StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

Applied Construction Management - Coursework Example

Cite this document
Summary
The construction will be brought up on an existing green field site that is located to the north of the north west of Leeds. The city is one of the fastest growing in the United…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER97.5% of users find it useful
Applied Construction Management
Read Text Preview

Extract of sample "Applied Construction Management"

Download file to see previous pages

The car park will have the entrance the exit gates which will all face the main road. The entrance to the car parking will be from the side of Ragian Road with the exit being placed on the side of Rampart Road. The parking for the disabled people will be on the ground floor and to the left side of the entrance. The parking for other people will be on towards the right of the entrance and they will be able to park from the second to the third floor. Additionally, the car park will have surveillance cameras that will be placed on both the entrance towards Ragian and at the exit towards the Rampart road.

Other surveillance cameras will be place at each parking section with the control room located at the third floor of the building (Oyedele, Ajayi and Kadiri, 2014). The building will have four floors. The last floor will act as offices for executives and other people. The car park apartment will be painted blue green which are the company colours. Barriers will also be placed at the entrance and the exit to control traffic as well as acting as security control. The barriers will be manned by the personnel at the control room as well as the personnel located at both the entrance and the exit.

The painting will be done by the Solai painters with the lighting system being conducted by the Harold lights. The lighting system will be fixed to all floors as well as the parking sections. The lighting system will be raised to ensure that all the area in the park is well lit. The other issue that the contractor will take care of is the signage that will be located on the various sections of the park with an aim of giving direction to the people who will be visiting the park (Bennett and Ormerod, 2011).

The park will have signs that will show directions as well as the points of services. The contactor will ensure that the work

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Applied Construction Management Coursework Example | Topics and Well Written Essays - 3500 words”, n.d.)
Retrieved from https://studentshare.org/engineering-and-construction/1691797-applied-construction-management
(Applied Construction Management Coursework Example | Topics and Well Written Essays - 3500 Words)
https://studentshare.org/engineering-and-construction/1691797-applied-construction-management.
“Applied Construction Management Coursework Example | Topics and Well Written Essays - 3500 Words”, n.d. https://studentshare.org/engineering-and-construction/1691797-applied-construction-management.
  • Cited: 0 times

CHECK THESE SAMPLES OF Applied Construction Management

Analysis report of Shuttle Wagons project

The project was a combination of two different functions firstly it needed the finance and secondly it needed construction contractors.... Analysis Report of Shuttle Wagons Project [Supervisor Name] Executive Summary The success of Shuttle Wagon Project was largely dependent on the in time completion of the tunnel....
8 Pages (2000 words) Essay

External envelope (consruction technolgy and materials)

hellip; These structures are often of similar construction type design, and materials. The federal government has participated alongside industry in this process.... projects such as the sovereign Harbor development in East Bourne are taking advantage of ICF's fast track construction....
4 Pages (1000 words) Essay

PROJECTS & SYSTEMS THEORY

Burns and Stalker (1961, 81) argues that visualizing organizations as systems enables management and marketing.... He focused on the interrelationship between system parts in biology.... It is evident that, at that time many philosophers and scientists tried to explain how the universe operates, but, there were no proven systems in… As sciences split into physics, biology and chemistry, they started to understand how the earth operates systematically....
11 Pages (2750 words) Assignment

Supply chain management plan in construction project

This supply chain management (SCM) plan aims at centrally controlling and also linking the production, ferrying or shipment of construction materials, excellent information movement, and least financial costs from one point to another and finally to the site of construction a… The strategy lies in proper linking of the all stakeholders in material movement process ensuring that there is no break at any point of material transfer or material shortage whatsoever.... In the new multi-storey car park, emphasis is placed on the reduction of the inventory costs, timely availing of the construction items without delay of the required goods, least manpower wastage entailed in the process and professional management of the process....
6 Pages (1500 words) Coursework

Project Management in Reducing Costs and Improving Quality in Health Care Services

The discussion that ensues is going to analyze… hallenges that can be anticipated in managing a construction project as well as the management tools and methods that can be used to address these challenges. The first facet of project management that can be quite challenging is quality, especially to the owners of the PROJECT management Affiliation PROJECT management Project management encompasses harmonizing several phases of a project in order to bring forth a constructive outcome....
2 Pages (500 words) Essay

Introduction to Boldem Constructions Limited

Most of the times, the Boldem management has preferred a Fixed price contract, wherein, Boldem is the prime contractor for the client and offers its services till the completion of the project at a finalized set price.... owever, with new trends in the construction industry and innovative contractual agreements coming up, the company management is forced to take a look into the aspects of various other contract types and methods of working.... the client of Boldem will assign all the risk of the project in Boldem's account, as a result of which Boldem management can bid for the project at a higher price which will cover all the unforeseen damages and losses (at an estimate)....
6 Pages (1500 words) Assignment

The Issue of Safety in the Engineering and Construction Industries

Moreover, the paper discusses the significance of adopting an effective risk management system.... The aim of the paper "The Issue of Safety in the Engineering and construction Industries" is to address the most prevalent health concerns associated with construction activities.... hellip; Falls significantly affect construction operations with many of them leading to deaths and permanent disabilities.... According to Taylor and Easter (2008), more than 35% of accidents in construction are associated with falls and slips....
5 Pages (1250 words) Term Paper

Building Technology 3 Portfolio

If the construction or project was for residential buildings, then it would require a minimum of a quarter inch-wide join.... It was interesting to learn about some of the limitations to design that is applied in the balance of construction and safety.... Engineering has enabled me to see and understand the way theories or principles can be applied to design....
11 Pages (2750 words) Coursework
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us