Name: Course: Date: Risks management analysis during Development stage of the Channel Tunnel Project, Including management of environmental risks during the project life-cycle Development Phase The development phase is particularly a sensitive phase of the Channel Tunnel Project, considering that safety must be enhanced from the very start of the project, lest the whole project becomes a risk…

Introduction

(Yan-juan, Ding-li, & Jian-jun, 2009 p2). This is then followed by the assessment of the influence of the excavation on underground strata structures, and how such excavation might lead to their deformation. To reduce the probability of these risks, the Construction, Design and Management Regulations have been developed to aid the monitoring and avoidance of the risks. The necessary controls are then implemented immediately, to prevent the occurrence of the risks (Aritua, 2011 p304). When all that information is collected, a program detailing the nature of the strata and how it might be influenced by the excavation of the tunnel is developed (ProQuest, 2012 p2). The details of the settlement and deformation of the strata are recorded, and a scheme to control the occurrence of the deformation of the strata then generated (Yan-juan, Ding-li, & Jian-jun, 2009 p3). The monitoring and current control strategies are then established, to ensure that the influences of the excavation are constantly monitored and Consistent management of the site and the assessment of the structures is done on a real-time basis, and any necessary control and rectification implemented. ...
Download paper
Not exactly what you need?

Related papers

Project Management
Before the industrial revolution, training in artisanship was associated with manufacturing and was significant in developing new artisans. Since the 18th century after the industrial revolution, many ideas emerged to enhance the manufacturing process, not withstanding the type of goods produced. This paper describes the historical processes that have shaped manufacturing over the last century…
Project Management Strategic Issues
Projects fail due to various barriers that emanate from internal organization as well as from external sources. However, the role that a project manager plays in the project process matters a lot. The report provides an analysis of actions to be taken by strategic project management which can enable planning and completing construction process in time and within set cost targets. A brief…
Scheduling Management in Tunnel Construction Projects
45). Scheduling management Scheduling management is very important to any project because it entails helpful techniques applicable while managing activities involved in projects. Managers practice scheduling management before starting up a project, which involves. Pointing out the task that interests an individual, estimating the total period that the task will take, and distributing resources…
channel tunnel
The Transmanche Link (TML) is the contractor who is responsible for the Channel Tunnel design, construction and commissionioning of the project. Design of the Channel Tunnel The design scale was massive and highly intricate and hence it was categorized into five divisions – a) System throughput b) Performance of shuttle trains c) Environment d) Safety and passenger evacuation e) Scenarios and…
Risks management analysis during Construction stage and Operational stage of the Channel Tunnel Project
This serves to mitigate the risk of resource shortage for the project, through the application of the principle of maximizing utilization of the resources, to ensure that they fit into the project schedule. Program monitoring and control is yet another vital risk mitigation concept under the construction phase, which entails consistent and regular evaluation of every single aspect of the project…
Project Management,
The involvement of the other tenderer that would assist to reduce the gap between the tender and the budget by offering a better solution out of experience from working with different types of tendering items. The tenderer can give directions of acquiring cheaper tools. At the same time, the tenderer can promise to offer a cheaper tender for the same contract. If there is a significant discrepancy…
Project Management Theory & Practice
Therefore, in order to come up with successful, reliable and efficient projects, project managers are required to have a keen interest in managing quality of a project and shall also consider factors influencing quality of a project (Chen, 2010; Levy, 2011). This paper includes a discussion of how various factors influence the quality management process in a project management scenario and what…