We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Nobody downloaded yet

Supply chain management plan in construction project - Coursework Example

Comments (0) Cite this document
Summary
This supply chain management (SCM) plan aims at centrally controlling and also linking the production, ferrying or shipment of construction materials, excellent information movement, and least financial costs from one point to another and finally to the site of construction a…
Download paper
GRAB THE BEST PAPER

Extract of sample
Supply chain management plan in construction project

In the new multi-storey car park, emphasis is placed on the reduction of the inventory costs, timely availing of the construction items without delay of the required goods, least manpower wastage entailed in the process and professional management of the process. The plan dwells heavily on the design of the inventories, thus creating a tightly controlled and regulated internal inventories, proper and timely distribution of items, proper management of the internal production processes, and augmented communication between the store-keeping and constructions processes. The SCM) plan for the construction industry has huge consideration for the structural construction technique applied. For client CPI who has some of the contractors readily assigned and other yet to be vetted for tackling of the construction process it is highly relevant for the enacting of the entire construction plan.
Facilitation of raw material logistics and movements begins from their various sources. Apart from pre-cast concrete that ICP manufactures at its plants other materials are supplied from their different source points. The standardization process from the ICP gives the ICP great hold of the quality generated from structural strength and durability of the materials. ICP finds it hard to assign to the contractor design and manufacture of the precast since the skill is little in the west Yorkshire. The precast also demands effective time and duration to cure well in a specific environment before use. All the materials will be collected at collection or storage points in the designed place in the facility. Proper and timely financing operations and excellent information gathering will lead into allocation of contracts to least and effective bidders to aid in having the low cost materials. According to the provided building projects deadline procedures or timeline management every product will be ... Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Supply chain management plan in construction project Coursework”, n.d.)
Retrieved from https://studentshare.net/engineering-and-construction/782390-supply-chain-management-plan-in-construction-project
(Supply Chain Management Plan in Construction Project Coursework)
https://studentshare.net/engineering-and-construction/782390-supply-chain-management-plan-in-construction-project.
“Supply Chain Management Plan in Construction Project Coursework”, n.d. https://studentshare.net/engineering-and-construction/782390-supply-chain-management-plan-in-construction-project.
  • Cited: 0 times
Comments (0)
Click to create a comment
Let us find you another Coursework on topic Supply chain management plan in construction project for FREE!
Contact us:
+16312120006
Contact Us Now
FREE Mobile Apps:
  • About StudentShare
  • Testimonials
  • FAQ
  • Blog
  • Free Essays
  • New Essays
  • Essays
  • The Newest Essay Topics
  • Index samples by all dates
Join us:
Contact Us