StudentShare solutions
Triangle menu

Construction Practice - Essay Example

Not dowloaded yet

Extract of sample
Construction Practice

In different types of procurements, the level of risk that the owner has to bear also differs. The control of the owner over the entire project also differs with the change in the method of procurement. Considering the nature of the project and the specific requirements of the owner with, I would suggest the traditional method of procurement for the purpose of constructing the specified things in the old building as well as for the parking lot on the nearby plot.
The traditional form of procurement involves the appointment of a separate design team direct by the client. The team will develop the design in accordance with the client's design brief, arrange for a tender and subsequently administer the contract on site. The design and all the specifications should be completed in all aspects before the tenders from contractors are invited so that the owner can exactly understand the design and could make the desired changes as per the needs. The designer, who is specialised in the designs of architectural conservation and adaptive reuse of buildings, shall be able to comprehend the design exercise in a better manner and would there fore be able to provide appropriate design solutions that suit the structural requirements as well as the taste of the existing building. Adaptive reuse of a building requires specialised knowledge and there fore proper solution could only be achieved by appropriate designer.
Since the owner has specific design requirements for the parking lot in terms of its architectural character with reference to the old building, I also suggest that the building to be designed by a specified designer so that the owner can exercise greater control over the process of design in order to achieve the desired result.
For the construction purpose, a separate contractor can employed by the owner by being in consultation with the architect, to execute the design work which is normally under a standard joint contracts tribunal form of contract. Therefore in this case, the contractor and the design team shall be two separate bodies that are hired by the owner, both of them responsible to the owner. Here it is expected that the contractor exactly follows the instructions of the architect and in other words it can also be said that the architect is acting on the client's behalf to get the job completed effectively. The contractor quotes a lump sum amount for which he agrees to carry out the entire job. This also gives the client a control over the total budget of the project because once the quote is finalised, the contractor assumes the total risk of financial expenditures that are incurred during the construction part.






In case of other methods of procurement like 'design and build', he would have lesser control over the design part of the building because both the duties of designing and building are been performed by a single team. Also there are fewer chances that the design team, responsible for carrying out the design for newer developments, have good knowledge of redevelopment in terms of the structure and the architectural styles of the old buildings. Since there is no division of responsibilities for designing and construction on the site, it shall be comparatively challenging for the client to achieve the de ...Show more

Summary

Procurement is a method by which architectural services are commissioned. It deals with the entire life of the project beginning with the conception of the project up till its total completion and occupation. The various recognized methods of procurement include the Traditional Procurement Method, Design and Build, Construction Management Contracting or Design Construct and Manage…
Author : marielle19
Construction Practice essay example
Read Text Preview
Save Your Time for More Important Things
Let us write or edit the essay on your topic
"Construction Practice"
with a personal 20% discount.
Grab the best paper

Related Essays

Construction Management
The construction industry promotes a high degree of professional ethics in dealings between owners, architects, engineers and contractors. There is a need to establish shared values to ensure integrity in the bidding and contracting process which can develop a professional companionship.
3 pages (750 words) Essay
British Contemporary Construction Industry
Design evaluation is a dynamic process. However, constructability analysis should be performed at least at two important stages. Globally it is estimated that a third of the worlds population live in houses of earth construction. These are both modern and traditional and occur in most cultures and climates.
6 pages (1500 words) Essay
Construction
However, the "off-the-shelf" price of a building component represents only the manufacturing and transportation costs, not social or environmental costs. The Romans were the first to use metal as a major building material. The Pantheon had a bronze roof, parts of which survived until the middle of this century; Hagia Sophia originally had a lead roof that lasted 1400 years.
6 pages (1500 words) Essay
Waste Management in Construction Industry
The paper show the conditions and premises due to which the construction materials go to waste and to introduce viable alternatives in order to provide pollution prevention and waste minimization. This paper evaluates the environmental implications and resource conservation of using innovative materials as a source of construction rather than using the more polluting materials currently in practice.
13 pages (3250 words) Essay
Offsite construction
Pre-fabrication is another term used in the context of off-site construction. The UK Government has also coined the phrase 'Modern Methods of Construction' to refer to off-site construction techniques. The portions fabricated off-site are referred to as components or modules, and these are integrated into the building shell at the appropriate stage in the construction.
10 pages (2500 words) Essay
Offsite construction
The aim of this paper is to study the current market scenario and recent developments in the construction industry. The dissertation will, in reference to the historical context of off-site construction, attempt to study the suitability of these methods, as well as the possibilities of acceptance of these techniques by the public.
8 pages (2000 words) Essay
Quantity Surveying development and significance of the quantity surveyor's professional role in relation to changes in construction procurement practice and reg
It was not until the 17th century restoration of London after the Great Fire that Quantity Surveyors developed as an occupation but it is believed that the ancient Egyptians used a system of
10 pages (2500 words) Essay
Explain how understanding the making of meaning as a social practice differs from understanding cultural products as simply another type of mass produced goods and from the social construction of reality approach
as events and people that fall within the province of the world have their own true meaning embedded within their own system like number plates and language. Hall also puts across another dimension which questions whether there exist variations in meaning as exhibited in the
1 pages (250 words) Essay
Discuss with reference to current working practice how the implementation of good risk management practice on the part of the engineer during both pre and post contract phases of a construction project can minimize financial risk and subsequent costly con
This implies that severe precautions necessitate to be observed with regards to the details of the presumed contract. These precautions will ensure the smooth transition of the contract
10 pages (2500 words) Essay
Elaborate sustainable solutions on how to reduce construction waste during construction sites in United Arab Emirates
These construction pollutants come in the form of air , sound, and waste polution, which are all generated by the construction, equipment, and transportation activities at the site. These activities, equipment,
16 pages (4000 words) Essay
Get a custom paper written
by a pro under your requirements!
Win a special DISCOUNT!
Put in your e-mail and click the button with your lucky finger
Your email
YOUR PRIZE:
Apply my DISCOUNT
Comments (0)
Rate this paper:
Thank you! Your comment has been sent and will be posted after moderation