Engineering - Construction Procurement Essay example
Masters
Essay
Engineering and Construction
Pages 5 (1255 words)
Download 0
CONSTRUCTION PROCUREMENT By (Your Name) Presented to (Instructor/Tutor) (Course/Subject) (Institution/University) (City, State) (Date) Scenario Following a long period of fund raising, together with a number of grants from local and central government and others, Littletree Parish Council are now able to proceed with the construction of a new community centre/village hall…

Introduction

Provide a reasoned recommendation based on your discussion. Introduction Understanding of procurement paths has led to analysis of traditional procurement route and development of other routes. With a variety of procurement routes available, clients have to critically analyse the best available option. There are different approaches to procuring projects. These approaches are complicated since they lack clarity and particular description of particular procurement routes. The common types of procurement routes available are; 1. Traditional arrangement, 2. Design and build, 3. Measurement, 4. Prime cost and 5. Separate Management functions. The basis for selection of the best option towards the project is: I. Accountability II. Design input III. Experience form the past procurement route used IV. A background knowledge of the route chosen V. Costs to be incurred VI. Punctuality VII. Efficiency in relation to the time when the project kicks off VIII. Life span of the project IX. Risks involved and X. Relationship between the client and contractor during execution of work ((CRC Construction Innovation). Procurement Routes 1. Traditional or Design-Bid-Build For this type of procurement route, the client develops the idea of the project and comes up with a budget. ...
Download paper
Not exactly what you need?

Related papers

Civil Engineering Construction
First, the planners used geographic and topographic maps. Although technology and computers were not yet very effective at that time, the information the planners had was enough to make them achieve their great objective. Present planners and engineers have all the information from computers and databases before they embark on such a gargantuan task. The vision that the planners had is mastery…
Procurement
Although enacted more than a decade later the Procurement Law was designed to arrest if not prevent a repeat of the era which was considered the lowest ebb the construction industry have experience in the United Kingdom. Although generally applicable in construction project where the government is the primary client, both reports take into consideration one important aspect in construction…
Construction Procurement and RIBA Plan of Work
1. Separated & Cooperative System This system is one of the most widely used system where each party of the project namely client, designer and contractor are different and work separately. In this system each party completes it work and then project is transferred to next sequential predecessor. The system initiates with a feasibility study then detail design, tendering, contracting for…
Construction procurement and legal framework for construction operations
It may be either small scale or large scale. For successful completion of the construction project, effective planning is crucial. There are various types of construction: 1. Residential building construction 2. Commercial building construction 3. Industrial building construction 4. Heavy civil construction. The type of construction is the chief determinant of the variety of approach to the…
Construction Engineering
When the constructed facility is offered proper management and maintenance, the facility may last 100 years or more; the facility is also capable of serving different functions within the specified time. The actual lifetime of a property is dependent on a number of factors, including the quality of design, the durability of the materials used for the construction, the quality of the facility and…
Construction Engineering
Following are the steps involved in designing new hospitals in Canada(Martin). First and foremost step is designing the patient care areas which may either be for a single patient or for multiple patients. These areas are designed for proper HVAC conditions so that least energy is consumed to maintain required environmental parameters. These areas are usually provided with a window or wall that is…
Construction Engineering
Whether or not a power plant can be built on a specific location is determine by carrying out technical surveys based on following recommendations. Supply of raw material to the place is convenient .i.e. the construction site is provided by roads to transport goods to that part of the area. Must have ample space to accommodate construction machinery. Must have proper area for dumping mud extracted…