Literature review sample - Mobile computing and wireless communications for construction projects

Mobile computing and wireless communications for construction projects Literature review example
Masters
Literature review
Engineering and Construction
Pages 16 (4016 words)
Download 0
The construction industry is based on a multi-organization practice that involves intense reliance on communication between the parties inside and outside the business. Project communication has become more and more complex…

Introduction

At present, the majority of construction businesses necessitate flexibility for their staff about place and time. In this scenario, information and communication technology (ICT) and its products (such as mobile and wireless computing) offer the independence of mobility to members in the construction market and business. Additionally, the wireless connectivity and mobile technologies can be implemented in construction sites in an attempt to ensure real-time data transferred all through the business tasks (Garza & Howitt, 1998; Koseoglu & Nielsen, 2005). In addition, it is believed that the acceptance and implementation of modern technologies such as mobile and wireless computing inside the construction sector is not up to scratch, in particular when related to the considerable research endeavor and outlay taking place inside this sector. On the other hand, there are several instances of wireless computing, and yet location aware computing that have been implemented effectively within the construction sector and shown fruitful results. Moreover, these instances have demonstrated how successful implementations of mobile and Wireless Computing have received greater user acceptance and shown an amazing return on investment within one year of implementation (May et al., 2005). Furthermore, the mobile and wireless computing has gained popularity in the past few years. ...
Download paper
Not exactly what you need?

Related papers

Causes of Rework and cost overuns in construction of sea water desalination projects in Kingdom of Saudi Arabia
Desalination is a very important term, especially for the countries where fresh water resources are scarce. It could be any process that removes a vast amount of salt and other minerals from the water. Habitually, it is known as the procedure of drawing the salts and minerals. It is best to purify your water with the process of desalinated and then use it for drinking and as well as for…
8 pages (2008 words)
Significance of Stakeholder Management in Construction Projects
Any uses made within it of the works of other authors in any form (e.g. ideas, equations, figures, text, tables, programmes) are properly acknowledged at the point of their use. A full list of the references employed has been included. Signatures Date: February, 2012 TABLE OF CONTENTS List of Tables List of Figures Acknowledgement Abstract Chapter 1: Introduction 1.1 Background/Rationale 1.2…
60 pages (15060 words)
Monitoring, tracking, and control technology on aviation industry.
The return of the airline systems to their normal schedules largely depend on the need and emergency of the schedule. For instance, there may be airline systems that require the schedule to get back to their normal plans by the next day. Hence controllers in this regard would cancel the flights or shift the passengers to other carriers, and then have time for the necessary measures (Yu, 1998,…
24 pages (6024 words)
Analysis of Soft Systems Methodology in Relation to Construction Projects
.6 Methodology of SSM in Construction Project Risk Management.7 Limitations of SSM and Need to use Hard Systems.8 References.10 Analysis of the Soft Systems Methodology in Construction Projects Construction projects are complex processes that incorporate many skills, materials, and different operations (Sears et al, 2008). There is therefore a need for numerous skills and techniques to be put…
7 pages (1757 words)
Scheduling Management in Tunnel Construction Projects
45). Scheduling management Scheduling management is very important to any project because it entails helpful techniques applicable while managing activities involved in projects. Managers practice scheduling management before starting up a project, which involves. Pointing out the task that interests an individual, estimating the total period that the task will take, and distributing resources…
7 pages (1757 words)
Construction Project Management (International projects. An analysis of about six construction projects which take place in two
Otherwise chances are high that if only the typical constrains of project management are considered, projects may not meet they objectives with these constrains. The problem becomes worse when a project is jointly undertaken by two nations. The purpose of this paper, therefore, is to analyze not more than six construction projects undertaken in two nations in order to identify factors that may be…
7 pages (1757 words)
A PERSPECTIVE OF SKILLS NEEDED BY MODERN PROJECT MANAGER TO AVOID DELAY PENALTIES IN CONSTRUCTION PROJECTS
They face a number of challenges that revolve around construction issues such as time constraints, workforce considerations, safety and continually shifting nature of work. They also face non construction related challenges such as government regulations, legal issues, socio-political pressures and environmental concerns. It is thus important to find out how we can raise the efficiency of project…
51 pages (12801 words)