StudentShare solutions
Got a tricky question? Receive an answer from students like you! Try us!

Essay example - channel tunnel

Only on StudentShare
Undergraduate
Essay
Engineering and Construction
Pages 3 (753 words)
Channel Tunnel Order No. 745930 Table of contents 1. Introduction 2. Structural Design 3. Foundation Design 4. Others Introduction In 1985, the Euro Tunnel was part of a competition and had won the first place for its spectacular design genius. The Euro Tunnel (ET) is a bi-national company comprising of Channel Tunnel Group (UK) and its owner and chief operator of the project France Manche S.A (FR) The Euro Tunnel comprises of 3 tunnels i.e…

Extract of sample

The Transmanche Link (TML) is the contractor who is responsible for the Channel Tunnel design, construction and commissionioning of the project. Design of the Channel Tunnel The design scale was massive and highly intricate and hence it was categorized into five divisions – a) System throughput b) Performance of shuttle trains c) Environment d) Safety and passenger evacuation e) Scenarios and operational procedures The design of the Channel Tunnel included four phases: 1. Development Study 2. Outline Design APS) 3. Definitive Design (APD) 4. Detailed Design (PEO) The design of the project was so intricate and diverse with a huge volume of work and specialties involved that sub-contracts making use of the expertise of major independent companies were accepted. Design teams such as BETU (Tunnel design office) and BETER (Terminal design office) contributed their expertise. 1. Structural design a) The Service Tunnel The Service Tunnel Transportation is designed with 24 rubber-tyred vehicles rolling along at top speed of 80 kph that is electronically guided by cables that are embedded but allows for the maintenance of permanent equipment. These shuttles are 650m in length having a single deck. ...
Download paper
Not exactly what you need?

Related papers

HS2- cost vs benefits
The Government’s base of argument is on the projected forecasts that are unreal. The painful experience gathered from HS1 project is concrete evidence for evaluation of the project. The project will create demand for high-costs and taxpayer-funded transport capacity. The benefits alleged by the Department for Transport remain wanting. BACK GROUND KNOWLEDGE ON HIGH SPEED RAIL The high speed rail…
12 pages (3012 words)
West Coast Mainline Modernisation. Project Analysis.
The various transportation facilities and infrastructure that are developed in the process are roads, bridges, rails and other facilities that aid in mobility and access. These developments are done in stage or per project basis that ascertains specific end-results employing project management. Project Management is previously a management philosophy that soon evolved into a business process…
8 pages (2008 words)
Measured Building Survey
It comments on the current state of all parts of the structure. These parts of the building are physically inspected but limited to the scope of services offered by the building surveyor. Major defects survey is also referred to as main elements survey. For this type of survey, focus is on the main parts of the structure. Inspection and report concentrate on selected areas like roofs, floors,…
8 pages (2008 words)
A New Tunnel under the Thames
7. Include a set of drawings of your proposed tunnel, including a. a detailed cross section, b. a long section c. a map showing your suggested new road layout and d. a map indicating remedial works to minimise the impact of the extra traffic on the surrounding areas. 8. The site designated for the northern access (between Galleons Reach DLR and the river) is currently a brown field site with…
6 pages (1506 words)
Construction Project Management
This paper stresses that other than the typical constrains of managing construction projects such as time, cost and scope, there exist a number of factors that may inhibit successful completion of construction projects however how well a construction Manager may be. The problem may become worse while managing projects that are jointly undertaken by two nations. Some of these factors may include…
6 pages (1506 words)
Risks management analysis during Construction stage and Operational stage of the Channel Tunnel Project
This serves to mitigate the risk of resource shortage for the project, through the application of the principle of maximizing utilization of the resources, to ensure that they fit into the project schedule. Program monitoring and control is yet another vital risk mitigation concept under the construction phase, which entails consistent and regular evaluation of every single aspect of the project…
3 pages (753 words)
Risks management analysis during Development stage of the Channel Tunnel Project, Including management of environmental risks du
(Yan-juan, Ding-li, & Jian-jun, 2009 p2). This is then followed by the assessment of the influence of the excavation on underground strata structures, and how such excavation might lead to their deformation. To reduce the probability of these risks, the Construction, Design and Management Regulations have been developed to aid the monitoring and avoidance of the risks. The necessary controls are…
6 pages (1506 words)