Engineering project management - Assignment Example

Not dowloaded yet

Extract of sample
Engineering project management

A large number of employees would increase the rate at which the work will be done and increasing chances of completing the project on time (Panneerselvam & Senthilkumar 2009). The contractor may also employ other technologies and equipment instead of using manpower. The use of machines instead of humans to do certain tasks is normally advantageous since the tasks can be done at high rates there by increasing the chances of completing the project on time (Nagarajan 2007). The contractor may also divide the project into small and more manageable units, and each unit should have a goal to achieve. As for the case of the company, the organization should give additional funding to contract so as to fund the additional works as well as fund additional manpower and/or any new equipment acquired for the task. Another solution that might help the company meet its aims is that the organization may consider subcontracting sections of the order while it is still waiting for the new equipment to be installed. (Word count: 248) Question 2: Safety and Health ramifications and Time scale a) Time scale ramifications Due to safety concerns associated with asbestos, the scope of the project is likely to be changed (removal of the existing duct and its contents). The changing of the scope would mean that other constrains such as time and cost will be adjusted accordingly (Kanda 2011). This means that the project deliverable (installing a new machine’s base) will not be produced on time. The consequence of not completing this project on time is dire to the company since the organization might lose an important order, and due to the cost investment made on the new equipment the organization might be forced to close down. This means that delaying the installation of the base of the new machine is not an option for the organization. b) Safety and Health ramifications Employees are amongst the most important elements for organizations; therefore, there health should be made priority (CCH 2009). In addition, safety of environments in which employees work must conform to occupational safety and health standards (Lingard & Rowlinson 2005). Compromising the health of workers by making them work alongside these asbestos ducts would affect health, and consequently their productivity will also be affected (CCH 2009). The organization may also risk being closed down for not following occupational safety standards and regulation. (Word count: 202) Question 3: Consequences of the organization following strict time scales regardless of the presence asbestos a) Consequences If the organization decides to meet the strict time scale without regarding the presence asbestos, the consequences may be dire to the organization. First, as earlier mentioned the employees of the organization may be exposed asbestos to limits more than those specified by occupational health and safety authorities of the region in the organization is operating. The result of this is that the employees may contract heart and lung related ailments, which may in turn affect their productivity (CCH 2009). This means that the organization may fail to meet its current production levels as well as the sales target. Another consequence of following the strict deadline without regarding the presence of asbestos is that the organization may be closed down by the safety and health occupation authority in the area in which it is operating for violating the recommended threshold values of the asbestos. ...Show more

Summary

Managing an engineering project Name Institution Question 1: Proposed solutions to assist the company and the contractor to achieve their goals The main aim of the contractor is to complete the project of installing the new machine base within scheduled period of time and within the budget (Kanda 2011)…
Author : eleanore44
Engineering project management essay example
Read Text Preview
Save Your Time for More Important Things
Let us write or edit the assignment on your topic
"Engineering project management"
with a personal 20% discount.
Grab the best paper

Related Essays

Project management
Because of the increasing tourism in the UAE, Palm Jumeirah is developed in such a way that the project serves to the tourism industry as well as the natural beauty of the country. The greatest benefit that the island served was to be the project that bought international recognition and fame to the small country.
7 pages (1750 words) Assignment
Design project management
GNATT CHART AND CRITICAL PATH ANALYSIS 10. PROJECT EVM ANALYSIS 11. PROJECT ESTIMATE AT COMPLETION VIS-A-VIS BUDGET AT COMPLETION 12. WORK BREAK DOWN STRUCTURE 13. COST ANALYSIS OF VARIOUS ACTIVITIES INVOLVED (Figures Imaginary) 14. RECOMMENDATIONS FOR IMPROVEMENT 15.
18 pages (4500 words) Assignment
Value Management/ Value Engineering
Value management is drawing considerable attention within the United Kingdom building and construction industry. The VM has increasingly become a popular aspect among the customers because it attaches value for the investment in the construction industry.
8 pages (2000 words) Assignment
Project Management
The paper focuses on project management. Even if the constraints for schedule and budget are met, the question of project delivering what it intended in terms of results and quality to meet customer satisfaction is critical for measuring the project success. Experience has shown that most of project failed due to unclearly or ambiguous project.
11 pages (2750 words) Assignment
Civil Engineering Management Portfolio
Construction Engineering is one of the major sub-disciplines of Civil Engineering that is supported by other advanced engineering sub-disciplines like Transportation engineering, Heavy Electrical & Mechanical Engineering, Soils and Foundation engineering, Hydraulic engineering, Ocean engineering, etc.
12 pages (3000 words) Assignment
Engineering project management
The changing of the scope would mean that other constrains such as time and cost will be adjusted accordingly (Nagarajan 2007). This means that the project
3 pages (750 words) Assignment
Engineering project with management
The stethoscope has been in use for the last 200 years, but very few changes have been made on the traditional stethoscope. The traditional stethoscope is the stethoscope that relies on the original stethoscope design,
6 pages (1500 words) Assignment
Project Management
Time constraint was severe for both projects. Manhattan required the development of an atomic bomb to end the war in a shortest time. For Pathfinder, a landing vehicle was required to be developed in three
1 pages (250 words) Assignment
Project management
above mentioned principles and characteristics of a project are very significant because they underpin the strong foundation of a project upon which its success lies. It helps in planning, organizing and meeting the objectives of the project along with its accomplishment in a
11 pages (2750 words) Assignment
Project Management
In the case on HP, the need to develop a product applicable to elementary school pupils proves imminent and hence the need to have HP commit its resources ranging from employees to finances to the development of a product that suits these level of users.
24 pages (6000 words) Assignment
Get a custom paper written
by a pro under your requirements!
Win a special DISCOUNT!
Put in your e-mail and click the button with your lucky finger
Your email
YOUR PRIZE:
Apply my DISCOUNT
Comments (0)
Rate this paper:
Thank you! Your comment has been sent and will be posted after moderation