Construction Project Management - Essay Example

Only on StudentShare
Author : jensen33

Summary

The purpose of this paper, therefore, is to analyze not more than six construction projects undertaken in two nations in order to identify factors that may be affecting these projects, and how they are managed. The main aim or objective of this dissertation is to investigate how politics may affect construction project jointly undertaken by two nations.

Extract of sample
Construction Project Management

This paper stresses that other than the typical constrains of managing construction projects such as time, cost and scope, there exist a number of factors that may inhibit successful completion of construction projects however how well a construction Manager may be. The problem may become worse while managing projects that are jointly undertaken by two nations. Some of these factors may include construction projects being undertaken by two nations are: politics between the involved nations, cultural differences, and national culture. A number of projects have been hampered by these factors while others have been completed. Completion of some of these projects has been after overcoming challenges while other projects have even failed to commence due to political interests and differences.
This paper makes a conclusion that the success of these projects is a result of including and solving the various internal and external factors that may be associated with the projects in the designing and planning face. Therefore, in order that projects are completed successfully, it is important that the various aspects are integrated while planning for these projects. The author of the paper among the projects that have been hampered by politics are South-Sudan- Kenya oil pipeline project, the Mexico Fence Border project, and Channel Tunnel Project among others. Amongst the ones that have been completed with schedule, budget and scope are: Upgrading of Pacific Highway project and Oresund Bridge project among others. ...
Download paper

Related Essays

An Investigation of Safety Practices in the Saudi Arabia Construction Industry
A study conducted by Larsson and Field (2002) demonstrated that risk exposure in terms of safety continues to be high in the construction industry. A study by Edwards and Nicholas (2002) also portrayed the construction industry as the most hazardous in Europe as well as globally. In their assessment of safety in the construction industry of Saudi Arabia, Jannadi and Assaf (2000) found that safety management is very poor, and further thatit is not tightly regulated by the government, as it should be. The findings also demonstrated the need for a safety code to be implemented in Saudi Arabia in…
33 pages (8283 words)
A systematic stakeholder management approach in aviation construction projects
The research concluded that the most significant stakeholders with whom higher risks were associated were suppliers, clients and end users of the project. Due to their diverse and varying roles during the entire phases of the project and the tremendous risks associated with their demands and expectations, these stakeholders must be managed from very initial stages of the project. Another barrier to effective stakeholder management was lack of realization that as the project lifecycle progresses the changes have exponential negative impact on project outcomes. These changes towards the mid and…
51 pages (12801 words)
Lessons from the Titanic. How the lessons learned from the sinking of the liner Titanic can be applied to modern projects
The sinking of Titanic in Atlantic on 14 April 1912 resulting in death of 1502 passengers is remembered as one of the deadliest peacetime maritime disasters in modern history. The purpose of this dissertation is to review the historical project of constructing Titanic for operational use. The project also aims at analyzing the reasons from the perspective of project management that led to failure of this huge project of its time and applying the lessons learnt to modern day projects. The research on the subject is mainly based on extensive review of available literature, for which a variety of…
48 pages (12048 words)
Analysis of Soft Systems Methodology in Relation to Construction Projects
.6 Methodology of SSM in Construction Project Risk Management.7 Limitations of SSM and Need to use Hard Systems.8 References.10 Analysis of the Soft Systems Methodology in Construction Projects Construction projects are complex processes that incorporate many skills, materials, and different operations (Sears et al, 2008). There is therefore a need for numerous skills and techniques to be put together to ensure the best results are attained, not only for the contractors but numerous stakeholders involved in the project. Soft Systems Methodology (SSM) seeks to inquire about the perceptions and…
7 pages (1757 words)
Scheduling Management in Tunnel Construction Projects
45). Scheduling management Scheduling management is very important to any project because it entails helpful techniques applicable while managing activities involved in projects. Managers practice scheduling management before starting up a project, which involves. Pointing out the task that interests an individual, estimating the total period that the task will take, and distributing resources needed to perform that task, finally deciding on when the task will commence. In the procession of a project, monitoring is important as it ensures that scheduling management predicts the future of a…
7 pages (1757 words)
An Analysis of six Infrastructure projects that take place in two countries.
Differences in organizational cultures between companies or disparities in professional cultures between consultants, contractors and clients may exist. This dissertation aims to address the impact of political and cultural differences in project management of cross national projects. Apart from identifying the political and cultural differences that affect project management, case studies of six infrastructure construction projects in two countries have been conducted. The research suggests that differences in professional cultures, politics and institutions affect the successful management…
60 pages (15060 words)
A PERSPECTIVE OF SKILLS NEEDED BY MODERN PROJECT MANAGER TO AVOID DELAY PENALTIES IN CONSTRUCTION PROJECTS
They face a number of challenges that revolve around construction issues such as time constraints, workforce considerations, safety and continually shifting nature of work. They also face non construction related challenges such as government regulations, legal issues, socio-political pressures and environmental concerns. It is thus important to find out how we can raise the efficiency of project managers to enable them in managing projects effectively and avoiding delays in the implementation of the project plan and in turn avoiding delay penalties. This research thus sets out to identify the…
51 pages (12801 words)