We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Nobody downloaded yet

Draft spatial framework for Perth and Peel - Case Study Example

Comments (0) Cite this document
Summary
. a vision for future growth of the Perth and Peel region.” It was prepared by the Western Australian Planning Commission and released in June 2009.
The following essay and…
Download paper
GRAB THE BEST PAPER
Draft spatial framework for Perth and Peel
Read TextPreview

Extract of sample
Draft spatial framework for Perth and Peel

According to John Day, Western Australian Minister of Planning, “Directions 2031 reconfirms the themes identified in previous strategic plans, which were to better use existing infrastructure and provide for a more sustainable city.” Sustainability is defined as meeting the triple bottom-line of economic growth, environmental health and quality of life. This more sustainable city will require “328,000 more dwellings to accommodate an additional 556,000 residents” as the population rises from 1.66 million to 2.2 million by 2031, Day writes. The region of Perth and Peel will have to grow in population while also becoming more compact and more sustainable.
Gary Prattley, Chairman of the Western Australian Planning Commission says, “its purpose is to spatially define how we think the city should grow, identify structural changes necessary to support that growth, and identify planning and policy priorities for implementation.” The draft spatial framework is to include a concept of how we think the city should grow, the policies and plans to support that growth, and practical steps toward implementation.
Prattleys Vision Statement contains a precise outline of the history of urban planning in the Perth and Peel Region. “Western Australia has an enviable history of metropolitan planning starting with the adoption of the Stephenson-Hepburn plan in 1955. The Corridor Plan followed in 1970, Metroplan in 1990 and Network City in 2004.” These first three urban planning documents “focused primarily on the identification of new urban growth areas to cope with rapid population expansion,” according to Directions 2031. They were from the era of suburbanisation and urban sprawl. They tried to guide the growth of the urban and suburban area.
However, beginning with the Network City plan in 2004 a major shift in urban planning emerged. The Network City document is subtitled, A Milestone ... Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“Draft spatial framework for Perth and Peel Case Study”, n.d.)
Retrieved from https://studentshare.net/miscellaneous/406371-draft-spatial-framework-for-perth-and-peel
(Draft Spatial Framework for Perth and Peel Case Study)
https://studentshare.net/miscellaneous/406371-draft-spatial-framework-for-perth-and-peel.
“Draft Spatial Framework for Perth and Peel Case Study”, n.d. https://studentshare.net/miscellaneous/406371-draft-spatial-framework-for-perth-and-peel.
  • Cited: 0 times
Comments (0)
Click to create a comment
CHECK THESE SAMPLES - THEY ALSO FIT YOUR TOPIC
WalMart Case Analysis using Porter's (2008) Model & Lee and Whang's (2001) Framework
What are Wal-Mart's competitive advantages? How sustainable are those advantages. Use Porter's (2008) model for this analysis.  Competitive Advantage Wal mart competitive advantages are its distribution capabilities. One of the activities of Wal mart was efficient distribution.
3 Pages(750 words)Case Study
Case Study: Building the Global Framework (1985-2004)
The transformation witnessed during this period include management changes in business, acquisitions, improvements in competitive strategies, introduction of deal making, witnessed new and better emerging markets, changes in the global management strategies, emerging multinational enterprises, change in management, multinational corporations and business organizations transformations (Kanter, Yatsko and Raffaelli 2009).
3 Pages(750 words)Case Study
Audit Framework

The author states that auditing process is considerably broader than the definition of an audit of historical financial statements and encompasses many attestation and assurance service activities. The concern is with determining whether recorded information properly reflects the economic events that occurred during the accounting period.

22 Pages(5500 words)Case Study
Framework for Environmental Health Risk Management - Dose-response Relationship
Most risks when exposed to end up causing harm or maybe disastrous to those who are exposed. Exposure to risk could also be in terms of asset exposure or business exposure to various risk factors. It is therefore; the possibility that such exposure to hazards
2 Pages(500 words)Case Study
Capstone Chapter 1 Draft
This paper has been designed to evaluate and find out whether the presence of the children and the peers in the children lives has an effect on these children. It is going to identify different effects
3 Pages(750 words)Case Study
Legal Framework in Employment
igh Court recently decided that the activities of former staffs were subject a contract they had signed, as a result of expiry of their employment contract. Like Angela, the employees sought to disregard restrictive terms they had signed with their employer (Meermann, 2014; Van
9 Pages(2250 words)Case Study
CIS 375 Case Study 1 week 3: Using Technology as Experience Framework
As many organizations migrate to the online platforms, donations can now be done through the website. According to Arumi & Johnson (2005), this journey has not been inspirational or engaging in a manner that befits the nature of interaction expected for donations.
2 Pages(500 words)Case Study
Benefits Management Plan for the Perth Arena Project
Improve social wellbeing and public participation in sports. Enhancing the spirit of unity through sports and shows.
3 Pages(750 words)Case Study
Benefits Management Plan for the Perth Arena Project
The only problem that can hinder the success of this project is failure to maintain the project the way it ought as well as lack of enough and qualified employees.
3 Pages(750 words)Case Study
Let us find you another Case Study on topic Draft spatial framework for Perth and Peel for FREE!
Contact us:
+16312120006
Contact Us Now
FREE Mobile Apps:
  • About StudentShare
  • Testimonials
  • FAQ
  • Blog
  • Free Essays
  • New Essays
  • Essays
  • The Newest Essay Topics
  • Index samples by all dates
Join us:
Contact Us