Engineering - Construction Procurement

Provide a reasoned recommendation based on your discussion. Introduction Understanding of procurement paths has led to analysis of traditional procurement route and development of other routes. With a variety of procurement routes available, clients have to critically analyse the best available option. There are different approaches to procuring projects. These approaches are complicated since they lack clarity and particular description of particular procurement routes. The common types of procurement routes available are; 1. Traditional arrangement, 2. Design and build, 3. Measurement, 4. Prime cost and 5. Separate Management functions. The basis for selection of the best option towards the project is: I. Accountability II. Design input III. Experience form the past procurement route used IV. A background knowledge of the route chosen V. Costs to be incurred VI. Punctuality VII. Efficiency in relation to the time when the project kicks off VIII. Life span of the project IX. Risks involved and X. Relationship between the client and contractor during execution of work ((CRC Construction Innovation). Procurement Routes 1. Traditional or Design-Bid-Build For this type of procurement route, the client develops the idea of the project and comes up with a budget. ...
Download paper

Summary

CONSTRUCTION PROCUREMENT By (Your Name) Presented to (Instructor/Tutor) (Course/Subject) (Institution/University) (City, State) (Date) Scenario Following a long period of fund raising, together with a number of grants from local and central government and others, Littletree Parish Council are now able to proceed with the construction of a new community centre/village hall…
Author : bbuckridge

Related Essays

Constructing a motorway (civil engineering project)
This essay discusses that a motorway can be defined roughly as a main road or highway, with two or more lanes on opposite direction, and where fast motor traffic occurs. A motorway has to be well constructed with all the required plans, materials and skilful engineering needed to provide a long-lasting use for motorists. As the Junior Site Manager of a 30-mile motorway, my job is to provide the plan and the necessary activities to have a smooth flow of construction, maintenance and completing of this motorway. But before going on an analysis of the construction parameters, I deemed it...
11 pages (2761 words) Essay
Procurement
Although enacted more than a decade later the Procurement Law was designed to arrest if not prevent a repeat of the era which was considered the lowest ebb the construction industry have experience in the United Kingdom. Although generally applicable in construction project where the government is the primary client, both reports take into consideration one important aspect in construction projects that is the satisfaction of the client. ...
10 pages (2510 words) Coursework
Construction Procurement and RIBA Plan of Work
Separated & Cooperative System ...
8 pages (2008 words) Assignment
Construction procurement and legal framework for construction operations
It may be either small scale or large scale. For successful completion of the construction project, effective planning is crucial. There are various types of construction: 1. Residential building construction 2. Commercial building construction 3. Industrial building construction 4. Heavy civil construction. The type of construction is the chief determinant of the variety of approach to the procurement of construction services. Construction procurement is absolutely crucial to the delivery of a project on time, budget and high quality. Good procurement is synonymous with the success of the...
14 pages (3514 words) Essay
Construction Engineering
When the constructed facility is offered proper management and maintenance, the facility may last 100 years or more; the facility is also capable of serving different functions within the specified time. The actual lifetime of a property is dependent on a number of factors, including the quality of design, the durability of the materials used for the construction, the quality of the facility and the technology used (Edwards, Bartlett and Dickie 2-7). Other factors determining the lifetime of the facility include the local climate and the location, extent of use and the damage caused by human...
7 pages (1757 words) Assignment
Construction Engineering
Following are the steps involved in designing new hospitals in Canada(Martin). First and foremost step is designing the patient care areas which may either be for a single patient or for multiple patients. These areas are designed for proper HVAC conditions so that least energy is consumed to maintain required environmental parameters. These areas are usually provided with a window or wall that is directly exposed to harsh weather conditions. Therefore, proper supply and exhaust outlets are provided in order to provide isolation from air borne infections. Rooms being designed for patients with...
7 pages (1757 words) Assignment
Construction Engineering
Whether or not a power plant can be built on a specific location is determine by carrying out technical surveys based on following recommendations. Supply of raw material to the place is convenient .i.e. the construction site is provided by roads to transport goods to that part of the area. Must have ample space to accommodate construction machinery. Must have proper area for dumping mud extracted from the construction site. Quebec is rich in places that are suitable for the construction of power plant. For the construction of such a facility in Quebec, following considerations are followed....
6 pages (1506 words) Assignment
Got a tricky question? Receive an answer from students like you! Try us!