To do activity on arrow network plus a chart and small questions - Essay Example

Cite this document
Summary
That occurs in the first ten weeks when activity A and B are taking place concurrently and from week ten to week 20 when activity A, D, E and F are running simultaneously.
Since activity A has duration of…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER94% of users find it useful

Extract of sample "To do activity on arrow network plus a chart and small questions"

Download file to see previous pages

The rest remain unchanged. Where staff are not interchangeable or the project involves more than one type of resources, resource scheduling becomes complex. It becomes necessary to smooth, within the same schedule, each category of resources separately. Leveling would be very difficult and the decision on the optimum would depend on the judgment of the project manager. The minimum completion time for this project is 45 weeks. The critical paths involve activities BCE and BCG. Any delay on any of these activities would lead to a delay in the overall project.

Activities A, D and F have float. There may be delays or expansions on the activities, to the extent of the floats, without affecting the finish time for the project. Apart from the finish-to-start dependencies, an activity-on-node also represents other dependencies. The dependencies include Start-to-Start dependencies, Finish-to-Finish dependencies as well as Start-to-Finish dependencies (Field and Keller, 2007, p.199). A Finish-to-Finish dependency requires that one activity has to finish for the second activity to finish.

The two activities may finish simultaneously. The Start-to-Finish dependency requires that the first activity should start before the second activity can finish (Field and Keller, 2007, p.200). In a Start-to-Start dependency, the start of one activity depends on the start of another activity. The second activity cannot start is the first is yet to start. For example, painting a wall would require the cleaning of the wall first. Applying a first coat of paint on the wall cannot therefore start unless cleaning of the wall has taken place.

The two activities may run simultaneously but after the cleaning has

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“To do activity on arrow network plus a chart and small questions Essay”, n.d.)
To do activity on arrow network plus a chart and small questions Essay. Retrieved from https://studentshare.org/management/1699468-to-do-activity-on-arrow-network-plus-a-chart-and-small-questions
(To Do Activity on Arrow Network Plus a Chart and Small Questions Essay)
To Do Activity on Arrow Network Plus a Chart and Small Questions Essay. https://studentshare.org/management/1699468-to-do-activity-on-arrow-network-plus-a-chart-and-small-questions.
“To Do Activity on Arrow Network Plus a Chart and Small Questions Essay”, n.d. https://studentshare.org/management/1699468-to-do-activity-on-arrow-network-plus-a-chart-and-small-questions.
  • Cited: 0 times

CHECK THESE SAMPLES OF To do activity on arrow network plus a chart and small questions

Email Tracking And News Posting Tracking

Secondly, carding and phishing describe how fraudsters operate in small and secret channels.... News postings are bulletins for everyone in the network to see.... They are useful because they inform friends in the network service without resorting to sending messages individually.... News postings have group link features that enable the use to sign up until the time when her network shall be back.... They code their messages to prevent people who may come across, and discover their network....
3 Pages (750 words) Essay

Creating a Neural Network Using EasyNN-Plus

eural networks learn to carry out tasks and study data rather than directly being programmed to do so.... The paper "Neural Network" tells us about creating a neural network using EasyNN-plus.... nbsp;A Neural network is defined as an interconnected assembly of simple processing elements, units or nodes, whose functionality is loosely based on the animal brain.... hellip; The processing ability of the network is stored in the inter-unit connection strengths, or weights, obtained by a process of adaptation to or learning from, a set of training patterns....
10 Pages (2500 words) Essay

Gantt Charts and Network Diagrams

This assignment "Gantt Charts and network Diagrams" analyses the network diagram that is a management tool for assessing the path the various activities of a project needs to follow.... A network diagram is an indispensable tool during project implementation....
11 Pages (2750 words) Assignment

Small Business Activity

From the paper "small Business Activity" it is clear that on the SBA website, there is detailed information on the right documents one must have to begin a legal business.... The SBA website contains a lot of information on starting a small business.... These grants include the small business grant worth $1000 that is available to one who owns or is starting a business, Homeless providers grant that is available for a business that houses homeless people and the transitional housing assistance program grant....
1 Pages (250 words) Essay

WBS and Network Diagram

On the other hand, package code entails an item that indicates how the project may be subdivided into small manageable task (Meredith & Mantel, 2012).... A Gantt chart is a tool in project management that helps the users and project managers to view clearly the activities/task being undertaken as well as time that each activity is consuming.... The left side of the chart indicates the list of activities that need to be accomplishing in order to accomplish the overall project goals on timely basis....
4 Pages (1000 words) Assignment

Activity on Node Network Diagram

The techniques include the Quad Plot IV, Critical Ratio Control chart and Earned Value Chart.... In the paper “activity on Node Network Diagram” the author analyzes an activity on Node (AON) network diagram, which is initially developed to indicate the sequence of activities.... An activity on Node (AON) network diagram is developed to identify the sequence of the activities, as shown in Fig.... A Gantt chart is developed to correspond to the logic diagram, as shown in Fig....
3 Pages (750 words) Assignment

Difference between Gantt Chart and Network Diagram

This essay discusses Gantt chart and Network Diagram which critical tools in project management.... The Gantt chart is a graphical illustration of the calendar of events (activities) relating to the project.... They are used to schedule the activities to be performed....
5 Pages (1250 words) Assignment

Innovation in Society: Smart Shopping Mall Trolley

Introduction The smart shopping mall trolley also uses a small computer (PDA) that is installed on a shopping trolley.... The PDA uses a wireless network to connect to a central database that is updated in real-time allowing a shopper to access updated information (see Figure 2).... PDA interfaces with the EFTPOS through the wireless network for billing before a bill is printed out (PaymentExpress, 2013)....
6 Pages (1500 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us