Design-build and Design-Bid-Build Contracts: Their Advantages and Disadvantages - Research Paper Example

Only on StudentShare
Author : boganlaila

Summary

The system of contracting proves to be an essential part in the construction projects since the planning of the design and the execution of the project depends on this contract. …

Extract of sample
Design-build and Design-Bid-Build Contracts: Their Advantages and Disadvantages

The design-build and design-bid-build are the two forms of contracting in this regard that are most commonly considered while planning for a construction project. While the design-build is a traditional method, the other is an alternative form of contracting involving greater complicacies. Also, these two systems have their respective advantages and disadvantages that can significantly affect the effective completion and quality of work. This particular study thus considers the concept of these two contracting systems and discusses about the advantages and disadvantages of both the systems of contracting. Introduction: Design-build and design-bid-build are two contract forms as involved in building projects and improvements. Design-build represents single solicitation or contract where the statute after authorization allows alternating methods of contracting. ...
Download paper

Related Essays

Production Management Principles
The construction process is to take place in a college that is also near a rural village. The project will therefore have both disruptive and beneficial effects on the community. This section provides the corrective measures and methods that should be put in place, where feasible, to minimize the amount of the resulting disruption. Generally, the company has set construction practices that take into consideration the direct impacts of the construction process and also provides for measures to minimize and if possible eliminate their effects. The Company will seek to provide an assurance to the…
12 pages (3012 words)
Evaluating the Traditional and Design-and-Build Methods in the Irish Construction Industry: An Empirical Enquiry
In contrast, the sectors dealing with the construction of the commercial and industrial buildings are the only ones who have recognized the importance of the Design and Build Procurement Method, aimed towards the betterment of their projects. Hence, the second hypothesis was accepted, that the use of the Design and Build Procurement Method is confined only to the industrial and commercial buildings sector. The Design and Build Procurement Methods ensured better project performance in terms of reduction in the length of time devoted to the completion of the project, better value for money and…
70 pages (17570 words)
Advantages and Disadvantages of Design Build Project Delivery Method
It can be observed that convectional methods of project delivery have given way to more creative methods, and this has been done so to save time, save money, and to provide a more coordinated team approach with objective of reducing litigation. Each project delivery method has benefits as well as its own limitations. Design-built project delivery method constitutes one of the modern popular project construction methods (Darren, Pramen, Fasce & Masce 579). The premise of this method is that the owner hires one entity, which is a design-builder, and this design entity becomes the sole provider…
4 pages (1004 words)
Engineering - Construction Procurement
Provide a reasoned recommendation based on your discussion. Introduction Understanding of procurement paths has led to analysis of traditional procurement route and development of other routes. With a variety of procurement routes available, clients have to critically analyse the best available option. There are different approaches to procuring projects. These approaches are complicated since they lack clarity and particular description of particular procurement routes. The common types of procurement routes available are; 1. Traditional arrangement, 2. Design and build, 3. Measurement, 4.…
5 pages (1255 words)
Construction Legislation Essay
The firm is also responsible for drawing up contracts bids. The company should also draws tender documents in relation to construction and development of this project. Part one 1.1 Consultancy Legal Documentation This part involves presenting all the legal documents necessary in project management. This will protect the project manager or the consultancy firm that is the playing the role of project management. The first document is a contract document between the company offering project management and the client. This is a show of evidence that these parties are in a contractual agreement to…
9 pages (2259 words)
project design
However, packaging of ice cream on commercial basis was always a problem for mass producers. Initially they used to supply the product in cups but in the early 1900 manufacturers identified a strong need of introducing ice cream carriers which were less costly and more productive. John was too frustrated those days because of the increasing raw material cost. He has been into the ice cream manufacturing industry since last twenty years but now he was facing immense difficulty in meeting up all the business expenses while maintaining good profit margins. His company used to do business in the…
5 pages (1255 words)
Design, build and test a flat belt/pulley
These belts operate efficiently at speeds of 1500-6500 feet per minute and temperatures of between -30 to 185 degrees Fahrenheit. These belts are categorized into industrial (narrow, conventional, light-duty and double V cross section), automotive and agricultural. V belts have reinforcing cords in the belt that provide load-carrying capacity. This reinforcement is made of nylon, steel, rayon or glass fibers embedded in a cushion section (soft rubber material). The cushion section is externally covered with tough rubber and the interior is covered with a material that is resistant to abrasion.…
10 pages (2510 words)