Wembley Stadium – Project Management Strategic Issues - Essay Example

Ph.D.
Author : abernathyaliya
Essay
Engineering and Construction
Pages 10 (2510 words)
Download 1

Summary

Wembley stadium is the renowned name for English football. It was re-erected in the 2006 by dismantling the ancient construction in use since 1923. The project of constructing Wembley Stadium took additional 5 years than was figured out…

Extract of sample
Wembley Stadium – Project Management Strategic Issues

It increased the projected costs to more than double the earlier projections. Especial about the Wembley Stadium is its innovative steel arch that adds to the beauty of the Stadium. The steel arc also endures weight and reduces the need for internal support that could have come in the way of viewers sitting in the stadium. The load bearing feature of the arc adds decorum to the seating arrangement. The design of the Wembley Stadium unlike the Sydney Opera House or Guggenheim Bilbao was not new but nevertheless included a design element in the arch that was innovative, leaving no scope to adhere to best practice techniques such as reference class forecasting as there are no past figures to depend upon, being the novel concept. This absence of historical example is many-a-times a red flag in perfect project planning (Strategicppm, 2011).
The Wembley Stadium project was contracted to the lowest bidding company, which developed a situation similar to winner’s curse in measuring the cost of the project belligerently. Project cost hiked 36% in between the time of the bid acceptance and signing of contract (Strategicppm, 2011).
The Wembley Stadium occupies a distinct place in the event and entertainment industry worldwide and particularly in the history of the UK. The Wembley Stadium has been a host to a number of global events in the 20th century, which included a chain of leading park, theatre and funfair events the like of the 1924 British Empire Exhibition, the 1934 Empire Games, the 1948 Summer Olympics, the 1996 World Cup Finals, the 1978 Eurovision Song Contest, the 1996 European Championships and many other events organised in between (Quintain, 2004). ...
Download paper

Related Essays

Project Management
Henry Fayol significantly contributed to the development of strategic management techniques in the construction industry through establishing five functions of management. Planning was the first function of management which up to date is fundamental to the success of an organization. Cole observes that all the aspects of manufacturing depend on the initial plan to a large extent. It involves conducting an analysis of the present situation of an organization, as well as its future. After this analysis, the managers set the strategies for accomplishment of the organizational goals that are based…
13 pages (3263 words)
The role of operational management in the construction industry project
The study provides an analysis of actions to be taken by strategic project management which can enable planning and completing construction process in time and within set cost targets. A brief conclusion is provided touching on key lessons that project management can learn from experiences in the project. Szkieletor also known as Skeletor is an incomplete building in Poland. It is located in the sides of Krakow near Rondo Mogilskie. The building stays incomplete in its construction since 1975. It is one of the tallest structures around and it was intended to be headquarters of the main…
12 pages (3012 words)
Project management for a building conversion
It has been selected to be a Grade B office building. This paper seeks to present key activities involved in conversion to Grade B office integrated in the project management perspective. We will see how activities will be schedule, resource management, and quality assurance among other fundamental principles surrounding any project. PREDECESSOR ACTIVITIES The first crucial step is to seek permission from the local authority in form of an application for change of user. This will need the approval of the local authority’s plans for the area. (IEEE, 2005).That is, whether the area is official…
10 pages (2510 words)
engineering project management
A large number of employees would increase the rate at which the work will be done and increasing chances of completing the project on time (Panneerselvam & Senthilkumar 2009). The contractor may also employ other technologies and equipment instead of using manpower. The use of machines instead of humans to do certain tasks is normally advantageous since the tasks can be done at high rates there by increasing the chances of completing the project on time (Nagarajan 2007). The contractor may also divide the project into small and more manageable units, and each unit should have a goal to…
3 pages (753 words)
Project Management,
The involvement of the other tenderer that would assist to reduce the gap between the tender and the budget by offering a better solution out of experience from working with different types of tendering items. The tenderer can give directions of acquiring cheaper tools. At the same time, the tenderer can promise to offer a cheaper tender for the same contract. If there is a significant discrepancy noted between the new tenderer and the other tenders, adjustments should therefore be made to seek convenience in the contract. A notification of the tenders- This is to inform you that the scope of…
5 pages (1255 words)
Project Management Theory & Practice
Therefore, in order to come up with successful, reliable and efficient projects, project managers are required to have a keen interest in managing quality of a project and shall also consider factors influencing quality of a project (Chen, 2010; Levy, 2011). This paper includes a discussion of how various factors influence the quality management process in a project management scenario and what different alternatives for managing quality and recommendations on how further improvements in quality of a project can be attained. Quality Control / Management – Definition Quality control or…
20 pages (5020 words)
Critical approach in project risk management
As Wrona (2010, p. 1) states, “companies that do perform a risk management process on a fairly typical multi-month project (no longer than 12 months) will identify and manage possibly five to ten easily recognized project risks”. This statement shows that doing comprehensive risk analysis regularly at each stage of the project can reduce the occurrence of risks and make companies able to respond properly to any type of project risk. Risk analysis is necessary to conduct to ensure completion of construction projects within time and available budget. As Flanagan and Norman (1993, p. 45)…
16 pages (4016 words)