Value Management/ Value Engineering - Assignment Example

Only on StudentShare

Extract of sample
Value Management/ Value Engineering

The aspect of VM operates under a well structured schedule of process. This allows the functional needs and alternative resolutions, linked with their costs to be recognized and incorporated to strict timetable (Pinto 2008, p. 128). 2. Defining the Concepts Value management is different from value engineering in that value engineering entails attaining specific functions at reduced cost or holistic life cost while value management entails the process of defining the actual meaning of value within a confined context in the building industry. The concept of value management ensures that there is definitive agreement of objectives and making sure that the solutions are aligned with these objectives. The value engineering answers on how while value management answers the questions on WHY. Value management concept is a sequence of process with proven techniques that are systematically brought together to recognize better project, services, and the industry projects. Both the VE and VM have the same process thus using the same methodology (Kendrick 2006, p.243). The process of VM works in a top-down approach, which starts from the requirements and the objectives and aims on the root causes and not the signs. ...
Download paper

Summary

Value Management /Value Engineering Name: Institution: Value Management /Value Engineering 1. Introduction Value management is an organized and structured procedure of team anchored on decision-making.VM focuses at attaining worth for a project or procedure by defining the various components needed to attain value objectives and availing those components at a minimum cost, which are reliable with the anticipated worth and performance…
Author : crunte

Related Essays

Assessment of risk management perceptions and practices of construction contractors in Saudi Arabia
43 pages (10793 words) Essay
The quality of risk management in the Civil Engineering
28 pages (7028 words) Assignment
The quality of risk management in the Civil Engineering
8 pages (2008 words) Assignment
Value and Risk Management essay
10 pages (2510 words) Essay
Construction Engineering
7 pages (1757 words) Assignment
Value & Risk Management
18 pages (4518 words) Assignment
Engineering Management and Globalization
3 pages (753 words) Essay
Got a tricky question? Receive an answer from students like you! Try us!