construction management Essay example
Undergraduate
Essay
Engineering and Construction
Pages 4 (1004 words)
Download 0
Name Tutor Course Date Construction Methods and means The standards and the outcome or features of this centre determine the rate in which it will take up its market niche and the consequent sustenance (Alpine, Daniel & Ronald, 54). The construction process of DMD center for fitness should be broken down into numerous stages, which include groundbreaking, initial ground leveling, brick construction and finishing…

Introduction

The schedule may specify the specific roles for the unskilled and skilled. For instance, starting time can be set at 7am and ending at 5pm. Similarly, construction manager is required to consider the pay rate of overtime schedule. The major role of the unskilled workers involves preparation of construction material mix, timely. The superintendent is responsible in carrying out the activities as instructed by the construction manager and with the help of the project or center map. The function of the superintendent to perform close examination to ensure that, the laid daily schedule is followed such that, the set down period for the whole construction process can be adhered to. More over, the superintendent ensures that the specified ratio of the materials is followed to the latter. The superintendent, ensures that proper records of equipment is well taken especially when begging the daily schedule and at the end of every day. This practice is endeavored to ensure safety and availability of such equipment as to when and where they are needed in the right condition. Labor situation The concept of labor requires the underlying principle of availability to be embraced. ...
Download paper
Not exactly what you need?

Related papers

Construction Cost Control & Management
In our case, the formula is; (a + 4 m + p) / 6 (NetMBA, 2012). Where, O = Optimistic Time. M = most likely time. N = pessimistic time. Activity a days m days b days Expected Days a 4 m p (a + 4 m + p) / 6 AB 4 5 6 (4 + (4 *5) + 6) / 6 = 5 BC 2 5 8 (2 + (4 *5) + 8) / 6 = 5 CD 5 7 9 (5 + (4 *7) + 9) / 6 = 7 CE 4 5 6 (4 + (4 *5) + 6) / 6 = 5 DF 2 4 6 (2 + (4 *4) + 6) / 6 = 4 FG 3 5 9 (3 + (4 *5) + 9)…
building and construction management
. . p.13 EXECUTIVE SUMMARY An analysis of an expansion project on a residential house is described. The project’s compliance with civil and neighborhood regulations pertaining to the proposed changes is put into perspective. An account of the technical specifications of the proposed changes is included, with detailed explanations of the context for the proposed expansion based on accepted…
Construction Cost Control & Management
The length of the lodge is 14 meters and the width is 10 meters. The rear roofing will not be excavated. The perimeter area that is to be excavated is the outer 2m width, and the depth will be 2.75 m. On the first day at the site, only the excavator and the driver will be present since the only work on that day will only involve digging up the ground. The material extracted is of poor quality and…
Development Process in Construction Management
Hill & Jones (2009) explains a strategy to be a set or related actions that managers have to employ to increase the performance of their projects or companies. A strategy that would result to superior results as compared to the market practices would end up achieving a competitive advantage in the market, and such advantage would result to profitability, efficiency and effectiveness in the…
Construction Management
Different sizes of projects require different services, and so before one makes a decision on the system to use to require the services, size is one of the basic things to consider. This report is about the construction project that we undertook. Being the four of us, each member was given a different role and each member had to closely work together with the other members of the group in order to…
Sustainable Construction, Management and Professional Studies
Moreover, there is also need to ensure that the repair works goes on well in accordance to the design. These expectations will actually be guided by the contracts between Uxbridge Water plc and the designer as well as the contractor for repair works. Consequently, this report outlines the procedure that will be used during the procurement and contract matters for the repair works. Procurement…
BIM and Construction management
The models created through BIM can be accessed by all concerned sides in the construction process for any adjustments or decision making in regard to how the construction work is to continue, how the building or facility will be used and if need be how demolition for the same will be done. It goes beyond the 2 dimensional representations of buildings on paper as plans, sections and elevations; and…