The purpose of the research proposal 'Engineering Project Management' is to design and implements a new climate/ weather recording station in a remote location with the ability to record and transmit continuous geological, weather, and seismological data to a central monitoring site via satellite…
Download full paper File format: .doc, available for editing
GRAB THE BEST PAPER98.1% of users find it useful

Extract of sample "Engineering Project Management"

Scope statement, WBS and Estimation 48260 Engineering Project Management Student’s Name College Instructor’s Name Course Name: Table of Contents Deliverable 1: Scope 2 Objectives, goals, needs 2 Assumptions 3 Out-of-scope work 3 Deliverables 3 Project Milestones 4 External dependencies 4 Limits, exclusions and disclaimers 5 WBS 5 Deliverable 2: Estimation 7 Realistic Time Estimates 7 Realistic Cost Estimates 7 Appropriateness of References 7 Detail/ Breakdown of estimations 7 References 9 Deliverable 1: Scope The project is set within $55 million which is specifically dedicated to creating the climate or weather recording station. Objectives, goals, needs The purpose of this project proposal is design and implements a new climate/ weather recording station in a remote location with the ability to record and transmit continuous geological, weather and seismological data to a central monitoring site via satellite. The proposed new station will collect data for Wind speed, Air pressure, Precipitation, temperature, Humidity, Rainfall, Seismological Activity, Land movement and Ground water table. We endeavour to deliver the delivery, install, test, verify operational and provide maintenance documentation for all components required by the station. Therefore, this project plan intends to instill a practical essence of understanding how the available resources could be properly managed. Through the assumption of the elements of the project’s completion, this plan aims to present a more viable process by which the time and the finances set for the completion of the project is properly met with satisfactory results expected. Furthermore, this project initiation plan intends to make the best out of what has been provided thus create an effective process of implementing the procedures intended to make the project successful source of satisfaction for all the stakeholders. Some other specific objectives include the following: Supply and install a hut for housing store all electronic equipment, office for all technicians and other equipment fit for use by station. Supply to site and install all equipment and support facilities required to provide measurement capability. Fencing, landscaping, security of site. Ensure facility is operational and secure for handover. Client Needs- Goals were set to ensure that the quality of the project in terms of construction and process was not compromised. Project planning will done with the consideration of the external environment such as technological changes, suppliers gaps, geographical location and climate. The project construction will run for two years. The stages involved were planning, budgeting, design, construction documentation, bidding, construction, evaluation, testing and delivery. Assumptions The assumptions of the project will be (a) The project will take 2 years to complete (b) The project team will be working eight hours five days a week excluding Saturday and Sunday (c) There are enough resources to ensure that the project goes to completion (d) There are no overtimes and the team works through public holidays within the week. Out-of-scope work We will not get involved in tarmacking the road or maintain computers. The licenses for satellite usage will be the mandate of the client. Deliverables After the completion of the project we needed to deliver a working Climate Observation Station with Acquisition of land for the project budget plans assessment reports by engineers human resource personnel an equipment hut an array of mounted sensors, Support infrastructure like solar power, security, communications, water tank. In a given project, in a typical setting, the overseeing of each phase of construction and the resolution of any discrepancies in the original blueprint design and its actual implementation are taken care of by the construction management personnel. They are also responsible and accountable for the project cost and must be able to control the cost of the labor and the material. They may work in collaboration with a single or more than one project managers, superintendents of the site, architects, which can be in an office and/or in a hardhat environment. One important factor to consider in project management is that each phase of a project must be delivered within a given budget and period (Sebastaian, 2007). The excluded work from what is mentioned will be the convincing of the neighborhood from accepting to sale their land to the university. The other work that has not been mentioned is the work of the architecture and the engineers. Project Milestones 1. Acquisition of land for project by June 1, 2016 2. Design and approval of plans by August 1, 2016 3. Establishment of project site and access roads by November 1, 2016 4. Construction of Custom built in situ(hut), Tower, Fence, Drainage and water system, by June 30, 2017 5. Installation of Power, alternatives source of power , Air-con and tower wiring by September 1, 2017 6. Installing fit outs such Measuring Equipment Install, Measuring instruments, Solar panels, Ladder, Office desk, chair filing cabinet, lighting, Racking, Power reticulation and data cables by December 1 2017. 7. Commissioning and Acceptance Testing of equipment by January 1 2018 8. Making Operational Manual By February 1, 2018 9. Hand over by December 1, 2018 External dependencies The above information collecting techniques helped in the drafting of a proposal on what tasks should be carried out and how these tasks are dependent on each other. The tasks should be able to state how they are dependent on each other (Sebastaian, 2007), and how their dependency helps in the update of company the implication, therefore, is that the construction of tower is crucial. However, in order for the update to be carried out, the we requires acquisition of land and site preparation. Limits, exclusions and disclaimers Perhaps the primary problem in this project is the time limit. With only two years to construct for such an important facility, the agencies involved should communication with each other hence assuring each other that they are doing their part of the deal. Specifically pointing out to time and the constraints it provides, the management now is faced with the challenge of using that little time to the fullest and turning limited resources to the best value that they could have for the event being managed. WBS This process relies on the work break down structure that is decomposed to output the activity list and work break down structure updates(Sebastaian, 2007). This is the step where a graphical representation of the project hierarchy is made. Such illustrations help the project management team to look at the project from different angles and identify potential loopholes in the project. This bird-eye view of the project helps create reference points for various activities required in the project phases. This is followed by another best practice of ‘verifying the scope and getting the feedback’. Since timeliness is a crucial component of projects, verification of the scope is also critical in the progress of the project cycle. Here, the actual management and controlling of the project takes place to ensure that work is carried out under the decided scope. It aims to avoid, as much as possible, the possibility of adding to the scope. To work on this, there should be good change management process and in case of changes the budgeting and schedule should be adjusted. Typical to this construction project is the following work breakdown structure. LEVEL 1 LEVEL 2 LEVEL 3 DURATIONS (months) Climate Or Weather Recording Station Construction Project 1.1 INITIATION 1.1.1 Site acquisition 1.1.2 Evaluation and recommendations. 1.1.2 Project charter development 1.1.3. Charter submission 1.1.4. Project charter review 1.1.5. Project charter approval 3 1.2 PLANNING 1.2.1. Scope statement determination 1.2.2. Determine project team 1.2.3. Team kick off meeting 1.2.4. Project plan development 1.2.5. Project plan submission 1.2.6. Project plan approval 3 1.3 EXECUTION 1.3.1. Project kick off meeting 1.3.2. Validation of client requirements 1.3.3. Final site inspection and approval 1.3.4. Construction material procurement 1.3.5. Construction of the station facility(Hut), 1.3.6. installation of power, Air-con 18 1.4 CONTROL 1.4.1. Project status meeting 1.4.2. Risk management 1.4.3. Reviewing project management plans Throughout the project 1.5 CLOSE OUT 1.5.1. Procurement audit 1.5.2. Project status reporting 1.5.3. Record and file updating 1.5.4. Formal acceptance and handover. 3 Deliverable 2: Estimation Realistic Time Estimates This is the expected completion time of each activity. It is clearly shown in the table Realistic Cost Estimates This is the expected cost of each activity. It is clearly shown in the table Appropriateness of References This is the source of the cost shown in the table Detail/ Breakdown of estimations The following shows costs breakdown for each activity task list Realistic Time Estimates(months ) the resources Realistic Cost Estimates ‘000’ Appropriateness of References Site acquisition 1 Land value $ 4000 (Clement, 2015). Design and approval of plans 1 5 employees $ 1000 (Tarmac NZ, 2016.) project site and access roads 3 Subcontractor $ 10000 (Tarmac NZ, 2016.) Foundation preparation and build 1.5 Contractor $ 8000 Clement, D. 2015. Custom built in situ-hut 2 Contractor $ 3000 Clement, D. 2015. Building Tower 2 Contractor and expert $ 2800 Clement, D. 2015. Fencing 1 Contractor $ 2000 Clement, D. 2015. Drainage and water system 1 Contractor $ 5500 (Tarmac NZ, 2016.) Dust ingress prevention and Air circulation 1 engineers $ 2500 Clement, D. 2015. Installation of Power and solar connection 1 Electrical engineers $ 2000 (Tarmac NZ, 2016.) Installation of equipment in the hut 1 Various engineers $ 1000 Clement, D. 2015. Installation of instruments 2 IT experts and engineers $ 6000 (Clement, 2015). data cables installation 1 IT experts $ 1000 (Clement, 2015). Testing and commissioning 2 Management and engineers $ 3200 (Clement, 2015). Documentation 0.25 Management and engineers $ 1000 (Clement, 2015). training 2 Engineers $ 2000 (Clement, 2015). support 12 Experts $ 500 (Clement, 2015). feedback 2 Management $ 500 (Clement, 2015). Close and handover 1 day Management and client $ 0 (Rawlinsons media limited, 2012) Total 55000 References Clement, D. 2015. Red tape pushing building costs up. Available online at, (accessed on 15th April, 2016) Rawlinsons media limited, 2012. Available online at, (accessed on 15th April, 2016) Tarmac NZ, 2016. Kerikeri Domain walkway FNDC (accessed on 15th April, 2016) The Building Research Levy, 2008. Study Report: New house price modelling (accessed on 15th April, 2016) Sebastaian, N, 2007, The Definitive Guide to Project Management, 2nd Ed.n. London: Financial Times / Prentice Hall. Read More

In a given project, in a typical setting, the overseeing of each phase of construction and the resolution of any discrepancies in the original blueprint design and its actual implementation are taken care of by the construction management personnel. They are also responsible and accountable for the project cost and must be able to control the cost of the labor and the material. They may work in collaboration with a single or more than one project managers, superintendents of the site, architects, which can be in an office and/or in a hardhat environment.

One important factor to consider in project management is that each phase of a project must be delivered within a given budget and period (Sebastaian, 2007). The excluded work from what is mentioned will be the convincing of the neighborhood from accepting to sale their land to the university. The other work that has not been mentioned is the work of the architecture and the engineers. Project Milestones 1. Acquisition of land for project by June 1, 2016 2. Design and approval of plans by August 1, 2016 3.

Establishment of project site and access roads by November 1, 2016 4. Construction of Custom built in situ(hut), Tower, Fence, Drainage and water system, by June 30, 2017 5. Installation of Power, alternatives source of power , Air-con and tower wiring by September 1, 2017 6. Installing fit outs such Measuring Equipment Install, Measuring instruments, Solar panels, Ladder, Office desk, chair filing cabinet, lighting, Racking, Power reticulation and data cables by December 1 2017. 7. Commissioning and Acceptance Testing of equipment by January 1 2018 8.

Making Operational Manual By February 1, 2018 9. Hand over by December 1, 2018 External dependencies The above information collecting techniques helped in the drafting of a proposal on what tasks should be carried out and how these tasks are dependent on each other. The tasks should be able to state how they are dependent on each other (Sebastaian, 2007), and how their dependency helps in the update of company the implication, therefore, is that the construction of tower is crucial. However, in order for the update to be carried out, the we requires acquisition of land and site preparation.

Limits, exclusions and disclaimers Perhaps the primary problem in this project is the time limit. With only two years to construct for such an important facility, the agencies involved should communication with each other hence assuring each other that they are doing their part of the deal. Specifically pointing out to time and the constraints it provides, the management now is faced with the challenge of using that little time to the fullest and turning limited resources to the best value that they could have for the event being managed.

WBS This process relies on the work break down structure that is decomposed to output the activity list and work break down structure updates(Sebastaian, 2007). This is the step where a graphical representation of the project hierarchy is made. Such illustrations help the project management team to look at the project from different angles and identify potential loopholes in the project. This bird-eye view of the project helps create reference points for various activities required in the project phases.

This is followed by another best practice of ‘verifying the scope and getting the feedback’. Since timeliness is a crucial component of projects, verification of the scope is also critical in the progress of the project cycle. Here, the actual management and controlling of the project takes place to ensure that work is carried out under the decided scope. It aims to avoid, as much as possible, the possibility of adding to the scope. To work on this, there should be good change management process and in case of changes the budgeting and schedule should be adjusted.

Typical to this construction project is the following work breakdown structure. LEVEL 1 LEVEL 2 LEVEL 3 DURATIONS (months) Climate Or Weather Recording Station Construction Project 1.

Read More
Cite this document
  • APA
  • MLA
  • CHICAGO
(Engineering Project Management Research Proposal Example | Topics and Well Written Essays - 1500 words, n.d.)
Engineering Project Management Research Proposal Example | Topics and Well Written Essays - 1500 words. https://studentshare.org/engineering-and-construction/2066804-engineering-project-management
(Engineering Project Management Research Proposal Example | Topics and Well Written Essays - 1500 Words)
Engineering Project Management Research Proposal Example | Topics and Well Written Essays - 1500 Words. https://studentshare.org/engineering-and-construction/2066804-engineering-project-management.
“Engineering Project Management Research Proposal Example | Topics and Well Written Essays - 1500 Words”. https://studentshare.org/engineering-and-construction/2066804-engineering-project-management.
  • Cited: 0 times

CHECK THESE SAMPLES OF Engineering Project Management

Project Planning in Teams

hellip; Project Planning is essentially a subset of project management that mainly deals with the allocation of resources; these resources can vary in types, for example, human resources, technological equipment, time scheduling, etc.... It discusses the structuring of a project, the work breakdown structure, the task allocation, an establishment of controls and risk management.... The paper investigates the project planning in teams.... While planning a project, the initial step is defining its scope and the relevant procedures, following which; the project can be moved to the completion stage....
4 Pages (1000 words) Coursework

Civil Engineering Management Portfolio

The job of a Civil engineering project Manager is no longer planning & execution of construction projects but is also linked with commitment to local & global environment, the local ecosystem, the society and the overall safety of the infrastructure from the perspective of the workers and the end users.... Civil Engineering and the associated sub-disciplines are changing rapidly as a result of technology enhancements, growing concerns on local & global environment problems & commitment required to the ecosystem and the overall management system & quality control procedures that collectively comprise of the management portfolio of the profession....
12 Pages (3000 words) Assignment

Projects by Gray and Larson

For instance, PMI has created global standards of excellence for project management and so has National Competency Standards for project management (NCSPM 2007).... The primary purpose of project management is to ensure that the customer requirements are met within the budgeted time and cost, in addition to the resources and performance specifications.... May be the customer or the company's management might bring up a time control in the plan which might make the project manager to recast the plan she has drawn....
6 Pages (1500 words) Essay

Succession & Retention of Offshore Managers

The author also seeks insight into the challenges associated with maintaining a globally diverse, international personnel base for engineering projects.... Moreover, risk assessments have become increasingly important, further narrowing the scope of recruitment and retention and enhancing their importance (Bullion,… Offshore projects involve a global personnel base, which poses yet another challenge to successful implementation of good human resource practices. ...
4 Pages (1000 words) Essay

Statement of Purpose for Masters in Engineering Management

From this course I am optimistic that I will acquire invaluable knowledge as well as skills in courses like Concepts of Financial and management, Management of Engineering Teams, Management Accounting, Engineering Project Management and Financial Engineering while keeping abreast with the latest developments in the discipline of technology.... This is another role that has exposed me to business support in wealth management space for clients.... Whereas creativity, hard work and technological proficiency are the building blocks of an enterprise, another key determinant of success in a world full of uncertainties and competition is possession of skills in management....
2 Pages (500 words) Personal Statement

Project management plan

The objective of this project is to design part of a new ‘super cycleway' route connenction between the proposed high speed rail station at Toton and Nottingham City Centre.... The intention is to arouse the imagination of the local residents and create a pardigm shift towards… The cycleway project ultimate vision is to create an environment that will attract investments along the route.... This project will provide a safe, direct, paved, flat and continuous non-vehicular travel route between the station and the city....
7 Pages (1750 words) Essay

Project Management Plan

"project management Plan" argues that Effective preparation, planning, and proper implementation of a project is fundamental to the success of any client's job, within the built environment and construction sector.... nbsp; The procurement route refers to the complex relationships formed between clients, project management consultants, contractors, and construction managers, to enable a building/ construction project to succeed.... The design and built contracting management and the justification of the selected final procurement route based on the client's needs....
7 Pages (1750 words) Coursework

Engineering Project Management Portfolios

The study "Engineering Project Management Portfolios" focuses on the critical analysis of the peculiarities of the two types of Engineering Project Management portfolios, namely PRNCE2 Project Management Methodology, and Project Management Body of Knowledge.... hellip; PRINCE2 is one of the commonly used project management methodologies internally, that was originally developed to manage IT projects by the UK government.... The methodology was formed based on seven principles: to continue with business justification, learn from the experience, defined roles and responsibilities, management guided by stages, exceptional management, and tailored approach that suit project management (Harris, 2010, 122)....
9 Pages (2250 words) Case Study
sponsored ads
We use cookies to create the best experience for you. Keep on browsing if you are OK with that, or find out how to manage cookies.
Contact Us