StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

Construction method statement and risk assessment - Essay Example

Cite this document
Summary
The sequence of activities for the project shall begin with pre-execution activities, that involve planning and permissions.
Study of flow-rates, depth and volume of water…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER97.8% of users find it useful
Construction method statement and risk assessment
Read Text Preview

Extract of sample "Construction method statement and risk assessment"

Download file to see previous pages

(eg Designing river diversions with a series of pools to allow salmon to swim uphill despite damming of rivers in Alaska) CONCEPT: The next step is to submit the preliminary design to local authorities with a detailed report on contextual impact including Environmental impact for feedback by Government authorities and the local population who may have valid feedback regarding its impact on their lives. At this stage, all viable options to achieve the ends without this drastic intervention shall be weighed and discussed.

FINAL PROPOSAL: The final proposal shall be prepared on the basis of feedback received on the conceptual proposal, and submitted for permissions. The same proposal shall be priced and tendered out to ascertain budget. Communication to effected local populace on all aspects of construction that may impact their daily activities. This would include possible demolition schedules, changes to river traffic, increased heavy road traffic to and from project site, etc. The actual project execution begins after plant and machinery required has been finalised, human resource is on site and is trained, and complete documentation and drawings are available to begin work. B. Excavation of diversionary channel to depth including foundations and sidewalls.

Both ends shall be cast in-situ with metal gates in shut position. These gates will be opened permanently after channel is complete. D. As it is cheaper, faster, environmentally friendly, and a better qualitative output, the sections of the channel shall be cast off-site, and lowered over the dowels jutting out of the PCC on site. The exposed re-bars will be tied to dowel re-bars and concrete shall be poured to give a smooth inner finish to the channel. All elements to control water speed within the channel shall be cast as parts of the off-site modules and placed as required by design. 1. Cranes and

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Construction method statement and risk assessment Essay”, n.d.)
Construction method statement and risk assessment Essay. Retrieved from https://studentshare.org/miscellaneous/1554982-construction-method-statement-and-risk-assessment
(Construction Method Statement and Risk Assessment Essay)
Construction Method Statement and Risk Assessment Essay. https://studentshare.org/miscellaneous/1554982-construction-method-statement-and-risk-assessment.
“Construction Method Statement and Risk Assessment Essay”, n.d. https://studentshare.org/miscellaneous/1554982-construction-method-statement-and-risk-assessment.
  • Cited: 0 times

CHECK THESE SAMPLES OF Construction method statement and risk assessment

Risk Management: Failures and Defects in Constructions

Research Objective The main objective of this research is to come up with accurate information that will help in constructing a sensible framework that will help in risk evaluation, risk and safety management and risk control in the setting up of a mobile concrete construction project.... The main objective of this research “risk Management: Failures and Defects in Constructions” is to come up with accurate information that will help in constructing a sensible framework that will help in risk evaluation in the setting up of a mobile concrete construction project....
31 Pages (7750 words) Research Paper

Tank Leak

The Environmental Impact Of Soil Contamination: Bioavailability, risk assessment, And Policy Implications.... Loehr, " In the general risk-assessment paradigm, environmental risk is defined as the likelihood of injury, disease, death, or adverse impact resulting from human or environmental exposure (real or potential) to chemicals under site-specific circumstances.... The local agency responsible for the environment may have to be consulted to determine the magnitude and extent of risk of environmental contamination the leakage poses....
2 Pages (500 words) Personal Statement

Environmental Impact Assessment

hellip; risk assessment can be defined as 'the process of assigning magnitudes and probabilities to the adverse effects of human activities (including technical innovation) or natural catastrophes (Horlick-Jones et al.... 1] risk assessment is an important aspect of environmental Impact Assessment.... risk assessment and Impact Assessment deal with uncertainty.... sing the Environmental Impact Statements, the use of risk assessment as part of EIA is examined, drawing out the points the EIS should have covered....
8 Pages (2000 words) Essay

List and explain the three step risk analysis process and list resources

Purpura postulates critical thinking as the cognitive ability of analysis, the interpretation, the explanation and the evaluation of ones own reasoning, to even include ability to question ones conclusions and judgment in a continuous process of assessment (2008, p.... The survey is actually a questionnaire in the form of checklist to make sure everything is covered during the discussion and assessment of threats.... n this regard, there is a highly-recommended three-step risk analysis process that is to be followed in order to have a good grasp of the security situation....
1 Pages (250 words) Personal Statement

Discussion Questions #1 and #2

Comparative risk assessment and Environmental Decision Making (Vol.... As such, the method guarantees reliability.... This is a very important merit… Besides, the scientific findings are more accurate than any other method (Linkov & Ramadan, 2004, p.... This is because they are based on methodologies and procedures that ultimately conduce to the accuracy of the Discussion Questions And #2 and number) submitted) Benefits of using scientific method to analyze environmental decisionsThe scientific method adopts the use of factual and tested processes of ensuring that environmental decisions are made....
1 Pages (250 words) Personal Statement

Risk Management Assessment

nbsp;… The risk assessment plays a very important role in Environmental Impact Assessment.... risk assessment and Impact Assessment deal with uncertainty.... risk assessment can be defined as 'the process of assigning magnitudes and probabilities to the adverse effects of human activities (including technical innovation) or natural catastrophes (Horlick-Jones et al.... This report "Risk Management assessment" looks into the Risk/health assessment been used in Environmental Impact assessment and finds the potential for extending the use of risk/health assessment, taking two case studies drawn from different industrial sectors....
7 Pages (1750 words) Report

Effective Working Relationships in Engineering Construction

Employers with five or more employees need to record the significant findings of a risk assessment.... From this work, it is clear how to minimize risk in engineering construction, the requirements of health and safety legislation, powers of an inspector.... To work safely the employee should ensure:-The main requirement of the Management of Health and Safety at Work Regulations is that employers must carry out risk assessments to eliminate or reduce risks....
14 Pages (3500 words) Essay

Safe Work Method in Building and Construction

The author of the paper "Safe Work Method in Building and Construction" states that building and construction present potential risks revolving around the contamination of water supplies, pollution, and physical damages among many other risk factors.... lanning: It is essential for contractors to set up a construction phase plan that is geared towards ensuring that the construction of the two-story house is conducted without posing any safety or health risk to the workers and the people in the surrounding areas....
7 Pages (1750 words) Assignment
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us