Sustainable Construction, Management and Professional Studies

Sustainable Construction, Management and Professional Studies Essay example
Engineering and Construction
Pages 6 (1506 words)
Download 0
PROCUREMENT METHODS AND TENDERING ARRANGEMENT by Student’s Name Course Name Professor’s Name University Name City, State Date Introduction Owing to the fact that brick flood-relief sewer has broken down, there is need to repair the system. This is to make sure that the sewer system will continue to serve Uxbridge Water plc (UW) customers in accordance to the initial design.


Moreover, there is also need to ensure that the repair works goes on well in accordance to the design. These expectations will actually be guided by the contracts between Uxbridge Water plc and the designer as well as the contractor for repair works. Consequently, this report outlines the procedure that will be used during the procurement and contract matters for the repair works. Procurement method Since Uxbridge Water plc is aware of the construction process and more over it has a professional team who will play a significant role in the repair works, it is therefore crucial that the company uses design and build procurement method. Although the method is very important in cases where the client, or the company is not familiar with the construction process, the design and build contracting method works well on the projects which has no design and there is need for a design before commencing with the repair works (Macaulay, 2002). It is also crucial when the project contains a high level of technical complexity and will therefore require complex designs. Consequently, the current project involves the repair of a sewer line which evidently is complex. ...
Download paper
Not exactly what you need?