The paper "Masters Level - Project Management in Construction" states that the absence of time and resources in the planning stage of a project will only lead to bad decisions that will heighten existing risks and would expose the project to more risks. …
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER91.6% of users find it useful
Masters Level - Project Management in Construction
Read Text Preview

Extract of sample "Masters Level - Project Management in Construction"

Download file to see previous pages

Speculation continued as to how the English Channel could be bridged to allow simplified transport of goods and people. Ideas ranged from a network of bridges connected by artificial islands in the English Channel to a tunnel beneath the sea. However, these ideas remained a distant reality given the technological challenges posed by such a project. Nonetheless, speculation thrived on the issue, especially throughout the sixties and the seventies. It became clear that the only viable method of bridging Great Britain to mainland Europe was a tunnel under the sea. The idea seemed simple at first. The project required the boring of three distinct tunnels from one side of the English Channel to the other. Tunneling or more specifically boring had been carried out extensively even before the Channel Tunnel project so technical expertise was available on the issue.

One thing that was noticeable about the Channel Tunnel project up front was the fact that boring had never been taken up on such a massive scale before this project. While the Channel Tunnel project can be seen as a major achievement in terms of technical progress, by any other measure, it has been seen as a pure project management failure. There is little doubt in anyone’s mind that the Channel Tunnel project was less than a Pyrrhic victory. The initial cost for the project was estimated at some £3.

5 billion but the eventual execution cost the project team some £9 billion. There was little change in the overall scope of the project but there were myriad changes in the details of the project scope. It was decided initially that the Channel Tunnel would consist of a 32-mile (51.5 kilometers) tunnel under the sea to serve two railway links separately. These two main railway tracks under the sea would be supported by a smaller tunnel in the middle of these tunnels to service shuttle trains carrying vehicles.

Once construction commenced, it became apparent that air conditioning was more of a necessity than an auxiliary for the project. 

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Masters Level - Project Management in Construction Essay”, n.d.)
Masters Level - Project Management in Construction Essay. Retrieved from https://studentshare.org/miscellaneous/1599627-masters-level-project-management-in-construction
(Masters Level - Project Management in Construction Essay)
Masters Level - Project Management in Construction Essay. https://studentshare.org/miscellaneous/1599627-masters-level-project-management-in-construction.
“Masters Level - Project Management in Construction Essay”, n.d. https://studentshare.org/miscellaneous/1599627-masters-level-project-management-in-construction.
  • Cited: 0 times

CHECK THESE SAMPLES OF Masters Level - Project Management in Construction

Technical Solutions to Ensure the Building Is Energy Efficient and Consistent with the Planets Ecosystem

The paper "Technical Solutions to Ensure the Building Is Energy Efficient and Consistent with the Planets Ecosystem" states that carbon dioxide emission is associated with the practices that employ the use of electricity, gas and other fuels in running plants and auxiliary construction machines....
9 Pages (2250 words) Research Paper

Project Performance and Control on the London 2012 Construction Programme

PROJECT PERFORMANCE AND CONTROL ON THE LONDON 2012 By Institution Date Project Performance and Control on the London 2012 The London 2012 Construction Program remains a model of success in construction and architecture due to the various factors that combined to contribute to its efficiency.... The overall performance of the program is indicative of the accuracy of methods employed, the appropriate estimations, and the quality of controls and management systems employed before and in the course of the construction....
4 Pages (1000 words) Essay

Construction Management Portfolio

The report present here consists of detailed explanation on key management portfolios that are necessary in a large sized construction management operations.... Thus this report would help to get comprehensive information on the different managerial operations that are very vital to any construction management operation.... arson and Toubro is one of the most respected companies in the South Asian region having expertise in the domains of technology, engineering, construction and manufacturing (Larson and Toubro, n....
17 Pages (4250 words) Case Study

The Structure of Construction Project Management

The purpose of the current assignment is to describe the project management techniques applied in the construction industry.... Furthermore, the assignment will address the common management issues associated with the design, construction, procurement, and manufacturing processes.... The traditional method of procurement (also known as conventional procurement) is by far the most common and involves the separation of the design and construction stage of a project....
6 Pages (1500 words) Assignment

Sustainable Construction

It is not surprising that people who are members of the housing construction sector are always on the look out for new ways on how improvement can be continuously integrated in the sector.... As the two reports dwell on the apparent underachievement of the construction industry, both have shown that there is an alternative means that can surge forward the house building industry and global competitiveness.... The key is the application of the basic principles of lean production to the construction industry in the United Kingdom; ....
39 Pages (9750 words) Dissertation

Supply chain management in the uk construction Industry

The Association of Operations management has defined ‘supply chain' as “the global network used to… eliver products and services from raw materials to end customers through an engineered flow of information, physical distribution and cash” (Council of Supply Chain management Professionals, n.... Supply chain management (SCM) has been one of most investigated areas in the According to the Council of Supply Chain management Professionals (CSCMP), “supply chain management encompasses the planning and management of all activities involved in sourcing and procurement, conversion and all logistics management activities” (Council of Supply Chain management Professionals, n....
12 Pages (3000 words) Essay

Autonomous Development: The Choice of Materials

hellip; According to De Leonardis (2011), Choosing the appropriate procurement method is of significant importance for the realization of the construction's objectives.... Nowadays numerous buildings are expected to accomplish the Leadership in Energy and Environmental Design (LEED) ratings when construction.... A procurement policy establishes a contractual outline that adjusts the wants of the contractor and owner with the single aim of conveying a successful project....
9 Pages (2250 words) Coursework

The Role of Communication in Managing the Critical Interface Between Design and Construction

This assignment "The Role of Communication in Managing the Critical Interface Between Design and construction" discusses the interface between design and construction to attain the owner's expectations.... xample of Owners ExpectationThe owner's expectation is then subjected to the project life cycle as highlighted below;The interface between design and construction is therefore aimed at attaining the owner's expectations.... second reason and importance of the interface between design and construction is the aspect of value addition....
24 Pages (6000 words) Assignment
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us