Cost-Benefit Analysis of A Public Infrastructure Project

Cost-Benefit Analysis of A Public Infrastructure Project Assignment example
High school
Assignment
Engineering and Construction
Pages 8 (2008 words)
Download 0
Contents Contents 1 Cost-Benefit Analysis of a Public Infrastructure Project 2 1.0 Introduction 2 1.1Project description 3 1.2 Cost Identification 6 1.3Quantitative Benefits 6 1.4 Cost benefit analyses 6 1.5 Conclusion 8 References 10 Name Tutor Task Date Cost-Benefit Analysis of a Public Infrastructure Project 1.0 Introduction Infrastructure is a term used to describe an underlying foundation that is useful in the provision services and goods to enhance community continuance and growth…

Introduction

Thus, to come up with a public infrastructure, several factors will be considered to look at both the advantage and causality in order to achieve the optimal benefit that is required. Public infrastructure is considered to be of good interest to the society if its final outcome benefits surpass the cost of implementing the total project. If the cost of implementing the infrastructure is more than the benefit the society is supposed to enjoy after its completion, then, the project is of no much benefit to the society. To realize the cost benefit of a public infrastructure, a cost benefit analyses is carried out to investigate the benefit the society is expected to achieve once the said infrastructure is completed. If the result shows that the project has a positive benefit, then, the infrastructure should be implemented. If the result on the other side reveals that the benefits of the project upon completion reflect negative benefit, then, the project should be dropped (Campbell and Brown, 15). 1.1Project description The public infrastructure that is illustrated under this paper is of power plant construction nature which is located in Middle East and North African region. ...
Download paper
Not exactly what you need?

Related papers

Development Appraisal, Project Cost Control
The building and construction sector includes contractors who build buildings for residential, industrial and commercial purposes. SECTION-A Question 1 This is a case whereby companies operating in the construction industry need to develop, differentiate, defend and communicate the development contribution they make to their host country  in just the same way as they manage the value they…
Re-negotiations in PPP Transport Infrastructure Projects
Majority of these engagements are made effective via a group of diverse companies and contractual concessions. According to Smith (2002) the Principal refers to the one responsible for granting a concession and the ultimate owner of the facility after transfer. They are mostly government agencies, or regulate monopolies. On the other hand, the promoter is the organization that is granted the…
Kingdom Centre project analysis
Planning PAGE 6 ………………………………………………. Construction PAGE 9 ………………………………………………. Task 2: Risk Management PAGE 12 ………………………………………………. Table 1 PAGE 13 ………………………………………………. Table 2 PAGE 21 ………………………………………………. Table 3 PAGE 21…
HS2- cost vs benefits
The Government’s base of argument is on the projected forecasts that are unreal. The painful experience gathered from HS1 project is concrete evidence for evaluation of the project. The project will create demand for high-costs and taxpayer-funded transport capacity. The benefits alleged by the Department for Transport remain wanting. BACK GROUND KNOWLEDGE ON HIGH SPEED RAIL The high speed rail…
Risk Management
Often, an infrastructural construction project involves a number of phases before final completion and transfer to the contract awarding authority. The phases include the appraisal phase, the design phase, the construction phase, and the operation phase. Although there are some cross-cutting risks across the phases, some are unique to each phase and hence it’s often important to independently…
An Analysis of six Infrastructure projects that take place in two countries.
Differences in organizational cultures between companies or disparities in professional cultures between consultants, contractors and clients may exist. This dissertation aims to address the impact of political and cultural differences in project management of cross national projects. Apart from identifying the political and cultural differences that affect project management, case studies of six…
Drivers for adopting public-private construction partnerships in the US, UK and Australia.
This study also narrows the gap in the literature by collecting primary empirical data from interviews with construction company managers and owners in the US with a view to understanding their perspectives on the drivers for adopting PPPs. The results of this study are discussed and implications for practice and areas for further research are identified.