DEVELOPMENT APPRAISAL, PROJECT COST CONTROL Name Institution Introduction The construction industry is among the most essential industry in the global economy. The nature of the industry deals in both goods and services. It deals with goods such as apartments, houses, factories, schools, offices, roads and the building of other structures…

Extract of sample
Development Appraisal, Project Cost Control

The building and construction sector includes contractors who build buildings for residential, industrial and commercial purposes. SECTION-A Question 1 This is a case whereby companies operating in the construction industry need to develop, differentiate, defend and communicate the development contribution they make to their host country  in just the same way as they manage the value they delivered to customers. Taking a case of buildings:  There are various aspects that defines these statement ‘‘Development value’’ in a more scientific way. ...
Download paper
Not exactly what you need?

Related Essays

Construction Cost Control & Management
In conclusion of the research, the PERT chart has been critically used to schedule, organize, and coordinate the tasks in this project. It has effectively ascertained the expected time of the project for effective planning and accountability of time and estimation of resources and cost. From the analysis, the pessimistic, normal and optimistic time were estimated. This was critical in showing the various activities keeping in mind their dependence to each other and particular independence. From the analysis with help of the PERT diagram, the critical path procedure shows that the estimated…
15 pages (3765 words)
Construction Cost Control & Management
The length of the lodge is 14 meters and the width is 10 meters. The rear roofing will not be excavated. The perimeter area that is to be excavated is the outer 2m width, and the depth will be 2.75 m. On the first day at the site, only the excavator and the driver will be present since the only work on that day will only involve digging up the ground. The material extracted is of poor quality and will be deposited in a pit far away from the site. The material is to be transported to a pit 8 km away by 20 tones capacity lorry. The number of lorries to be used during excavation period are two,…
10 pages (2510 words)
Estimating and purchasing cost control
In this approach, the design package is reviewed and fully comprehended followed by the performance of a quantity survey of the scope of the project in question. In case little or no design and plan information is available, the Order-of-Magnitude Estimates approach is highly recommended. However, it is imperative that the contractor ensures he/she has all the requisite information to ensure accurate estimation of the cost of a construction project. This paper explores the type of information useful in the estimation of the cost of redeveloping a storey building near a river and the…
10 pages (2510 words)
Process Control Project
It shows that the steam reduced by 45% as time moved on. This means, there is energy conservation by the system. Such control is made possible by the application of information technology. The following is the logical flow of the feedback control loop. Flow Diagram for a Feedback Control Loop Temperature Control for a Heat Exchanger Whereby the fluid entered the system from different sides of the system and then meets each other for heat exchange to take place. This is opposed to parallel heat exchanger systems in which the fluids would enter the system on one end and then flow parallel to…
3 pages (753 words)
Pre-Contract Cost Planning and Cost Controlling
Cost planning not only enables capital cost budgets to be set but also provides a structure to accommodate as well as manage transformations to the client’s brief and design (Murdoch & Hughes, 2007, p.80). An effective Cost plan enables a client together with the design team to understand where and how finances have been allocated towards the completion of a project. On the other hand, Cost control should be provided from start to completion of the project, ensuring that the estimated final cost is always known. However, Pre-contract Cost Controlling is quite different from the Post-contract…
9 pages (2259 words)
Development and Strategy Project
The project manager should first define the project and then work on building the projects work plan. For instance in this situation, the project is to set up a factory which deals in uPVC products and the company deals with both domestic and European markets. Since this project is a complex project, the project manager needs to gather the business requirements, help in designing the management system and also prepare tender documentation. The project manager also faces the challenge of appointment contractors, tender options and criteria and procedure for selecting contractors for tendering…
4 pages (1004 words)
Estimating Purchasing and Cost Control
Cost management is an integral part of financial control and management in any for profit and non-profit organisation, notwithstanding the industry or sector. The same applies particularly to the engineering and construction sector in which the huge amounts of financial and other resources pumped must be accounted for to stakeholders such as the government, project funders and the public/customers.Unfortunately, for various reasons, many countries’ construction sectors lag behind in the use of cost control techniques such as the Cost Value Reconciliation (CVR) and Earned Value (EV), two…
7 pages (1757 words)