green house gas emissions limitation. This project has the potential to satisfy 15 percent of the electricity demand in Europe and much needed electricity in Middle East and North Africa. 240,000 jobs in Germany are likely to be created if this project is implemented and generate electricity worth 2 trillion by 2050. Energy wastage is expected to be reduced under this project because it will enable transfer of energy from areas with surplus to areas it is needed.

The grid will help in taking advantage of the large amounts of energy that is likely to be sourced from large scale sources of renewable energy that are remote. The construction of the transmission grid will reduce difference between actual generating capacity and the minimum

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Cost-Benefit Analysis of A Public Infrastructure Project Assignment”, n.d.)
Retrieved from https://studentshare.org/engineering-and-construction/1454437-cost-benefit-analysis-of-a-public-infrastructure
(Cost-Benefit Analysis of A Public Infrastructure Project Assignment)
https://studentshare.org/engineering-and-construction/1454437-cost-benefit-analysis-of-a-public-infrastructure.
“Cost-Benefit Analysis of A Public Infrastructure Project Assignment”, n.d. https://studentshare.org/engineering-and-construction/1454437-cost-benefit-analysis-of-a-public-infrastructure.
  • Cited: 0 times

CHECK THESE SAMPLES OF Cost-Benefit Analysis of A Public Infrastructure Project

Illiquidity Premiums Market Analysis

by the analysis of two events involving bond buyers?... Within the stock/bond markets, illiquidity is thought as the cost of a buyer's remorse; it can be interpreted as the cost of reversing an asset into cash immediately after the trade has been made.... Thus, illiquidity is defined with the consideration that all assets are… A simplistic view of firms is that publicly traded firms are liquid while non-publicly traded firms are not....
7 Pages (1750 words) Statistics Project

Transparency in the Cost of Justice

This study contains an analysis of data on four types of costs for four case studies based on the data acquired from 28 European countries.... The data involved comprises four types of costs in respect of four case studies for data acquired from 28 European countries.... EU seeks to establish a… n area of Justice” to facilitate the access of individuals as well as business to justice by reducing hindrances that discourage or prevent them from using their privileges....
10 Pages (2500 words) Statistics Project

Hypothesis and T-test Analysis Problem Set

The study “Hypothesis and T-test analysis Problem Set” seeks to determine if a new teaching method, the Involvement Technique is effective in teaching algebra to first graders.... Therefore, for the new methodology to be considered effective, then the students need to have more than two correct responses....
4 Pages (1000 words) Statistics Project

Case study report

A key analysis of the topic, however, indicates that there is a possibility that the introduction of the act would not only hinder the progress and development of diversity in Californian institutions, but also would primarily motivate racial profiling in the public school system....
4 Pages (1000 words) Statistics Project

Analysis of previously gathered individual presentation data

This paper uses 2000 input data set on three presentations which are “any test presentation” international business presentation and presentation on technical literature review.... The assessors in the presentation were coded such that 1 denoted male and 2 denoted female.... For… e three types of presentation, “Any test presentation” was coded as 1, Technical Literature Review was coded as 2 and presentation on International business was coded as 3....
5 Pages (1250 words) Statistics Project

Comparative Characteristic of the Demographic and Economic Factors of Germany and China

In 2012 the highest sector wise GDP growth in China The paper “Comparative Characteristic of the Demographic and Economic Factors of Germany and China" is an informative example of a statistics project on macro & microeconomics.... Elements necessary to improve output Elements to improve output are to increase GDP, lower the inflation rate, and improve infrastructure, increase in-country resources, and increase in labor productivity....
3 Pages (750 words) Statistics Project

Post-Traumatic Growth Inventory

earson correlation was adopted as the main analysis method in this study.... The following paper under the title 'Post-Traumatic Growth Inventory' gives detailed information about the data file named “911 and depression” The dataset is a part of the study conducted after the 9/11 event on a number of variables related to post-traumatic stress disorder....
5 Pages (1250 words) Statistics Project

The Effect of Public Expenditure on Income Distribution

This paper "The Effect of public Expenditure on Income Distribution" tells that the expenditures under the various head are calculated by the government on the basis of budgetary measures.... The public expenditures as committed by the governments are an essential part of the government's public policy for the development of all segments of society on an equal basis with measures for the marginalized social groups for their economic uplifts.... nbsp;Its comparison with the corresponding previous year and the proportion of each head had with overall public sector expenditure....
14 Pages (3500 words) Statistics Project
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us