This will allow calculations of the response to any input(rainfall). Hydrographs are often affected by factors of soil saturation and the surroundings. The vegetation type and the steepness of the surrounding lands, with the drainage density. Very dry weather, normally creates a crust on river beds and wet winters would increase the discharge. Sand and clay produces a flashy hydrographs but there could be a difference between the two.
In the analysis of the graphs, the bar graph would indicate that the amount of rainfall in the river would cause the river water to rise. We can notice that there is almost a steady flow of water until after a rainstorm. The amount of rainfall is indicated in the bar graph while the rise of water in the river is indicated in the line graph. As the water rises in the river, the height of water is recorded, and the amount of rainfall is computed. Normally the rise of water in a river occurs after a storm rainfall. The discharge is measured at a certain point in a river and is typically time variant. As the line graph is plotted, the part of the hydrograph rises up to its peak and the discharge is seen. The term given to this process in the hydrograph is the rising limb. The decrease of water discharge comes after the rising limb and it is defined as the falling limb. ...
Download paper

Summary

In the study of storm drainage, the analysis of hydrographs are important. A hydrograph plots the river discharge as a function of time. Measurements are done at a certain point in a river. Rainfall is the input used to a watershed and the stream flow is also considered as the output of the watershed…
Author : laruelehner

Related Essays

Storm Drainage Design Project Master Essay
Dry weather or dry season, normally creates a crust on river beds and wet winters would increase the discharge. The results of hydrograph readings would determine the design of a storm drainage
...
8 pages (2008 words) Essay
Design Project in UK
The location of the project is taken to be on the Victoria Street much before joining the Temple Way on the Northern side of the road.
...
8 pages (2008 words) Assignment
Storm Drainage Design Project Assignment
A peak rainfall and peak discharge are two different graphs. Lag time is the term for the difference between the peak rainfall from the peak discharge. There is a little chance of flooding if the value of the lag time is great. A lag time that is short will show that water had already reached the river channel at a fast rate. The rise in the discharge shown in a graph is called the rising limb, whereas the decrease in the discharge is called the falling limb.
...
6 pages (1506 words) Assignment
Storm Drainage Design Project
There is less chance of flooding if the lag time is great. A short lag time will indicate that water had already reached the river channel at a fast rate. The rise in the discharge shown in a graph is called the rising limb, whereas the decrease in the discharge is called the falling limb.
...
6 pages (1506 words) Assignment
Storm Drainage Design Project Master Assignment
Subsequently, irrigation was developed as the need to channel the river's flow arose in order to sustain the crops and livestock. The ancient nomadic nature of man changed to a domesticated one: no longer was there a need to hunt for food. In these modern times, much headway has been made in harnessing the full potential of rivers. For instance, there is now a storage and systematic distribution of potable water from rivers through dams, reservoirs, pumps, and piping systems. Further, irrigation systems are now utilized to nourish plantations and livestock. The destructive nature of rivers in...
6 pages (1506 words) Assignment