Railway construction: Feasibility study Name Institution Course Date Feasibility study This is the process of uncovering the weaknesses and the strengths of an existing business venture. It expounds on the opportunities and threats present in the environment…

Extract of sample
Railway construction: Feasibility study

This is a discussion of the impacts in relation to the activities (Bos, 2001). Choice of materials, methods and a justification in relation to sustainability and building sustainability There are particularly many considerations in the choice of materials, as they all affect the ultimate goal which is to ensure that the materials are sustainable and of quality. These considerations include the budget, the location, materials availability, the intended use of the airport, and the objectives among others. There should be enough caution to avoid counter fits or sub-standard materials. The aim is to enhance the railway class and its internationally renowned beauty. All in all, when we discuss the matters of sustainability, we tend to focus on durability, competitive, cost, and maintenance of materials. The implementers of the project should be competent; they should have a clear reputation in construction and funds management. The awarding of the employees should be fair enough to enhance quality output (Broek, 2009). Budget Railway construction materials should be of minimum cost. The cost should be in line with the cost in the project development. This is to ensure that the budget remains as it is outlined in the project. Poor budget may lead to incomplete projects. It is discouraging to drop a project as a result of poor planning. ...
Download paper
Not exactly what you need?

Related Essays

A Feasibility Study of Building Structural Deformation Monitoring using Global Positioning (GPS)
To achieve their objectives through this study, the authors monitored structural deformations in one high-rise building, viz. the Twin Tower of Science and Technology Complex, and one low-rise building, viz. the Innovation Centre Building, both of which belonged to the University Technology MARA (UiTM), in Selangor, Malaysia. The authors chose high accuracy GPS (±1 mm) and total station (± 1 mm, 1”) to apply in deformation monitoring of the buildings, to improve accuracy of the survey. During the course of the study, authors identified appropriate points on the building structure, and…
7 pages (1757 words)
Rail construction project failure
The rail transport in this country is underdeveloped with rail transportation accounting for less that 1% of the land transportation (Oluwakiyesi 2011). It has been found out that non-utilization of competent consultants and contractors, inconsistencies in government policies, defective cash flow, and inadequate monitoring are the major cause of failure of projects in this country (Ololusi & Otunola 2012). However, the government and other stakeholders have been very slow to react and thus the problem continues to be evident. Morocco on the other hand is an African country that has been able…
15 pages (3765 words)
Choose two potential markets( construction related, such as railway or civil etc. ) for a contracting organisation to enter for
Overall, construction advanced by 8% in the year 2010 and in the subsequent year by 2.8% (DKM Economic Consultants, 2009, P.15). Nevertheless, by the later part of the year 2011, the entire construction industry’s growth had started to become slow with a relative downturn in the year 2010. For instance, new construction orders in the year 2012 were below the preceding quarter’s level, by 8.5% (DKM Economic Consultants, 2009, P.17). At this time, the house construction sector, both public and private suffered a major blow, and only infrastructure construction showed slight signs of…
8 pages (2008 words)
Soil strengthening of age-old-designed railway tracks
The response to the cyclic loading of rail track is an interaction of superstructure and substructure. Ballast, sub-ballast, and sub-grade relates to substructure. Decades of operation bring structural changes of substructures. The sub-grades of the old existing rail tracks require rehabilitation to satisfy proper functioning and meet current technical operational standards. The scope of this assignment is to find the rehabilitation approach for the existing tracks of Australia. The solution must account that improvement of substructure by dismantling the railways is not an option due to the…
12 pages (3012 words)
Construction Economics
2.0 Basis of the Report and Assumptions The report is based on the relevance of cost benefit analysis in determining the feasibility of a project. It is assumed that the developer is aware of the prevailing market rates but is not conversant with the costing strategy that can match the rates. The essence of this report is therefore to recommend the actions on whether the project is viable or not depending on the cost benefit analysis results (Schmitt, B., 2007). 3.0 Site Location Information The construction site is located in London, towards the south east of England. It has a conglomeration…
4 pages (1004 words)
Construction Engineering
Following are the steps involved in designing new hospitals in Canada(Martin). First and foremost step is designing the patient care areas which may either be for a single patient or for multiple patients. These areas are designed for proper HVAC conditions so that least energy is consumed to maintain required environmental parameters. These areas are usually provided with a window or wall that is directly exposed to harsh weather conditions. Therefore, proper supply and exhaust outlets are provided in order to provide isolation from air borne infections. Rooms being designed for patients with…
7 pages (1757 words)
Construction Engineering
Whether or not a power plant can be built on a specific location is determine by carrying out technical surveys based on following recommendations. Supply of raw material to the place is convenient .i.e. the construction site is provided by roads to transport goods to that part of the area. Must have ample space to accommodate construction machinery. Must have proper area for dumping mud extracted from the construction site. Quebec is rich in places that are suitable for the construction of power plant. For the construction of such a facility in Quebec, following considerations are followed.…
6 pages (1506 words)