Project Management Strategic Issues Essay example
Ph.D.
Essay
Engineering and Construction
Pages 12 (3012 words)
Download 0
Project Management Strategic Issues: Construction of Szkieletor (Name) (University) (Course) (Tutor) (Date) Table of Contents Table of Contents 2 Introduction 3 About the project 3 Reasons for project failure (cost increases encountered during the project) 5 Problem of administrative personnel 6 Miscommunication and coordination 6 Role of project management 7 Role of project managers 8 Analysis of Operational project management actions 9 Strategic project management 9 Strategic project management actions 9 Conclusion 12 List of References 14 Introduction The following report provides detailed findings which are fully analysed to assess role of operational management in the construction indust…

Introduction

Projects fail due to various barriers that emanate from internal organization as well as from external sources. However, the role that a project manager plays in the project process matters a lot. The report provides an analysis of actions to be taken by strategic project management which can enable planning and completing construction process in time and within set cost targets. A brief conclusion is provided touching on key lessons that project management can learn from experiences in the project. About the project Szkieletor also known as Skeletor is an incomplete building in Poland. It is located in the sides of Krakow near Rondo Mogilskie. The building stays incomplete in its construction since 1975. It is one of the tallest structures around and it was intended to be headquarters of the main Technical Organisation. The reasons for the incomplete building construction are a result of deterioration of the economy and high costs of construction materials. ...
Download paper
Not exactly what you need?

Related papers

Project Management
Before the industrial revolution, training in artisanship was associated with manufacturing and was significant in developing new artisans. Since the 18th century after the industrial revolution, many ideas emerged to enhance the manufacturing process, not withstanding the type of goods produced. This paper describes the historical processes that have shaped manufacturing over the last century…
Wembley Stadium – Project Management Strategic Issues
It increased the projected costs to more than double the earlier projections. Especial about the Wembley Stadium is its innovative steel arch that adds to the beauty of the Stadium. The steel arc also endures weight and reduces the need for internal support that could have come in the way of viewers sitting in the stadium. The load bearing feature of the arc adds decorum to the seating…
Value Management/ Value Engineering
The aspect of VM operates under a well structured schedule of process. This allows the functional needs and alternative resolutions, linked with their costs to be recognized and incorporated to strict timetable (Pinto 2008, p. 128). 2. Defining the Concepts Value management is different from value engineering in that value engineering entails attaining specific functions at reduced cost or…
Construction Project Management (International projects. An analysis of about six construction projects which take place in two
Otherwise chances are high that if only the typical constrains of project management are considered, projects may not meet they objectives with these constrains. The problem becomes worse when a project is jointly undertaken by two nations. The purpose of this paper, therefore, is to analyze not more than six construction projects undertaken in two nations in order to identify factors that may be…
Project Management,
The involvement of the other tenderer that would assist to reduce the gap between the tender and the budget by offering a better solution out of experience from working with different types of tendering items. The tenderer can give directions of acquiring cheaper tools. At the same time, the tenderer can promise to offer a cheaper tender for the same contract. If there is a significant discrepancy…
Critical approach in project risk management
As Wrona (2010, p. 1) states, “companies that do perform a risk management process on a fairly typical multi-month project (no longer than 12 months) will identify and manage possibly five to ten easily recognized project risks”. This statement shows that doing comprehensive risk analysis regularly at each stage of the project can reduce the occurrence of risks and make companies able to…
Value & Risk Management
Value drivers can be defined as elements within a project which improve the product quality, and also minimise costs. These drivers become essential during project management as they provide assistance to auditors on possible value adding elements. The utilisation of value drivers remains fundamental to successful completion of many development projects, within the construction industry. These…