We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.

Analytical report based on an case study about IT project management - Essay Example

Comments (0) Cite this document
Summary
Table of Contents Introduction 2 Core failures of the system 3 No cards available 4 Cards not activated 4 Unavailability of the System to Accept Cash Transactions 5 No Code for Simple Water 5 Time taken to process transaction 5 Malfunctioning Of the Wireless Terminals 6 What are the learned lessons?…
Download paper
GRAB THE BEST PAPER
Analytical report based on an case study about IT project management
Read TextPreview

Extract of sample
Analytical report based on an case study about IT project management

The stadium had its international recognition and with its inauguration, it was to host five matches of Euro Championship. The stadium was surrounded by many larger sports complex and along with its own spectators. The stadium could provide gigantic clients and business to restaurants and bars. In this regard Casa XXI was contracted for catering services of restaurant, bars and of special events in the Alvalade stadium for the next fifteen years. Casa XXI was the resulting company with its three partners specifically created for Alvalade Stadium Complex. Casa XXI had immense experience of catering since decades. As per agreement Casa XXI got right to serve 9 avenues including Prestige, Corporate Club, Sports 21, Restaurant Casa XXI, Cafeteria, Cafe for employees, Lodges, Kiosks, Bars and walking sales persons. Managing and exploiting revenue from these avenues was not a piece of cake and neither Casa XXI was ready to go traditional. So, Casa XXI decided to go for a new electronic system which was an important innovation. This innovative system used pre-paid cards to pay for sales. These pre-paid cards had a unique serial number which was to be identified by a scanner. The scanner could examine the card status and recharge money to the card. Interesting aspect was its expiration in which card could be used many times. The main objective of this system was to get rid of the traditional cash system which was more time consuming. The new innovative system could serve many customers in shorter time hence productivity was expected to be enhanced. The innovative system used a central database to save information of all cards and sales. In this innovative system when a consumer made a payment by the card, the scanners were to track card holder’s information and money in the card. After which sale was to take place or the money could be debited accordingly. The system was further subdivided into two units. First unit was operated by the front office responsible for interacting clients while back office unit was specified for inventory management whereas information of both system was recorded on an external database. So, the expected target of this innovative system was to create a well-established electronic system of payment which could revolutionize the sales at Alvalade Stadium. Casa XXI massively publicized their innovative system hoping for a marvellous opening. Outsourcing is a common practice is nowadays business. Outsourcing may take place due to many factors. These factors may be business, political, technical or financial. In this case, Case XXI lacks the expertise regarding IT projects and systems. It has mainly been in food and catering business and such technical skill seems to be remote in the industry it works in, With a crucial event coming up, outsourcing the new innovative project had deem to be a good decision. Outsourcing has many advantages. Some of them include access to the required expertise easily, greater focus on core functions and risk sharing. Casa XXI have taken advantage of the mentioned advantages to great extent. It wouldn’t be easy to acquire the skill of the IT project easily and if they decided to each part of the project themselves they would no doubt have suffered in their core expertise, catering. Core failures of the system The innovative system was expected to bring stacks of productivity to Casa XXI but unfortunately the inauguration went against all anticipations and ruined ... Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Analytical report based on an case study about IT project management Essay”, n.d.)
Retrieved from https://studentshare.net/management/110173-analytical-report-based-on-an-case-study-about-it
(Analytical Report Based on an Case Study about IT Project Management Essay)
https://studentshare.net/management/110173-analytical-report-based-on-an-case-study-about-it.
“Analytical Report Based on an Case Study about IT Project Management Essay”, n.d. https://studentshare.net/management/110173-analytical-report-based-on-an-case-study-about-it.
  • Cited: 0 times
Comments (0)
Click to create a comment
CHECK THESE SAMPLES - THEY ALSO FIT YOUR TOPIC
Case Study Based Report - Performance Management
The system would primarily emphasise on the key operational staff which would include the area managers and the restaurant managers. This represents the top 20% of the operational staff in the organisation whose salary exceeds $60,000 per annum. The project tries to identify and bring forth the loopholes of the previous performance management system in the organisation.
8 Pages(2000 words)Essay
Analytical report on a current 'people issue' in the business news event as a 'case study you are required to undertake an
It analyzes the major HRM issues involved in organisations while drawing on the major theories and models associated with it. The project begins with a brief description about the news story. Then it applies the associated theories and models in real life.
8 Pages(2000 words)Essay
IT Project Management, case study business report
The country has witnessed poor health statistics, such as the increased number of chronic diseases and health inequalities. The health department identified that the use of information technology could help them to fight with their issues. For this purpose, Scotland launched a new e-health strategy, directed by the Cabinet Secretary for Health and Wellbeing.
6 Pages(1500 words)Essay
Proposal for the analytical report
State College, PA 16801 October 10, 2012. Professor Jim Ausherman 3 Scott Building State College, PA 16801 October 10, 2012. Professor Jim Ausherman 3 Scott Building University Park, PA 16802 State College, PA 16801 October 10, 2012. Dear professor, I hereby write to seek your approval to write a formal report on the topic, ‘Relative Significance of Internal Controls in Preventing Accounting Fraud.’ The report seeks to establish a framework for a rational approach towards selecting internal control mechanisms.
4 Pages(1000 words)Essay
Case Study Based Report
on stage 13 Growth stage 14 Maturity Stage 14 Decline Stage 14 Conclusion 15 References 16 Bibliography 16 Introduction In the world of consumer electronics, copy cat brands are in abundance. Consumer usually buy products belonging to such brands when they do not want have to pay higher prices required to buy products of reputed brands.
10 Pages(2500 words)Essay
Project Management
Here we also conduct cost reviews and audits for the insurance of proper cost control. 11 Project management looks for to predict and deal with doubts that intimidate the objectives and schedule of a project. The risks can encompass problems of parts, quality, and material;
10 Pages(2500 words)Essay
Analytical report of a case study-Operation Management
It has also been observed that the company is strangulated by constrains of fund and space. Investable funds have become scarce because of the primary reason that the company had to spend substantially to bag a dealership contract. However, the
9 Pages(2250 words)Essay
Case Study Based Report - Performance Management
The project tries to identify and bring forth the loopholes of the previous performance management system in the organisation. Based on the drawbacks, a new system is developed. The impetus for the new system of
8 Pages(2000 words)Essay
Analytical report based on an case study about IT project management
The stadium was surrounded by many larger sports complex and along with its own spectators. The stadium could provide gigantic clients and business to restaurants and bars. In this regard Casa XXI was contracted for catering services of restaurant,
15 Pages(3750 words)Essay
Project management
agers conduct a strategic analysis for identifying the opportunities in the market, then if they find any gap between its actual and desired situation, some initiatives are suggested. So, they select those projects that are in line with the strategic objectives (Olson, 2004).
15 Pages(3750 words)Essay
Let us find you another Essay on topic Analytical report based on an case study about IT project management for FREE!
Contact us:
+16312120006
Contact Us Now
FREE Mobile Apps:
  • About StudentShare
  • Testimonials
  • FAQ
  • Blog
  • Free Essays
  • New Essays
  • Essays
  • The Newest Essay Topics
  • Index samples by all dates
Join us:
Contact Us