BIM IN KNOWLEDGE MANAGEMENT WITHIN CONSTRUCTION INDUSTRY IN UAE K. PRABHAVANAND Reg. No. H00119665 MSc (Construction Project Management) School of the Built Environment, Heriot-Watt University Year of Submission: August 2012 DECLARATION I, K. Prabhavanand confirm that this work submitted for assessment is my own and is expressed in my own words…

Extract of sample
BIM in Construction and Knowledge Management within Dubai

Any uses made within it of the works of other authors in any form (e.g. ideas, equations, figures, text, tables, programmes) are properly acknowledged at the point of their use. A full list of the references employed has been included. ...
Download paper
Not exactly what you need?

Related Essays

Construction Cost Control & Management
The length of the lodge is 14 meters and the width is 10 meters. The rear roofing will not be excavated. The perimeter area that is to be excavated is the outer 2m width, and the depth will be 2.75 m. On the first day at the site, only the excavator and the driver will be present since the only work on that day will only involve digging up the ground. The material extracted is of poor quality and will be deposited in a pit far away from the site. The material is to be transported to a pit 8 km away by 20 tones capacity lorry. The number of lorries to be used during excavation period are two,…
10 pages (2510 words)
Management styles within the cultures of UK- and Iran-based construction joint ventures
Case Study) 27 Chapter 6 - Presentation and Discussion (Semi Structured Interview) 30 Chapter 7 – Recommendations 33 Chapter 8 – Conclusion Limitation and Future Research 34 8.1 Conclusion 34 References 36 Bibliography 41 Appendix – Semi Structured Interview Questions 44 LIST OF TABLES & FIGURES Table/Figure Page No. Cultural Differences between Iran and UK 13 Culture Comparison of Iran and UK 13-14 Comparative chart from the case study 24 Similarity Chart from the case study 24 Abstract The management style adopted by a firm plays an indispensible role in the success of that firm.
46 pages (11546 words)
Integrated Building Information Modelling (BIM)
According to RIB Software (2009, 1) globalization has brought new players to the table, to negotiate and find ways through which they have to maneuver through complex and increasing demands and projects that make it harder to communicate with partners, vendors and customers. As the financial environment become tougher, there is a need to focus on the right projects, control costs, and make accurate, feasible estimates in projects and manage the projects effectively and efficiently. In short BIM seeks to speed up the estimate time of projects and reuse the estimate information, facilitate the…
6 pages (1506 words)
Construction Management
Different sizes of projects require different services, and so before one makes a decision on the system to use to require the services, size is one of the basic things to consider. This report is about the construction project that we undertook. Being the four of us, each member was given a different role and each member had to closely work together with the other members of the group in order to succeed. Negotiation was very important in the whole process as every member of the group had to convince the other three members of the group to sign the given roles assigned to each member. Since…
4 pages (1004 words)
BIM and Construction management
The models created through BIM can be accessed by all concerned sides in the construction process for any adjustments or decision making in regard to how the construction work is to continue, how the building or facility will be used and if need be how demolition for the same will be done. It goes beyond the 2 dimensional representations of buildings on paper as plans, sections and elevations; and gives information about a building in three dimensions in addition to other details like light analysis, building components and their properties, quantities of building including excavation and…
4 pages (1004 words)
construction management
The schedule may specify the specific roles for the unskilled and skilled. For instance, starting time can be set at 7am and ending at 5pm. Similarly, construction manager is required to consider the pay rate of overtime schedule. The major role of the unskilled workers involves preparation of construction material mix, timely. The superintendent is responsible in carrying out the activities as instructed by the construction manager and with the help of the project or center map. The function of the superintendent to perform close examination to ensure that, the laid daily schedule is followed…
4 pages (1004 words)
Building Information Modeling (BIM) For Sustainable Design
Introduction 29 5.2. Kiowa County School, Greensburg, Kansas 29 6. Results and Discussion 33 7. References 37 Building Information Modeling for Sustainable Design 1. Chapter One: Introduction 1.1. Impact of Building Construction on Environment Building construction is one of the oldest human activities on the earth. The proverb “necessity is the mother of invention” probably evoked in human talent for creating a controlled environment in order to moderate the effects of climate. Human beings constructed shelters to adapt themselves to a wide variety of climates (Encyclopedia of Britannica,…