StudentShare solutions
Triangle menu

Risk assessment plan - Math Problem Example

Not dowloaded yet

Extract of sample
Risk assessment plan

The paper tells that in coming up with a risk management plan, there are several steps involved. The first step is identifying the risk factors involved. In this stage, the event, probability, impact, contingency, reduction and exposure is established. The event simply means an act or incidence that might happen, probability defines the likelihood of an event occurring, impact is the consequence of an event happening. Mitigation happens to be how much the probability of an event may be reduced. Reduction is represented mathematically as the product of mitigation and contingency, whereas exposure is the result of reduction subtracted from risk. In the initial steps, the project's risk management team has to identify the risks as well as their probabilities and consequences. The risks and threats are then analyzed and a risk profile created depending on the consequence and likelihood of occurrence. The threats and risks that are involved in this project may be subdivide into three main categories based on the entity the most impact is felt. The divisions may be environmental, personnel and the public. The contractor may have to execute his task with the railway being in use. Rubble and materials used overhead are a threat to the public, while the running railway is a risk to the experts on the project. Using the profiling, collapse of the bridge during construction may be catastrophic, yet rare thus falling in the high-risk category of the assessment profile. Probabilistic risk analysis (PRA) or quantitative risk analysis (QRA) or probabilistic safety analysis (PSA) is one of the most used methods of analysing risk in project development and operation (Bedford & Cooke, 2001, p. 210). The use of this technique supports and validates the improvement of control and mitigation measures against threats. Incorporating probability in the project risk management gives the problem a wider scope and allows the stakeholders a better grasp of uncertainty and the need to improve on the risk control measures chosen for a given project. Incorporating probability in the development process allows in the assessment of what may happen, its likelihood and the possible consequences in the case of its occurrence. The works of Kaplan and Garrick in defining uncertainties and risk in mathematical terms aids in programming. The definition of risk as a set of scenarios Si, each with a probability Pi and a consequence Xi, generate a risk curve based on the increase or decrease in severity (Goodwin & Wright, 2003, p. 49). From this, programmers can assess inputs through the variations of the severity, consequence and frequency. The Scenario represents the probabilistic sample space in which event is contained (both favourable and unfavourable) each with a chance of occurring. However, in the probabilistic equations, the chances might be equal or biased; in the risk, assessment equality of the scenarios is hard to come by. The chances of occurrence in pure probability are equated to frequency in risk management. The ideology behind introducing the probability of frequency allows the risk analysis to be conducted based on empirical data. If a given project, in a given period, suffers a number of threats and risks the probability of a certain threat can be equated to the number of times it has ...Show more

Summary

The research will start with the risk assessment plan outline. In risk analysis, the probabilistic impact sources from decision-making. From the profiling, assigning the risks and threats mathematical equalities is important for calculating the risks…
Author : fdeckow
Risk assessment plan essay example
Read Text Preview
Save Your Time for More Important Things
Let us write or edit the math problem on your topic
"Risk assessment plan"
with a personal 20% discount.
Grab the best paper

Related Essays

Capital Budgeting: Math Case Study (Answering questions)
1. From the given data, it can be seen that Project ‘p’ has a higher NPV as compared to Project ‘q’. Hence, if NPV is chosen as the criterion, Project ‘p’ must be preferred. However, it is also seen that Project ‘q’ has a higher IRR. Thus, form IRR point of view ‘q’ is the preferred project.
7 pages (1750 words) Math Problem
Return on Financial Assets
List the bonds in the most likely order of the interest rates (yields to maturity) of the bonds from highest to lowest. Explain your work. Answer: X: A corporate bond rate BBB  W: A corporate bond rate AAA  Y: A corporate bond rated AAA with a shorter time to maturity than bonds W and X  Z: A corporate bond rated AAA with the same time to maturity as bond Y that trades in a more liquid market than bonds W, X, or Y  There has always been a strong relationship between the risks attached to a security with the return earned on a security, and this risk-return trade off tells us return which one should expect on a security which has high level of uncertainty (high risk) or low level of uncer
4 pages (1000 words) Math Problem
A Study On Cigarette Smoking Among The Teen Population
Thousands of people die each year of diseases related to their smoking. Smoking is the biggest cause in those diseases, ahead of diabetes, obesity and lack of exercise. Individuals begin their habitual behaviors early in their teenage years. There are a series of social and peer pressures which influence teens to try and become addicted to tobacco.
6 pages (1500 words) Math Problem
Dynamic Regression A Simulation Exercise
The above chart represents the stock performance of MOTOR and GPU. From the chart it is evident that returns have fluctuated over time whereby there are numerous peaks and troughs in the year 1976 to 1987, in 1979 and 1980 GPU had the lowest level of returns, however after the 1980 drop it is evident that returns rose sharply to its highest in the period considered.
6 pages (1500 words) Math Problem
Investments
Answer: No use of universe of managers can't overcome and the reason behind this is beta (systematic risk and the volatility depend on the market sentiment and use of universe of manager can overcome the internal performance of any company but not the market risk as this risk can be diversified but can't eliminated.
4 pages (1000 words) Math Problem
Not all security experts agree about the value of biometrics. Using the Internet research the topic of biometrics. What are its advantages and disadvantages Wh
1 pages (250 words) Math Problem
Fundementals of finance
The return on this combination of portfolio is measured by getting the weighted return for each stock and adding them; as apparent in the equation where wa is the proportion of stock a to the whole portfolio investment and ra is the expected return for it.
8 pages (2000 words) Math Problem
Corporate Finance Math Problem
The balance sheet showed that the assets of the company increased with the despite of increasing sales. Cash decreased because the company sold more of their products on credit rather than on cash, which can be observed by the growing number of Account receivables which manifested a figure of $0.632 million FY 2007, which were $0.35 million a year before.
8 pages (2000 words) Math Problem
Math Finance
As a result, investors cannot come up with a perfect hedging portfolio that does away with all the associated risks (Mishken et al. 2009). Some of the causes of incomplete markets are transactional costs, market resistances and portfolio constraints. Due to
1 pages (250 words) Math Problem
Get a custom paper written
by a pro under your requirements!
Win a special DISCOUNT!
Put in your e-mail and click the button with your lucky finger
Your email
YOUR PRIZE:
Apply my DISCOUNT
Comments (0)
Rate this paper:
Thank you! Your comment has been sent and will be posted after moderation