Similarly, for an off-site yard, lifts, trucks, and heavy loading equipments become the main tools of construction (Mincks and Johnston 155). The role of geotechnical engineers is very important in choosing the best site for construction. Geotechnical engineering is a field of study within the parameters of civil engineering and is related directly with the study of behavior of earth materials and finding solutions for behaviors of rocks and soil present at any particular part of land. Sometimes, the irregular behavior of rocks and soil gives rise to land contamination issues where some hazardous chemical substances, heavy metals, and hydrocarbons crop up at concentrations above the background levels. Geotechnical engineers need to address these issues in order to make constructions sites safe for life. In this paper, we will discuss the role of geotechnical engineering in making a contaminated site ready for construction. There will also be a discussion on the need of health and safety management for employees related to the field of engineering and construction. Geotechnical Engineering Geotechnical engineering is a field of study concerned with the behavior of rocks and soil present at any particular area. ...
Download paper

Summary

[Your full name] [Instructor’s full name] April 21, 2013 Managing Construction Site Constraints Introduction Study of construction site constraints is extremely important to conduct before actually staring construction works because these constraints can lead to unexpected delays in the overall construction work…
Author : brant14

Related Essays

Constructing a motorway (civil engineering project)
This essay discusses that a motorway can be defined roughly as a main road or highway, with two or more lanes on opposite direction, and where fast motor traffic occurs. A motorway has to be well constructed with all the required plans, materials and skilful engineering needed to provide a long-lasting use for motorists. As the Junior Site Manager of a 30-mile motorway, my job is to provide the plan and the necessary activities to have a smooth flow of construction, maintenance and completing of this motorway. But before going on an analysis of the construction parameters, I deemed it...
11 pages (2761 words) Essay
engineering and construction
. 30 Task 1 Laminar flow Laminar flow is a type of flow where fluids generally move at low velocity. The layers of the fluid slide by one another. There is no lateral mixing of the fluid and no formation of eddies, cross current or any swirls. Particles of the fluid move in straight line in orderly manner parallel to the boundary walls which can be seen in straight sections of pipes. It generally occurs at a Reynolds number below critical value of 2040. Turbulent flow Turbulent flow is a type of flow that occurs in large velocities characterized with the formation of eddies, swirls and other...
12 pages (3012 words) Essay
Management styles within the cultures of UK- and Iran-based construction joint ventures
Case Study) 27 Chapter 6 - Presentation and Discussion (Semi Structured Interview) 30 Chapter 7 – Recommendations 33 Chapter 8 – Conclusion Limitation and Future Research 34 8.1 Conclusion 34 References 36 Bibliography 41 Appendix – Semi Structured Interview Questions 44 LIST OF TABLES & FIGURES Table/Figure Page No. Cultural Differences between Iran and UK 13 Culture Comparison of Iran and UK 13-14 Comparative chart from the case study 24 Similarity Chart from the case study 24 Abstract The management style adopted by a firm plays an indispensible role in the success of that firm.
46 pages (11546 words) Dissertation
Construction Engineering
When the constructed facility is offered proper management and maintenance, the facility may last 100 years or more; the facility is also capable of serving different functions within the specified time. The actual lifetime of a property is dependent on a number of factors, including the quality of design, the durability of the materials used for the construction, the quality of the facility and the technology used (Edwards, Bartlett and Dickie 2-7). Other factors determining the lifetime of the facility include the local climate and the location, extent of use and the damage caused by human...
7 pages (1757 words) Assignment
Construction Engineering
Following are the steps involved in designing new hospitals in Canada(Martin). First and foremost step is designing the patient care areas which may either be for a single patient or for multiple patients. These areas are designed for proper HVAC conditions so that least energy is consumed to maintain required environmental parameters. These areas are usually provided with a window or wall that is directly exposed to harsh weather conditions. Therefore, proper supply and exhaust outlets are provided in order to provide isolation from air borne infections. Rooms being designed for patients with...
7 pages (1757 words) Assignment
Construction Engineering
Whether or not a power plant can be built on a specific location is determine by carrying out technical surveys based on following recommendations. Supply of raw material to the place is convenient .i.e. the construction site is provided by roads to transport goods to that part of the area. Must have ample space to accommodate construction machinery. Must have proper area for dumping mud extracted from the construction site. Quebec is rich in places that are suitable for the construction of power plant. For the construction of such a facility in Quebec, following considerations are followed....
6 pages (1506 words) Assignment
Construction Engineering
The essential ethics topics for training in construction industry include; a. The interest of stakeholders: The purpose of the project must meet the demands of the stakeholders in the project. Therefore, professionals are required to understand the need of the stakeholders and work towards their satisfaction. b. Conflict of interest: The decisions made must be professional and business oriented at the interest of the employer or profession. Any relationship that may be perceived to impair a project’s objectives must be checked. c. Compliance to legal issues: The actions of engineers must...