StudentShare
Contact Us
Sign In / Sign Up for FREE
Search
Go to advanced search...

647 W7 assign Project Monitoring - Essay Example

Cite this document
Summary
The next phase of the project is identified as the need to implement the mobile application so that students can receive updates on their courses from their mobile devices. At…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER96% of users find it useful
647 W7 assign Project Monitoring
Read Text Preview

Extract of sample "647 W7 assign Project Monitoring"

Download file to see previous pages

The third stage responds to any issues or problems detected. The fourth and final stage is outbound communication, keeping people aware of what has happened in the project” (p. 295). For the implementation of mobile application, project proponents are assumed to have undertaken the first stage, which is the collection of information for the current project status. Given that everything stipulated in the implementation phases have been completed, except for integrating thw NLMS to the students’ mobile devices, the information needed to be collected are the access points (mobile numbers of the students) to link their devices to the university’s database.

After securing this critical metric, the mobile application with access credentials would be activated, as planned (second stage). Under the third stage, there should be a period to be allotted to address any concerns, issues, or problems related to implementation of mobile application. If any student complaints of the inability to access the site, then, appropriate measures should be undertaken to correct this. Finally, an official memorandum should be issued by the Project Manager to all students, faculty members, support personnel, and the board of directors to communicate that multiple phases, including the mobile application, has been undertaken and is currently duly working according to plans.

Another method to communicate the results would be through a formal report to the board of directors or through project status meetings (Kendrick, 2003). The progressive case study was an effective method to inculcate theories from the required textbook to practical applications, using GU as the simulation for real-life scenario. The case study was structured in a strategic manner to enable students to focus on needed concepts, depending on the topic areas that should be imbibed as consistent with the learning objectives of the course.

...Download file to see next pages Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(“647 W7 assign Project Monitoring Essay Example | Topics and Well Written Essays - 1000 words”, n.d.)
647 W7 assign Project Monitoring Essay Example | Topics and Well Written Essays - 1000 words. Retrieved from https://studentshare.org/business/1682651-647-w7-assign-project-monitoring
(647 W7 Assign Project Monitoring Essay Example | Topics and Well Written Essays - 1000 Words)
647 W7 Assign Project Monitoring Essay Example | Topics and Well Written Essays - 1000 Words. https://studentshare.org/business/1682651-647-w7-assign-project-monitoring.
“647 W7 Assign Project Monitoring Essay Example | Topics and Well Written Essays - 1000 Words”, n.d. https://studentshare.org/business/1682651-647-w7-assign-project-monitoring.
  • Cited: 0 times

CHECK THESE SAMPLES OF 647 W7 assign Project Monitoring

Environmental Impact Analysis

This paper ''Environmental Impact Analysis'' tells that The consumption of nuclear power as a medium of local fuel has drastically raised in a very short period and an estimation states.... It needs to be realized at this point that the consumption of this form of fuel/energy has its different aftereffects....
6 Pages (1500 words) Assignment

Contract for Construction of a Two Storey Building

The Contractor must allow MERCY CORPS complete access to the contracted location for monitoring and supervision of contracted works, at all times.... years) Construction/ handicraft work (21/2years) Installation work (23/4 years) Restoration/clean-up of project site (After 3 years) Other work (After 3 years) Article 3 Sub article 3.... How long does the contractor have to perform the entire project?... In the event of such informal resolutions not being possible, this Contract will be subject to resolutions in accordance with the applicable international and provincial laws Article 9 Appendix Location: North Carolina Tender №: MCR/156td/8/2012 project : Construction of a two storey Building Date: 12/8/2012 Account Code: Sub Code: Cost Center: Construction Contract I....
3 Pages (750 words) Assignment

Strategic Marketing Planning of S&W and Makatume

The author takes the perspective of S&W's Director of Strategic Planning to develop a full SWOT analysis of S&W, identifying and explaining five factors for each category (strengths, weaknesses, opportunities, and threats) and proposes a complete strategy which addresses one of S&W's weaknesses....
8 Pages (2000 words) Assignment

A British Leisure Company Benimhanna

In this context, all parameters related with the planning, construction, monitoring, and completion of the project should be examined taking into account the fact that the firm is financially strong but in no way this plan should proceed if its construction and operation will cause a financial loss (at least this issue has been highlighted by the firm's owners).... It should be noticed that the procedure for the realization of the project has already begun – with the submission of the relevant dossier in the local Council – however, it is necessary that the firm will appoint the soonest possible a project manager that will handle and monitoring all issues related with the realization of this project....
8 Pages (2000 words) Assignment

Total Quality Management and Its Aspects

This paper is based on the comprehensive discussion of Total Quality Management (TQM) and almost every aspect of this special type of management, especially how it can be applied at different levels, is meticulously tried to be covered.... hellip; This discussion illuminates all the aspects in which TQM differs from traditional models....
12 Pages (3000 words) Assignment

Contemporary Management

The paper ends by urging companies to develop performance monitoring and increase strategies that include the use of EFQM.... This paper discusses self-evaluation through European Foundation for Quality Management (EFQM) Excellence Model.... This model, which started in 1992, has gained popularity over the ages and is now a widely used model by… The paper begins by showing that the model emanated from the Total Quality Management (TQM), just like many other self-evaluation tools....
10 Pages (2500 words) Assignment

The Skills in Computer Engineering

… The paper "The Skills in Computer Engineering" is a great example of an assignment on information technology.... nbsp;The information system personnel should possess several skills in information technology in order to fully serve in their capacity.... A management information system is one of the business competencies that the person should possess....
13 Pages (3250 words) Assignment

Research Methods in Human Safety Management

… Research Methods in Human Factors Safety Management - SP2 2015 ETHICS APPLICATIONPROJECT DETAILS5.... Application TitleThe relationship between pilot fatigue on flight safety5.... Plain English titleThe effect of fatigue on pilots and flight safety.... 5.... Research Methods in Human Factors Safety Management - SP2 2015 ETHICS APPLICATIONPROJECT DETAILS5....
17 Pages (4250 words) Assignment
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us