Engineering - Construction Procurement - Essay Example

Nobody downloaded yet

Extract of sample
Engineering - Construction Procurement

Provide a reasoned recommendation based on your discussion. Introduction Understanding of procurement paths has led to analysis of traditional procurement route and development of other routes. With a variety of procurement routes available, clients have to critically analyse the best available option. There are different approaches to procuring projects. These approaches are complicated since they lack clarity and particular description of particular procurement routes. The common types of procurement routes available are; 1. Traditional arrangement, 2. Design and build, 3. Measurement, 4. Prime cost and 5. Separate Management functions. The basis for selection of the best option towards the project is: I. Accountability II. Design input III. Experience form the past procurement route used IV. A background knowledge of the route chosen V. Costs to be incurred VI. Punctuality VII. Efficiency in relation to the time when the project kicks off VIII. Life span of the project IX. Risks involved and X. Relationship between the client and contractor during execution of work ((CRC Construction Innovation). Procurement Routes 1. Traditional or Design-Bid-Build For this type of procurement route, the client develops the idea of the project and comes up with a budget. A consultant prepares the design and tender documents for the scope of work to be executed. It is the work of the client to appoint a suitable contractor to execute the work according to the design. The contractor has to complete the work within the specified time frame after an agreement on the contract amount. The contractor remains in a position to sublet the work although he remains liable to the client. During the execution of works, the consultant remains as the administrator, advising the contractor in matters pertaining to design, progress of work and payment certificates ought to be paid by the client. The contractor is therefore obliged to execute work according to the design, failure of which may lead to his disqualification. This route is preferred and used by most clients on the basis of these facts; a. It is beneficial to all clients especially to the inexperienced clients b. Suitable for complicated projects and those which rely on functions as their prime objective c. Suitable for projects whose time frame can be predicted d. Suitable for projects whose costs are certain. The clients are provided with low-risk options in terms of costs, delays or failure in the design of the project. The clients are exposed to risk when; a. The design phase of the project is rushed b. The project time frames set are abnormal and c. Incomplete tender documents are submitted (Greenhalgh and Squires 2011, p.95). Refinements To minimize these risks, some refinements are made to this method. This refinement is called Two stage tender. The contractor’s tender rely on consultant’s design partially. This is the stage 1 tender. Thereafter, the contractor will assist in the development of the design and complete tender documents. These documents are then used to develop tenders for the work to be executed (stage 2 tender).the party involved in stage 1 tender has the opportunity to participate in the construction stage. This refinement adds risks to the final tender sum, uncertainty in date of completion of the project. ...Show more

Summary

CONSTRUCTION PROCUREMENT By (Your Name) Presented to (Instructor/Tutor) (Course/Subject) (Institution/University) (City, State) (Date) Scenario Following a long period of fund raising, together with a number of grants from local and central government and others, Littletree Parish Council are now able to proceed with the construction of a new community centre/village hall…
Author : bbuckridge
Engineering - Construction Procurement essay example
Read Text Preview
Save Your Time for More Important Things
Let us write or edit the essay on your topic
"Engineering - Construction Procurement"
with a personal 20% discount.
Grab the best paper

Check these samples - they also fit your topic

Byetree procurement strategy
Practically, MSA provides a safety function most especially for the drivers to stretch and relax their stressed muscles due to driving for at least 20 minutes for every two hours travel (Highways Agency, 2012). In the past few decades, it has been observed that most MSAs were put up only to provide the basic needs of motorist which are food, toilet/wash, and fuel, without much concern on the surrounding environment.
22 pages (5500 words) Essay
Engineering and Construction: Roles and Responsibilities; Health and Safety Legislation
Architect obtains raw facts from the client and develops them to information that can be interpreted by various personnel in the construction field. He participates in the building process throughout, from planning to occupancy. He is also known as the lead consultant and chairs all the site meetings.
14 pages (3500 words) Essay
Construction procurement and legal framework for construction operations
mammoth 16 Tort and Contract distinguished 18 Forms of Liability 19 Intention or negligence or the breach of statutory 19 Intention 19 Negligence 19 Breach of strict duty 20 ‘Reasonable’ and ‘Reasonable man’ 20 Introduction Construction simply refers building and assembling infrastructure.
14 pages (3500 words) Essay
Construction Projects, Establishing a Procurement Strategy
Partnering is only fitting if the management share the basic belief that the parties involved are honest, want to do things that are valued and are motivated by the challenge to succeed, thus adding value to either constituent parties. The development of a successful partnering concept can be based on the opinions of the participating parties with hands on experience including clients, consultants, and contractors.
16 pages (4000 words) Essay
Procurement route
The various processes involved under the procurement process are as listed below: Requirements estimation: Upon having determined the various construction elements, it is important to calculate various aspects of each of these
6 pages (1500 words) Essay
An invertigation of influence of procurement methid in construction industry in Hong Kong
From the survey of 50 construction professionals, there were 4 most influential criteria which are quality, cost, time and risk. Moreover, size of the company is significantly and
54 pages (13500 words) Essay
Appraise the impact of Post-Latham and Egan report initiatives on procurement pathways and ways of working within the construction industry
The study resulted in publication of a report entitled ‘Constructing the Team’ (1994) which reviewed the procurement and contractual arrangements in the UK construction industry. The report was later
10 pages (2500 words) Essay
Construction Procurement
The Council has narrowed the choice of procurement down to traditional or design and build. Understanding of procurement paths has led to analysis of traditional procurement route and development of other routes.
5 pages (1250 words) Essay
Procurement and Administration
With no structures in place and in order to accomplish their mission, the GSMA intends to develop a modern manufacturing research centre that will serve its
12 pages (3000 words) Essay
(Q2.The Government states that 'the adoption of the NEC3 2005 Engineering and Construction contract suits the needs of a modern construction industry'. Provide an appraisal in response to such a statement
The second edition was published in 1995 and applied to a wider range within the engineering and construction field. It was in 2005 that the third edition, NEC3, was developed. NEC3 is currently used and exhibits various changes. It has been
2 pages (500 words) Essay
Hire a pro to write
a paper under your requirements!
Win a special DISCOUNT!
Put in your e-mail and click the button with your lucky finger
Your email
YOUR PRIZE:
Apply my DISCOUNT
Comments (0)
Click to create a comment
Contact Us