Managing Construction Site Constraints

 Geotechnical engineering is a field of study concerned with the behavior of rocks and soil present at any particular area. The features of geotechnical engineering are not just restricted to construction of buildings; rather it serves many other areas that include petroleum, military, and mining (Benny). Some of the main areas of study covered by geotechnical engineering include soil mechanics, rock mechanics, and design of foundations. Geotechnical engineering plays a key role in site development and, in particular, in designing foundations of a building. According to Rowe, geotechnical engineers study the behavior of soil and rocks in order to determine their physical and chemical properties that are necessary to be investigated at the earliest stages of building design (31). Based on investigations, engineers move towards the process of designing soil stabilization system in order to overcome the soil contamination problems.Working of Geotechnical EngineersThe first thing geotechnical engineers do in building design process is starting the design process by taking soil samples from the land where construction is to be started. The purpose is to determine the environmental impact on the soil of the site. Some other aspects of the site that geotechnical engineers study include chemical properties of soil, soil stability, and the presence of air pockets in the soil. The results of these tests determine the viability of the decision to start construction at the site or not.   ...Show more

Summary

 The writer of this paper "Managing Construction Site Constraints" thinks that study of construction site constraints is extremely important to conduct before actually staring construction works because these constraints can lead to unexpected delays in the overall construction work…
Author : brant14
Save Your Time for More Important Things
Let us write or edit the research paper on your topic
"Managing Construction Site Constraints"
with a personal 20% discount.
Grab the best paper

Related Essays

Construction in Dubai
The paper tells that in the modern industrialized world, construction usually involves the translation of designs into reality. The lack of awareness/low level of education of the construction workers, multi level subcontracting, high mobility of workforce etc can be considered prime reasons for construction hazards in many countries.
10 pages (2500 words) Assignment
Lean construction
Lean thinking is basically a manufacturing based concept of implementation but has since been implemented successfully in government and healthcare projects to reduce waste and improve efficiency. Lean thinking in construction is essential as the industry generates the highest waste among all industries and the complex and dynamic nature of the industry has not deterred the implementation of lean.
23 pages (5750 words) Essay
Development Process in Construction Management
The process of development and construction narrows down to management theories applied and the effectiveness in which such theories are applied in the building and construction process. Construction managers and contractors in order to remain competitive in the current globalised world, have to be conversant with the appropriate theories and practices in the modern management fields to cope with a fast challenging global market.
6 pages (1500 words) Essay
Overload protection systems and mechanics of machines
Overload protection systems normally feature overload switches or relays that serve to cut off power supplies to certain elements of the system and, therefore, prevent the machine from working normally (Gurevich 2003, p. 57).
5 pages (1250 words) Essay
Modular Construction
Housing in the UK has seen tremendous growth since the dawn of the twenty-first century (Dominic Fenn, 2005i). Alongside, the increase in the number of buildings in the commercial front has also seen tremendous growth making it clear that the construction industry is one of the critical business sectors in the UK.
30 pages (7500 words) Dissertation
DEVELOPMENT PROCESS IN CONSTRUCTION MANAGEMENT
The process of development and construction narrows down to management theories applied and the effectiveness in which such theories are applied in the building and construction process.
6 pages (1500 words) Essay
Water wave
First, just as other forms waves such as transverse waves and longitudinal waves, are characterized by: Amplitude, Crest, Troughs, Periods, Frequency, and Wave height. Secondly, it was found out that as water waves travel
10 pages (2500 words) Research Paper
Construction project (site and environment)
Micro means the small scale things while Macro means the things on a large scale. For instance, a micro climate is particular to area that is small. Micro site will involve in detail study of the immediate context and proposed project. The project
2 pages (500 words) Research Paper
Managing Construction
The most widely recognized single variable measure is labor productivity. In the event that yield is homogenous, it could be measured in physical units. In the event that a period arrangement is coveted, the
8 pages (2000 words) Essay
Find out how much would it cost
to get a custom paper written by a pro under your requirements!
Win a special DISCOUNT!
Put in your e-mail and click the button with your lucky finger
Your email
YOUR PRIZE:
Apply my DISCOUNT