We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Nobody downloaded yet

On-site water - Assignment Example

Comments (0) Cite this document
Summary
Among the several resources gifted to us Water is one of the principal factors that govern life on this planet. The water resources in the modern day periods are facing huge constraints…
Download paper
GRAB THE BEST PAPER

Extract of sample
On-site water

In context of developing and underdeveloped nations it is often seen that public supply of water is impaired by structural problems emerging within the social fabric. In order to rectify such malfunctioning in water distribution system that the governance of a host of public resources has been transferred to the hands of the private sector. The public resources transferred to private hands also stands for the transfer of water resources. Water Resources though are economic goods also have social values. In the light of changing environment and population growth water resources needs not only to be properly managed but also to be effectively organized for bettering up of life standards. (Ocal & Dogan, n.d.)
To understand the problems arising from the mismanagement of water resources the paper tries to focus on water distribution and supply management in context of developing economies like India. The Indian economy has the potential to be an agrarian economy. In the last few decades the development of agriculture has helped to make India self sufficient in terms of food grains. The development of agriculture in the country can mostly be attributed to the development of irrigation activities. Public demand for water is not only restricted to agricultural activities. Rather, it is observed that the demand for water in non-agricultural framework is increasing rapidly. The water-laden regions of India can be categorized into 19 essential drainage basins, according to their per capita water supply. The demand for water also is seen varying by the side of these riverbeds. A statistics reveal that the valley of river Indus and Ganga share 48 percent of the total population of India. The water drawn from these sources is mainly used for agricultural purposes. (Amarasinghe, N.D., p. 6). It is in this light that the paper tends to highlight on points like the trends of water usage, demand for ... Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“On-site water Assignment Example | Topics and Well Written Essays - 2500 words”, n.d.)
Retrieved from https://studentshare.net/miscellaneous/406245-on-site-water
(On-Site Water Assignment Example | Topics and Well Written Essays - 2500 Words)
https://studentshare.net/miscellaneous/406245-on-site-water.
“On-Site Water Assignment Example | Topics and Well Written Essays - 2500 Words”, n.d. https://studentshare.net/miscellaneous/406245-on-site-water.
  • Cited: 0 times
Comments (0)
Click to create a comment
CHECK THESE SAMPLES - THEY ALSO FIT YOUR TOPIC
Advising the client,site and location analysis
Designing a sustainable factory is important due to the significant consumption of raw materials, resources, and energy involved in industrial manufacturing as well as the significant emissions of pollutants and greenhouse gases (Holcim, 2008). To achieve this, the designers of MAS Intimates Thurulie focused on environmental as well as social aspects relative to the company’s function and the employees that work there.
9 Pages(2250 words)Assignment
On-Site Executive MBA Program
The school would be offering, a lot of courses and a variety of subjects to the students all across the world. These courses would be taught by the world class faculty. The lectures would be delivered online.
7 Pages(1750 words)Assignment
Site management
The project management team gives greater emphasis on Health, Safety, and Environmental (HSE) demands as they largely contribute to the quality of project development. This paper will explore the role of different personnel in enabling and maintaining a safe working environment.
4 Pages(1000 words)Assignment
Site layout on a confined site
The experienced project manager will incorporate some expectation of overruns in terms of cost and time into the assessment of the project and its associated budget. The competent manager understands the material realities of the project; he or she knows how much of what materials should be used under what circumstances, and in what order.
8 Pages(2000 words)Essay
COPPER ORE CONCENTRATE SITE OPERATIONAL AND LOGISTICS RISK ASSESSMENT - (DESK BASED REVIEW)
..................................................................................3 2.2 Cargo Safety Measures……………………………………………………………………….4 2.3 Checklist of Responsibilities…………………………………………………………………6 3.
25 Pages(6250 words)Assignment
Health and safety plus risks on the site
2 Pages(500 words)Assignment
Water pollution
Many developed countries have concentrated industrial cattle farms to minimise land use. Several densely-populated developing countries in Asia e.g., China, where meat
9 Pages(2250 words)Assignment
COPPER ORE CONCENTRATE SITE OPERATIONAL AND LOGISTICS RISK ASSESSMENT - (DESK BASED REVIEW)
The 1st phase of the concentrator started on August 15, 2013. The very next month, in September 2013 it entered into the production of copper-gold concentrate, leading to the first truckload consignment of
25 Pages(6250 words)Assignment
Mine water and mine waste management
to make sure that contaminated water has no opportunity in reaching clean water during the full term of the mining project, as well as after the mine has closed down (Mining Fact, 2014; Mining Facts, 2014a). Containment of mine water and mine waste products requires a two-art
25 Pages(6250 words)Assignment
Water Shortage in New Zealand
The elaboration had been done on the way the data is collected and the sources from where it was obtained. Apart from this, the survey related to the data collection is laid down in the methodology section. The water restriction, metering and charges levied on the territorial population have been a major subject in the methodology section.
6 Pages(1500 words)Assignment
Let us find you another Assignment on topic On-site water for FREE!
Contact us:
+16312120006
Contact Us Now
FREE Mobile Apps:
  • About StudentShare
  • Testimonials
  • FAQ
  • Blog
  • Free Essays
  • New Essays
  • Essays
  • The Newest Essay Topics
  • Index samples by all dates
Join us:
Contact Us