Outline: Introduction Desk Study including location, background, relevant history, reasons for the crossing etc. Description of the access sites and existing features 2. An outline of the CDM requirements you would need to consider for this project. 3. An outline of the roles played by a Land/Engineering Surveyor, a Construction Manager and a Civil Engineer applied specifically to this project…

Extract of sample
A New Tunnel under the Thames

7. Include a set of drawings of your proposed tunnel, including a. a detailed cross section, b. a long section c. a map showing your suggested new road layout and d. a map indicating remedial works to minimise the impact of the extra traffic on the surrounding areas. 8. The site designated for the northern access (between Galleons Reach DLR and the river) is currently a brown field site with possible contamination, which includes an infestation of Japanese knotweed and some fly-tipping which may contain asbestos. Explain the procedures needed to bring the site into a condition suitable for construction. A new Tunnel under the Thames Introduction A tunnel is a subversive vessel, entirely covered a part from openings for entrance and exit, usually from both ends. A tunnel can be constructed for foot passage, rail, vehicle traffic, or a canal. The new Thames river crossing will allow closing of the Wool Wish Ferry. The bridge will relieve congestion for people living adjacent to Blackwall. This marks the location of Thames Gateway Road Bridge that was scrapped by the mayor in 2008, following the rejection of the plan by the Inspector at a Planning Inquiry. The tunnel, which will run from Greenwich Peninsula to the royal Docks, is expected to have a capacity of up to 2400 cars per hour in each route. ...
Download paper
Not exactly what you need?

Related Essays

Measured Building Survey
It comments on the current state of all parts of the structure. These parts of the building are physically inspected but limited to the scope of services offered by the building surveyor. Major defects survey is also referred to as main elements survey. For this type of survey, focus is on the main parts of the structure. Inspection and report concentrate on selected areas like roofs, floors, ceilings and windows. The home buyer report survey is standardized, covering main aspects of the structure but not detailed. It is restricted only to accessible parts of the structure. Specific survey…
8 pages (2008 words)
Scheduling Management in Tunnel Construction Projects
45). Scheduling management Scheduling management is very important to any project because it entails helpful techniques applicable while managing activities involved in projects. Managers practice scheduling management before starting up a project, which involves. Pointing out the task that interests an individual, estimating the total period that the task will take, and distributing resources needed to perform that task, finally deciding on when the task will commence. In the procession of a project, monitoring is important as it ensures that scheduling management predicts the future of a…
7 pages (1757 words)
Construction Health and Safety: "The Crossrail Project"
It is seen that the capacity will be freed at the current termini like Paddington and Liverpool, once Crossrail will have been completed in 2017. The project will also create up to 14,000 jobs at the peak of its construction in 2013/2015. Moreover, it will help create a further 7,000 jobs indirectly according to Great Britain: Parliament: Select Committee on the Crossrail Bill (2007 P. 1784-1789). New chances for interchanges with Overground services and TfL Underground would further help reduce congestions at the termini. This in turn, will enable central London stations in business and…
4 pages (1004 words)
channel tunnel
The Transmanche Link (TML) is the contractor who is responsible for the Channel Tunnel design, construction and commissionioning of the project. Design of the Channel Tunnel The design scale was massive and highly intricate and hence it was categorized into five divisions – a) System throughput b) Performance of shuttle trains c) Environment d) Safety and passenger evacuation e) Scenarios and operational procedures The design of the Channel Tunnel included four phases: 1. Development Study 2. Outline Design APS) 3. Definitive Design (APD) 4. Detailed Design (PEO) The design of the project…
3 pages (753 words)
Risks management analysis during Construction stage and Operational stage of the Channel Tunnel Project
This serves to mitigate the risk of resource shortage for the project, through the application of the principle of maximizing utilization of the resources, to ensure that they fit into the project schedule. Program monitoring and control is yet another vital risk mitigation concept under the construction phase, which entails consistent and regular evaluation of every single aspect of the project and the timely correction of any errors, to ensure that the construction process progresses without safety threats (Yan-juan, Ding-li, & Jian-jun, 2009 p3). This calls for the full adoption and…
3 pages (753 words)
Risks management analysis during Development stage of the Channel Tunnel Project, Including management of environmental risks du
(Yan-juan, Ding-li, & Jian-jun, 2009 p2). This is then followed by the assessment of the influence of the excavation on underground strata structures, and how such excavation might lead to their deformation. To reduce the probability of these risks, the Construction, Design and Management Regulations have been developed to aid the monitoring and avoidance of the risks. The necessary controls are then implemented immediately, to prevent the occurrence of the risks (Aritua, 2011 p304). When all that information is collected, a program detailing the nature of the strata and how it might be…
6 pages (1506 words)
Cause of the collapse of Heathrow rail tunnel in 1999 and what should have been done to prevent the collapse
NATM was implementing one of the firsts in almost everything. The technology of the method involves spraying shotcrete around the surrounding of the tunnel. This process leads to the formation of the supportive crust though temporarily. It was the first time that the project was used in London clay and the method being new most of the people working in the tunnel were not familiar with some of its aspects. In addition, the New Austrian Tunnelling Method (NATM) applied the self-certification method for the first time at the London Heathrow Airport site (Muir, 2000, p. 19). This method requires…
6 pages (1506 words)