Name: Course: Date: Risks management analysis during Construction stage and Operational stage of the Channel Tunnel Project Construction Phase The construction phase falls in the implementation stage of the Channel Tunnel Project. The risk factors involved in this phase are numerous, and thus fundamental analysis and risk management activities are essential to ensure the safety of the project at this stage…

Introduction

This serves to mitigate the risk of resource shortage for the project, through the application of the principle of maximizing utilization of the resources, to ensure that they fit into the project schedule. Program monitoring and control is yet another vital risk mitigation concept under the construction phase, which entails consistent and regular evaluation of every single aspect of the project and the timely correction of any errors, to ensure that the construction process progresses without safety threats (Yan-juan, Ding-li, & Jian-jun, 2009 p3). This calls for the full adoption and implementation of the principle of project management discipline, which requires that he project, is monitored consistently in every single activity and aspect of implementation, to notice and eliminate all the issues that could be a risk factor to the project. This is meant to avoid future problems, which could have been addressed at the earlier stages (Clifton, 2011 p49). ...
Download paper
Not exactly what you need?

Related papers

Risk Management
Often, an infrastructural construction project involves a number of phases before final completion and transfer to the contract awarding authority. The phases include the appraisal phase, the design phase, the construction phase, and the operation phase. Although there are some cross-cutting risks across the phases, some are unique to each phase and hence it’s often important to independently…
Scheduling Management in Tunnel Construction Projects
45). Scheduling management Scheduling management is very important to any project because it entails helpful techniques applicable while managing activities involved in projects. Managers practice scheduling management before starting up a project, which involves. Pointing out the task that interests an individual, estimating the total period that the task will take, and distributing resources…
Construction Management
Different sizes of projects require different services, and so before one makes a decision on the system to use to require the services, size is one of the basic things to consider. This report is about the construction project that we undertook. Being the four of us, each member was given a different role and each member had to closely work together with the other members of the group in order to…
channel tunnel
The Transmanche Link (TML) is the contractor who is responsible for the Channel Tunnel design, construction and commissionioning of the project. Design of the Channel Tunnel The design scale was massive and highly intricate and hence it was categorized into five divisions – a) System throughput b) Performance of shuttle trains c) Environment d) Safety and passenger evacuation e) Scenarios and…
Construction Project Management (International projects. An analysis of about six construction projects which take place in two
Otherwise chances are high that if only the typical constrains of project management are considered, projects may not meet they objectives with these constrains. The problem becomes worse when a project is jointly undertaken by two nations. The purpose of this paper, therefore, is to analyze not more than six construction projects undertaken in two nations in order to identify factors that may be…
Risks management analysis during Development stage of the Channel Tunnel Project, Including management of environmental risks du
(Yan-juan, Ding-li, & Jian-jun, 2009 p2). This is then followed by the assessment of the influence of the excavation on underground strata structures, and how such excavation might lead to their deformation. To reduce the probability of these risks, the Construction, Design and Management Regulations have been developed to aid the monitoring and avoidance of the risks. The necessary controls are…
Sustainability in construction starts at the design stage of a project. Identify and explain the main constituents of sustainabl
Conclusion……………………………………………………………………….8 References…………………………………………………………………………. 9 Appendix……………………………………………………………………………10 1. Introduction Sustainability is highly involved in the construction industry. Still, the use of the rules of…