SCHEDULING MANAGEMENT IN TUNNEL CONSTRUCTION PROJECTS Name: Instructor: Task: Date: Scheduling Management in Tunnel Construction Projects Introduction Scheduling Management refers to a plan drawn to show the steps followed while conducting a project. Scheduling management acts as guidance to all the scheduling processes involved in plans, and it defines all the protagonists and duties for stakeholders in a project…

Introduction

45). Scheduling management Scheduling management is very important to any project because it entails helpful techniques applicable while managing activities involved in projects. Managers practice scheduling management before starting up a project, which involves. Pointing out the task that interests an individual, estimating the total period that the task will take, and distributing resources needed to perform that task, finally deciding on when the task will commence. In the procession of a project, monitoring is important as it ensures that scheduling management predicts the future of a project. An effective scheduling management helps the project administrator to ascertain that a project is within the expected cost, time and certain standards of quality (Kerzner, 2009, p. 47). Scheduling management techniques There are two types of scheduling management techniques applied in projects in order to enhance efficiency. These techniques include the Milestone chart and the Gantt chart. ...
Download paper
Not exactly what you need?

Related papers

Significance of Stakeholder Management in Construction Projects
Any uses made within it of the works of other authors in any form (e.g. ideas, equations, figures, text, tables, programmes) are properly acknowledged at the point of their use. A full list of the references employed has been included. Signatures Date: February, 2012 TABLE OF CONTENTS List of Tables List of Figures Acknowledgement Abstract Chapter 1: Introduction 1.1 Background/Rationale 1.2…
Mobile computing and wireless communications for construction projects
At present, the majority of construction businesses necessitate flexibility for their staff about place and time. In this scenario, information and communication technology (ICT) and its products (such as mobile and wireless computing) offer the independence of mobility to members in the construction market and business. Additionally, the wireless connectivity and mobile technologies can be…
Construction Management
Different sizes of projects require different services, and so before one makes a decision on the system to use to require the services, size is one of the basic things to consider. This report is about the construction project that we undertook. Being the four of us, each member was given a different role and each member had to closely work together with the other members of the group in order to…
Construction Project Management (International projects. An analysis of about six construction projects which take place in two
Otherwise chances are high that if only the typical constrains of project management are considered, projects may not meet they objectives with these constrains. The problem becomes worse when a project is jointly undertaken by two nations. The purpose of this paper, therefore, is to analyze not more than six construction projects undertaken in two nations in order to identify factors that may be…
Risks management analysis during Construction stage and Operational stage of the Channel Tunnel Project
This serves to mitigate the risk of resource shortage for the project, through the application of the principle of maximizing utilization of the resources, to ensure that they fit into the project schedule. Program monitoring and control is yet another vital risk mitigation concept under the construction phase, which entails consistent and regular evaluation of every single aspect of the project…
construction management
The schedule may specify the specific roles for the unskilled and skilled. For instance, starting time can be set at 7am and ending at 5pm. Similarly, construction manager is required to consider the pay rate of overtime schedule. The major role of the unskilled workers involves preparation of construction material mix, timely. The superintendent is responsible in carrying out the activities as…
scheduling
And this is apart from the fact that project cost is curbed significantly. Another way is to extend the deadline of the project. By extending the deadline of the project, the same workers are given the chance to work on the subsequent stages of the construction and by doing this, less manpower will be need to carry out various tasks. This is a sort of delaying the duration a little bit to preclude…