contractor case study - Essay Example

Only on StudentShare

Extract of sample
contractor case study

entertainment consent/trading hours).
In reply to our correspondence with the Liquor and Gambling Commission, we were told that alcohol will not be sold or supplied to intoxicated persons or persons under the age of 18 years and we should ensure the safety and comfort of those attending the function by not permitting overcrowding in any area. We were also asked to display the limited license in a prominent position during the whole of the function.
Lastly we were asked to nominated person(s) to take responsibility for the sale, consumption or supply of liquor during the function i.e. the applicant or nominated person organizing or taking control of the function, must be present at the function at all times when liquor is being sold, consumed or supplied. (Office of Liquor & Gambling Commissioner 2003, Government of South Australia)
The event will officially start at 7pm on the 14th of May 2008, first featuring the performance by the dance troop, then we shall be having a break for food and drinks the evening will end with the broadcast of "Bourne Supremacy" at "OpenAir Cinema", Mrs.Macquaries Point from 9pm to 12 pm.
All Time Securities success is driven through innovation and customer satisfaction. ...
Download paper

Summary

Outline of the event in Brief: The event will consist of one medium size covered stage, with administration and security huts, backstage, dressing room and VIP area for the live band and guests, security barriers, ticket booths, all for 1700 attendees. There shall be barbeque, food-drinks, and dancers on stage, then an action packed movie: The Bourne Supremacy.
Author : nedraokuneva

Related Essays

Case study Case Study
An order for specific performance of the contract was appropriate because of two reasons: 1) the Wirraway was not at the time in flying condition, and 2) the plane was in a hangar owned by a third party.
...
6 pages (1506 words) Case Study
critical thinking case study
1. Kelly Thomas is of the view that Pat Lambert should not be assigned leadership since she doubts Pat's ability to lead. Kelly assumes that Pat doesn't possess the qualities required to lead "Operation Optimize" since Pat has irrelevant previous experience in a cereal industry.
...
4 pages (1004 words) Essay
Technology Studies Case Study
It is no surprise that moisture is one of the main dilemma of the hotel maintenance department because UK copes up with something like 25,000 gallon of water annually. Nearly all moisture problems are much less severe than they actually look. Moisture can be very dangerous to our health. It can intensify respiratory problems and it can even encourage mites and moulds to grow. The properties of moisture can be very serious and even makes the whole surrounding cold and unpleasant to see. Moisture can be anywhere. They could be on the roof, on the walls, on the floors, windows, doors and...
18 pages (4518 words) Essay
Case Study Investing in Back Bay-Beacon Hill
His skill in developing properties is limited to 3 years of carpentry, designing and building sets for Harvard's Hasty pudding Show. However, he has spent numerous hours learning about the field through the Internet, magazine subscriptions, talking to brokers, and inspecting properties in the area.
...
3 pages (753 words) Essay
Employment Law - Independent Contract Case Study
The IRS defines an employee using existing common-law rules (IRS P-15a 4). The IRS maintains that it makes no difference how you label the relationship because the relationship between the employer and the person performing the service defines the relationship (IRS P-15a 4).
...
4 pages (1004 words) Essay
commercial case study
The client in these contracts has no long term liabilities to the independent project manager who can be dispensed with if he/she fails to meet the terms of the contract. Moreover, the independent project manager can be compensated using a variety of payment mechanisms, the details of which have been presented in the report.
...
6 pages (1506 words) Essay
Construction Delay Claims How a Contractor can effectively achieve an extension of time or schedule adjustment for Employer/Engineer caused delays under FIDC Red book.
When such time related conflicts come into picture, both the parties try to impose their losses through claiming against the other party.
...
48 pages (12048 words) Essay
Got a tricky question? Receive an answer from students like you! Try us!