Got a tricky question? Receive an answer from students like you! Try us!

Management styles within the cultures of UK- and Iran-based construction joint ventures - Dissertation Example

Only on StudentShare
Author : myles17

Summary

School of Engineering and Mathematical Sciences A Comparative Analysis of Management Styles within the Cultures of UK- and Iran-based Construction Joint Ventures By Benyamin Amiri Dissertation MSc in Construction Management Supervisor: Dr Keith Jackson London 30 August 2013 Table of Contents School of Engineering and Mathematical Sciences 1 Table of Contents 2 LIST OF TABLES & FIGURES 4 1.Introduction 6 1.1Background 6 1.2 Research Focus 8 1.3 Overall Research Aim and Individual Research Objectives 8 1.4 Value of this Research 11 Chapter 2 - Research Methods 11 2.1 Quantitative Research 12 2.2 Qualitative Research 12 2.3 Data Collection and Sampling 13 2.3.1 Case Study 13 2.3.2 Semi Structure…

Extract of sample
Management styles within the cultures of UK- and Iran-based construction joint ventures

Case Study) 27 Chapter 6 - Presentation and Discussion (Semi Structured Interview) 30 Chapter 7 – Recommendations 33 Chapter 8 – Conclusion Limitation and Future Research 34 8.1 Conclusion 34 References 36 Bibliography 41 Appendix – Semi Structured Interview Questions 44 LIST OF TABLES & FIGURES Table/Figure Page No. Cultural Differences between Iran and UK 13 Culture Comparison of Iran and UK 13-14 Comparative chart from the case study 24 Similarity Chart from the case study 24 Abstract The management style adopted by a firm plays an indispensible role in the success of that firm. ...
Download paper

Related Essays

Construction Cost Control & Management
In conclusion of the research, the PERT chart has been critically used to schedule, organize, and coordinate the tasks in this project. It has effectively ascertained the expected time of the project for effective planning and accountability of time and estimation of resources and cost. From the analysis, the pessimistic, normal and optimistic time were estimated. This was critical in showing the various activities keeping in mind their dependence to each other and particular independence. From the analysis with help of the PERT diagram, the critical path procedure shows that the estimated…
15 pages (3765 words)
State of the UK construction industry
These changes in growth of the construction industry in United Kingdom point to long term stagnation and possible shrinking of the industry. While the global financial crisis has been blamed far and wide for these drops in performance across many industries but it must be realised that industrial shortcomings have also contributed to these changes. The current situation is unlike but comparable to stagnation in the construction industry in the past. The previous periods of stagnation and negative growth in the construction industry required government impetus to crawl out of their problems.…
16 pages (4016 words)
BIM in Construction and Knowledge Management within Dubai
Any uses made within it of the works of other authors in any form (e.g. ideas, equations, figures, text, tables, programmes) are properly acknowledged at the point of their use. A full list of the references employed has been included.
60 pages (15060 words)
Effects of Competitiveness on the UK Construction Industry
The success of an organisation in a given nation highlights the important factors that the organisation controls when compared to other organisations (Jones & Saad 2003). The UK construction industry enjoys various competitive factors that enable it to succeed in the current market. Some of the competitive factors within the industry include the good leadership strategies, strategic advantage, market advantage, good marketing strategies; furthermore, they have knowledgeable personnel, production advantage, modern technology, finance advantage, good administration and risk management advantage…
6 pages (1506 words)
Construction Management
Different sizes of projects require different services, and so before one makes a decision on the system to use to require the services, size is one of the basic things to consider. This report is about the construction project that we undertook. Being the four of us, each member was given a different role and each member had to closely work together with the other members of the group in order to succeed. Negotiation was very important in the whole process as every member of the group had to convince the other three members of the group to sign the given roles assigned to each member. Since…
4 pages (1004 words)
BIM and Construction management
The models created through BIM can be accessed by all concerned sides in the construction process for any adjustments or decision making in regard to how the construction work is to continue, how the building or facility will be used and if need be how demolition for the same will be done. It goes beyond the 2 dimensional representations of buildings on paper as plans, sections and elevations; and gives information about a building in three dimensions in addition to other details like light analysis, building components and their properties, quantities of building including excavation and…
4 pages (1004 words)
construction management
The schedule may specify the specific roles for the unskilled and skilled. For instance, starting time can be set at 7am and ending at 5pm. Similarly, construction manager is required to consider the pay rate of overtime schedule. The major role of the unskilled workers involves preparation of construction material mix, timely. The superintendent is responsible in carrying out the activities as instructed by the construction manager and with the help of the project or center map. The function of the superintendent to perform close examination to ensure that, the laid daily schedule is followed…
4 pages (1004 words)